Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHGM.L Regulatory News (HGM)

  • There is currently no data for HGM

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Exploration results

18 Jul 2011 07:00

RNS Number : 5060K
Highland Gold Mining Limited
18 July 2011
 



POSITIVE EXPLORATION RESULTS FROM UNKURTASH PROJECT, KYRGYZSTAN

 

18 July 2011 - Highland Gold Mining Limited ("Highland Gold", or the "Company") is pleased to announce positive results from its ongoing exploration programme located at Unkurtash in Kyrgyzstan. These latest results continue to underline the Company's intention to substantially increase the initial 42.9 tonnes (1.38 million oz) of gold reserves (C1+C2 category) which were recently approved by the regulatory authorities and are consistent with the Company's expectations of developing a world class gold deposit at Unkurtash. The Unkurtash project includes three distinct prospects: the Unkurtash, Sarytube and Karatube located within the Company's exploration licenses.

 

At the Unkurtash prospect the new drilling results corroborate the recently established reserve estimate (C1+C2 category), which was based on results from the 2009 drilling campaign. The current results are expected to significantly improve key parameters of the resource model and respective resource categories.

 

 

Unkurtash Prospect - RC Drilling Highlights 2011

Drill Hole Id

Drill Hole Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

U-RD-101*

160.0

142.00

154.00

12.00

1.69

U-RD-102*

249.0

131.00

133.00

2.00

19.23

U-RD-106*

134.0

67.00

87.00

20.00

1.15

U-RD-114*

202.0

114.00

127.00

13.00

2.70

U-RD-115*

224.0

121.00

134.00

13.00

1.95

U-RD-124*

230.0

200.00

205.00

5.00

4.07

U-RD-17A*

201.0

142.00

149.00

7.00

3.85

U-RD-62*

205.0

25.00

36.00

11.00

1.92

U-RD-75*

210.0

0.00

14.00

14.00

2.68

U-RD-79*

192.0

88.00

115.00

27.00

1.02

U-RD-88*

215.0

57.00

68.00

11.00

2.12

U-RD-92*

252.0

17.00

24.00

7.00

2.93

235.00

246.00

11.00

2.01

U-RD-11A

240.0

131.0

145.0

14.0

2.15

U-RD-13A

208.0

53.0

64.0

11.0

5.07

68.0

83.0

15.0

1.75

U-RD-19

206.0

22.0

48.0

26.0

1.95

63.0

73.0

10.0

3.05

U-RD-56

205.0

111.0

125.0

14.0

6.56

130.0

140.0

10.0

6.09

U-RD-65

241.0

15.0

22.0

7.0

3.73

102.0

116.0

14.0

1.49

U-RD-67

250.0

231.0

249.0

18.0

1.54

U-RD-68

230.0

48.0

66.0

18.0

1.23

94.0

109.0

15.0

4.64

U-RD-74

205.0

128.0

192.0

64.0

4.31

U-RD-77

222.0

12.0

15.0

3.0

7.12

U-RD-78

220.0

23.0

37.0

14.0

3.41

62.0

80.0

18.0

1.68

144.0

170.0

26.0

2.07

U-RD-83

227.0

29.0

46.0

17.0

1.87

U-RD-86

205.0

113.0

127.0

14.0

3.16

U-RD-87

250.0

171.0

189.0

18.0

1.22

Reverse circulation drilling. - Drill hole inclination from surface: 50 - 60 degrees; Intersects defined by cut-off grade of 0.7 g/t, 3 metre maximum waste interval, and 3 metre or 2.1 gram*metre minimum ore interval. Fire assays completed by Alex Stewart Group laboratories, Kara Balta, Kyrgyzstan. Asterisks (*) denote drill holes drilled in late 2010 for which results were received in 2011.

 

Deep drilling from the surface to a maximum depth of 450 metres at the Unkurtash ridge is now underway. This aims to test the continuity of gold mineralisation through to the underground exploration development which is intended to delineate gold mineralisation over a strike length of 800 metres by means of a main drift and a systematic grid of crosscuts spaced at 80 metre intervals.

