Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDL.L Regulatory News (EDL)

  • There is currently no data for EDL

Initial Mkomolo 2012 Drill Results

13 Aug 2012 09:45

RNS Number : 8681J
Edenville Energy PLC
13 August 2012
 



13th August 2012

 

EDENVILLE ENERGY PLC ("Edenville" or the "Company")

 

Initial Mkomolo 2012 Drill Results, Rukwa Coal Project, Tanzania

 

Edenville Energy plc (AIM:EDL), the coal focused African energy exploration and development company, today announces receipt of the initial Mkomolo deposit float and sink drill assay results. These results are part of the 2012 resource delineation drill programme which is currently underway at the Rukwa Coalfield project in south western Tanzania.

 

Highlights:

·; Float and sink sample results received

·; Further positive indications of thermal quality coal mineralisation

·; Drilling intersections indicate coal continues to the north of April 2012 resource drilling area

·; Results confirm coal grades and continuity of coal measures

·; Upgraded Mkomolo resource statement expected Q1 2013 with further results from the Rukwa coalfields to be reported during 2012

·; Drillhole results confirm coal measure widths between 4 and 14m within southern portion of the Mkomolo Basin

The results from these initial infill drill holes, collared within the southern portion of the currently defined inferred resource area, have confirmed both coal grades and the continuity of coal measures which will allow our recently appointed consultants, Sound Mining Solutions Ltd. ("SMS") of South Africa, to complete the measured and indicated resource statement. Following the receipt of the laboratory results, the revised statement is expected in Q1 2013.

 

These first 5 drillholes results come from the southern portion of the Mkomolo area with the width of the coal measures in this area being confirmed at between 4 and 14m. All these holes were stopped once they intersected the basement gneisses, as this southern portion of the Mkomolo basin is shallower than the northern section. The holes currently being drilled are stepping out to the north into the deeper portion of the basin, where last year widths of the coal measures were up to 54m, as well as extending the resource northwards.

 

Simon Rollason, Chairman of Edenville, commented today; "I am very pleased to deliver this update to our shareholders of what is growing into an exciting project for the Company. The new drill results confirm the continuation of the coal measures identified in the 2011 programme and will allow the current inferred resource base of 39 million tonnes to be expanded and the resource category to be upgraded, providing increased confidence to the quantity and quality of Edenville's existing resource at the Mkomolo coal project.

 

Site access to the northern exploration area is being prepared and during the field season additional diamond core drilling will be completed at Namwele to allow for a resource statement to be prepared; these results are also anticipated in H1 2013. Geological site investigation is underway at Muze to facilitate drill planning for late 2012. Our recently appointed Tanzanian consultant is active on the Environmental Impact Assessment and we will update shareholders on the progress being made in due course"

 

Coal Quality and Resource Testing

Additional Float & Sink analysis from holes MK12-024, MK12-025, MK12-026, MK12-027 and MK12-028, cored during the 2012 drill programme has now been received from the Alfred H Knight Laboratory, Ayrshire, an internationally accredited coal analysis laboratory in Scotland. This analysis indicates the amount (% yield) and quality of coal that could be obtained from the deposit by mining and processing.

 

The drillholes are located in the southern part of the Mkomolo basin which remains open-ended both to the north and down dip. All holes were drilled vertically.

Extracts from the results are summarised below:

Hole ID

From (m)

To (m)

Interval (m)

Wash R.D.