The initial results received from wall channel-sampling of underground crosscuts are in accordance with the Company's in-house geological model and highlight the potential to increase the vertical extent of the current resource model by an additional 100 to 250 metres:

 

Unkurtash Prospect - Underground Sampling - Highlights 2011

Crosscut Id

Cross Cut Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

A4C5_L

99.0

12.0

19.0

7.0

1.04

46.0

50.0

4.0

1.83

54.0

64.0

10.0

5.71

 

A4C5_R

69.0

70.0

1.0

11.40

77.0

84.0

7.0

1.27

14.9

16.3

1.4

7.66

46.0

59.5

13.5

1.45

80.2

84.0

3.8

1.97

Adit #4, 1650 m level asl. - Continuous channel sampling (3 x 5 cm channel cut by rock saw on left [L] and right [R] walls of crosscut) - Intersects defined by cut-off grade of 0.7 g/t, 3 metre maximum waste interval, and 3 metre or 2.1 gram*metre minimum ore interval. Fire assays completed by Alex Stewart Group laboratories, Kara Balta, Kyrgyzstan.

 

At the adjacent and geologically similar Sarytube prospect, initial results within a 900 by 500 metres wide drill zone corroborate the geological potential and continuity of gold mineralisation extending through from Unkurtash underlining the potential for Sarytube to host mineral resources comparable to that of the Unkurtash prospect:

 

Sarytube Prospect - RC Drilling Highlights 2010/2011

Drill Hole Id

Drill Hole Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

S-RD-09*

253.0

26.00

46.00

20.00

1.41

101.00

142.00

41.00

1.48

S-RD-10*

202.0

121.00

125.00

4.00

7.67

S-RD-13*

212.0

112.00

119.00

7.00

5.07

S-RD-14*

232.0

156.00

184.00

28.00

5.24

S-RD-42

244.0

185.0

193.0

8.0

3.46

S-RD-85

194.0

15.0

28.0

13.0

2.49

S-RD-113

232.0

112.0

130.0

18.0

5.02

189.0

198.0

9.0

3.58

S-RD-118

219.0

0.0

13.0

13.0

1.59

S-RD-119*

216.0

122.00

137.00

15.00

2.34

S-RD-120

247.0

80.0

82.0

2.0

12.24

S-RD-124*

201.0

45.00

51.00

6.00

4.01

S-RD-138

148.0

17.0

33.0

16.0

2.31

Reverse circulation drilling. - Drill hole inclination from surface: 50 - 60 degrees; Intersects defined by cut-off grade of 0.7 g/t, 3 metre maximum waste interval, and 3 metre or 2.1 gram*metre minimum ore interval. Fire assays completed by Alex Stewart Group laboratories, Kara Balta, Kyrgyzstan. Asterisks (*) denote drill holes drilled in late 2010 for which results were received in 2011

 

At the Karatube skarn prospect, (located north east of Sarytube) final results from the 2010 drilling programme (received in 2011) are in line with previously reported results:

 

Sarytube Prospect - RC Drilling Highlights 2011

Drill Hole Id

Drill Hole Length[m]

From[m]

To[m]

Intersect Length[m]

Au [g/t]

K-DD-05A

100.2 

66.80

83.10

16.30

1.28

K-DD-36

100.2

9.00

24.00

15.00

2.13

K-DD-38

141.0

33.40

44.80

11.40

2.62

Diamond core drilling. - Drill hole inclination from surface: 50 - 60 degrees; Intersects defined by cut-off grade of 0.7 g/t, 3 metre maximum waste interval, and 3 metre or 2.1 gram*metre minimum ore interval. Fire assays completed by Alex Stewart Group laboratories, Kara Balta, Kyrgyzstan.

 

All three prospects: Unkurtash, Sarytube and Karatube are located within the Company's two licenses:Unkurtash-Andagul (12 km2) and Kassan (51 km2). The combined mineralised zone measures approximately 4,000 metres on strike, ranges from 250-500 metres in width and has a potential vertical extent of at least 350 metres. Intrusion-hosted stockwork type gold mineralisation characterises Unkurtash and Sarytube, while gold at Karatube is associated with skarn-type mineralisation. Previous test work has indicated favourable metallurgy and gold recovery levels via conventional processing methods.

 

The Company's ongoing 2011 drilling programme allocates over 50,000 metres of reverse circulation and diamond core drilling as well as advancing 3,000 metres of underground exploration development in order to test the continuity of the mineralisation across the three prospects. By the end of June 2011 more than 27,000 metres had been drilled at the Unkurtash and Sarytube prospects and more than 1,000 metres of new underground development completed.

 

The Company has committed to audit its GKZ reserves in compliance with JORC standards and this work related to the Unkurtash project is anticipated to be completed during H2 2011. In addition further metallurgical test work is earmarked for H2 2011 and negotiations with regulatory authorities for conversion of the current exploration license into a mining license have been initiated.

 

The Company is making excellent progress with its ongoing exploration programme towards unlocking the full potential of the three prospects and the latest results underline the Company's vision for developing a large open-pit mineable gold resource at Unkurtash. US$20 million of the Company's US$30 million planned 2011 exploration budget are earmarked for this project.

 

Mr. Werner Klemens, Head of Exploration at Highland Gold has reviewed and verified the information contained in this release with respect to drilling and resource / reserves matters. Mr. Klemens holds a Ph.D. in Geology from the University of Toronto. He has 13 years experience in mineral exploration and is a fellow of the Geological Association of Canada. A rigorous quality assurance programme complying with international standards is in effect at all exploration projects and includes duplicate sampling, insertion of standards and check assaying at external laboratories.

For further information please contact:

Highland Gold

Dmitry Yakushkin, Head of Communications + 7 495 424 95 21

Duncan Baxter, Chairman + 44 (0) 1534 814 202

Matrix

Robin Henshall, Partner +44 (0) 20 3206 7172

(Nominated Adviser and Broker)

Nick Stone +44 (0) 20 3206 7343

Fin Public Relations

Alex Glover + 44 (0) 20 7608 2280

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEADXSFDAFEFF
Date   Source Headline
27th Jan 20167:00 amRNSTrading Update for the Second Half of 2015
15th Jan 20167:15 amRNSAppointment of New Chief Executive Officer
23rd Sep 20157:00 amRNSInterim Results Announcement for H1 2015
14th Aug 20157:00 amRNSTrading Update for the First Half of 2015
3rd Aug 20154:30 pmRNSBlocklisting Interim Review
26th May 20154:19 pmRNSAGM Statement
22nd Apr 20157:00 amRNS2014 Final Results
9th Apr 20158:00 amRNSDirectorate Change
3rd Feb 201511:17 amRNSBlock Listing Interim Review
27th Jan 20157:01 amRNSTrading Statement
16th Jan 20154:40 pmRNSSecond Price Monitoring Extn
16th Jan 20154:35 pmRNSPrice Monitoring Extension
31st Dec 201412:35 pmRNSPrice Monitoring Extension
10th Dec 20149:09 amRNSProduction Update
28th Oct 20147:00 amRNSAcquisition re license for exploration and mining
23rd Sep 20147:00 amRNSHalf Yearly Report
12th Aug 20147:00 amRNSTrading Statement
4th Aug 201412:37 pmRNSBlocklisting Interim Review
23rd Jul 201412:00 pmRNSNorth-Western Flank (NWF) Acquisition
27th May 20145:00 pmRNSResult of AGM
21st May 20145:09 pmRNSHolding(s) in Company
9th May 201412:00 pmRNSDistribution of the Annual Report and Accounts
23rd Apr 20147:00 amRNSFinal Results
25th Feb 20145:38 pmRNSStatement re Notification of disposal of shares
4th Feb 20149:11 amRNSBlocklisting Interim Review
29th Jan 20147:00 amRNSTrading Update for the Second half of 2013
21st Jan 20143:56 pmRNSHolding(s) in Company
18th Dec 20132:14 pmRNSDirectorate Change
15th Nov 20134:28 pmRNSNotification of significant holding
18th Sep 20137:00 amRNSHalf Yearly Report
11th Sep 20137:00 amRNSDirector Declaration
22nd Aug 20134:35 pmRNSPrice Monitoring Extension
12th Aug 20137:00 amRNSTrading Statement
5th Aug 20137:00 amRNSBlocklisting Interim Review
18th Jul 20133:09 pmRNSDirector/PDMR Shareholding
15th Jul 20135:12 pmRNSNotification of Major Interest in Shares
11th Jul 201312:19 pmRNSDirector/PDMR Shareholding
11th Jul 20137:00 amRNSBelaya Gora Production Update
21st Jun 20132:35 pmRNSDirector/PDMR Shareholding
11th Jun 201312:00 pmRNSResult of Annual General Meeting
6th Jun 201312:00 pmRNSDirector/PDMR Shareholding
10th May 20137:00 amRNSAnnual Report and Accounts and AGM Notice
29th Apr 201312:40 pmRNSNotification of Major Interest in Shares
23rd Apr 20137:00 amRNSFinal Results
16th Apr 20137:00 amRNSProject Update
2nd Apr 20137:00 amRNSAcquisition
12th Mar 20131:44 pmRNSNotification of Major Interest in Shares
11th Mar 20131:32 pmRNSNotification of Major Interest in Shares
22nd Feb 20133:42 pmRNSNotification of Major Interest in Shares
8th Feb 20135:05 pmRNSNotification of Major Interest in Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.