Moisture %

Ash %

Volatile %

F.C. %

Sulphur %

Gross C.v. MJ/kg

Yield %

MK12-024

123.18

124.12

0.94

F1.80

5.9

36.2

23.8

34.1

3.61

17.304

53.6

125.70

126.60

0.90

F2.00

5.0

31.5

24.0

39.5

3.70

18.611

58.4

MK12-025

182.28

183.04

0.76

F2.00

4.2

27.6

28.4

39.8

4.20

20.648

63.9

183.04

183.97

0.93

F2.00

3.5

33.6

25.6

37.4

1.89

18.828

27.9

183.97

184.67

0.70

F1.90

3.5

35.0

26.2

35.3

2.78

18.247

44.7

184.67

185.97

1.30

F1.70

5.2

36.4

26.3

32.2

2.88

17.319

20.7

MK12-026

179.81

181.60

1.79

F1.80

4.6

35.2

26.6

33.6

5.05

18.254

44.2

182.86

184.87

2.01

F2.00

6.3

27.2

30.4

36.0

6.66

20.404

51.5

186.10

186.82

0.72

F2.00

4.5

39.5

21.3

34.6

1.90

17.258

27.3

MK12-027

175.97

177.00

1.03

F2.00

4.2

37.4

28.7

29.8

4.96

17.632

51.1

178.08

178.90

0.82

F2.00

5.2

33.5

27.4

33.9

4.78

18.654

31.4

178.90

180.35

1.45

F2.00

5.1

33.7

29.8

31.5

4.24

18.625

65.2

180.35

181.48

1.13

F2.00

4.6

34.7

29.2

31.5

3.56

18.514

55.2

184.75

185.55

0.80

F2.00

3.3

30.4

26.1

40.1

2.13

20.129

70.2

MK12-028

9.17

10.38

1.21

F1.90

3.7

37.4

22.9

36.0

2.94

17.864

29.1

10.38

11.34

0.96

F2.00

4.6

28.5

25.9

41.1

2.09

20.813

82.7

20.10

21.04

0.94

F1.90

4.8

34.0

24.9

36.2

3.07

18.564

73.0

21.04

21.70

0.66

F2.00

4.7

35.9

22.3

37.1

2.67

18.018

57.7

22.94

23.70

0.76

F2.00

3.9

39.0

22.3

34.7

3.37

17.245

39.0

Cumulative Results from Fractional analysis (Results are reported on an air-dry basis)

 F.C. - Fixed Carbon, C.V. - Calorific Value

 

In accordance with the AIM Rules, the information in this announcement has been reviewed by Mark J. Pryor, Managing Director of Edenville Energy PLC, a qualified geologist with over 25 years' experience.

 

 

Contact:

 

Edenville Energy plc

Simon Rollason - ChairmanRakesh Patel - Finance Directorwww.edenville-energy.com

 +44 (0) 20 7099 1940 

ZAI Corporate Finance Ltd

Ray Zimmerman/ Marc Cramsie

+44 (0) 20 7060 2220

Newgate Threadneedle

Grahame Herring/Richard Gotla

+44 (0) 20 7653 9855

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLLIFSTTVIVLIF
Date   Source Headline
18th Jul 20197:00 amRNSMining Update
27th Jun 20197:00 amRNSCommencement of Mining at the Northern Area
21st Jun 20191:37 pmRNSHolding(s) in Company
21st Jun 20197:00 amRNSAnnual Results for the year ended 31 December 2018
13th Jun 20192:09 pmRNSRukwa Coal Project Update
3rd Jun 20192:48 pmRNSHolding(s) in Company
31st May 20197:00 amRNSTotal Voting Rights
29th May 201911:07 amRNSHolding(s) in Company
21st May 20193:42 pmRNSHolding(s) in Company
21st May 20197:00 amRNSHolding(s) in Company
20th May 20196:04 pmRNSHolding(s) in Company
17th May 20191:49 pmRNSResult of General Meeting
16th May 20194:02 pmRNSNew Company Presentation
15th May 20194:36 pmRNSPrice Monitoring Extension
15th May 20199:00 amRNSPrice Monitoring Extension
14th May 20197:00 amRNSRukwa Coal Project - Update
9th May 20194:26 pmRNSHolding(s) in Company
3rd May 20191:11 pmRNSHolding(s) in Company
3rd May 20197:00 amRNSUpdate re: Collateral Shares issued to Lind
2nd May 201911:51 amRNSHolding(s) in Company
29th Apr 20197:00 amRNSPlacing and Notice of GM
1st Apr 20197:00 amRNSCorporate Update
15th Feb 20194:08 pmRNSResult of General Meeting & Open Offer
14th Feb 201911:39 amRNSTanesco Update
12th Feb 20193:59 pmRNSHolding(s) in Company
30th Jan 20197:00 amRNSOpen Offer and Notice of General Meeting
29th Jan 20197:00 amRNSAppointment of Nominated Adviser and Broker
25th Jan 20197:00 amRNSNomad Status Update
14th Jan 20197:00 amRNSProject Update
20th Dec 20187:00 amRNSLamella Plant Operational
17th Dec 20187:00 amRNSProject Update
11th Dec 20187:00 amRNSNomad Status
7th Dec 201810:40 amRNSTanesco Re-submission
8th Nov 20187:00 amRNSLatest Tanesco Announcement
6th Nov 20187:00 amRNSConditional Convertible Loan Facility
2nd Nov 20183:51 pmRNSRecent Tanesco Announcement
22nd Oct 20187:00 amRNSSubmission of RFQ Documentation to Tanesco
9th Oct 20187:00 amRNSCoal supply contract
8th Oct 20187:00 amRNSFurther Coal Supply Contract
24th Sep 20187:00 amRNSInterim Results for the six months to 30 June 2018
22nd Aug 20187:00 amRNSCoal supply contract
14th Aug 201811:00 amRNSPrice Monitoring Extension
14th Aug 20187:00 amRNSCommercial Coal Production Update
18th Jul 20187:00 amRNSBroker Update
28th Jun 20183:55 pmRNSResult of AGM
25th Jun 20181:50 pmRNSExtension of MOU with Sinohydro
22nd Jun 20188:45 amRNSPowerline Financing
12th Jun 20187:00 amRNSInterview with CEO
5th Jun 20189:05 amRNSNotice of AGM
5th Jun 20187:00 amRNSAnnual Results for the year ended 31 December 2017

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.