If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCentral Rand Gold Regulatory News (CRND)

  • There is currently no data for CRND

Interim Management Statement

19 May 2010 17:12

RNS Number : 2310M
Central Rand Gold Limited
19 May 2010
Β 

ο»Ώ

For immediate release 19 May 2010

Β 

Central Rand Gold Limited

("CRG" or the "Company" or the "Group")

(Incorporated as a company with limited liability under the laws of Guernsey,

Company Number 45108)

(Incorporated as an external company with limited liability under the laws of

South Africa, registration number 2007/0192231/10)

ISIN: GG00B24HM601

Share code on LSE: CRND

Share code on JSE: CRD

Β 

Interim Management Statement

Β 

Β 

Highlights

Β 

Β 

Β·; Metallurgical plant upgrade and optimisation completed

Β 

Β·; Β Decline development952m from portal

Β·; Second decline two months ahead

Β·; Additional surface exploration target identified.

Β·; US$11.2 million cash balance at the end of March 2010

Β·; Progress towards further equity fund raising on track

Β 

Operational Update

Β 

Mining

Β 

Decline development within the high grade eastern payshoot is now 155m below surface and advanced an estimated 952m. The second decline development targeting the high grade western payshoot has started two months ahead of schedule and has already advanced 85m and is 153mbs. A total of 271m of reef development has been completed to date.

Β 

Both mining and processing personnel have now converted to a continuous 12-hour shift roster. This change in shift hours is expected to significantly improve efficiencies and reduce costs compared to the previous 8-hour shift cycle

Β 

Metallurgy

Β 

A number of initiatives were implemented on the Metallurgical plant to improve recovery and production. This was undertaken mainly during March 2010 when the plant was shut down while the necessary changes were made.

Β 

The steady feed into the Bateman concentrator was resolved by implementing a live stockpile with withdrawal tunnel underneath to enable a controlled vibrating feeder to consistently feed the optimal tonnage into the crushing circuit and eliminate the lumpy feed issues to date. This has improved throughput in the Bateman plant.

Β 

The CIL plant has been successfully converted into an increased capacity CIP plant by the addition of a 150 cubic metres pre-leach tank with a shear reactor to increase effective retention time and improve dissolved oxygen levels that are critical to the leach process. Improved direct feed arrangements into the CIP plant have also enabled a step increase in throughput through the circuit and already a steady state 13Β 500 tpm has been achieved at current mining rates.

Β 

We are currently processing the oxide material from open pits through the plant while the underground development opens up new stoping areas for sulphide ore scheduled for the latter part of 2010.

Β 

From a production perspective the Bateman concentrator is achieving an excellent recovery on the oxide material, however, throughput and availability is still being optimised.

Β 

The CIP has been performing very well to forecast and is achieving both expected recovery and throughput on the oxide material. Availability has since start up in March exceeded forecast.

Β 

During processing of underground sulphide material we achieved consistent tail grades of around 0.2g/t on both the flotation plant and leach circuit which are confirming the expected recoveries once steady state sulphide production is underway later this year.

Β 

The gold produced for year to date is 2Β 312 oz to 10 May 2010. This includes both bullion smelted on site and loaded carbon sent to Rand Refinery for processing.

Β 

Exploration

Β 

The Company has put in place several strategies to leverage off the current high gold price and provide additional ore material to ensure that the process plant continues to operate to capacity during the ramp up to underground stope production.

Β 

Current Expansion of Open Pit Operations

Β 

The company has recently secured permission to extend open pit operations, approximately one kilometre from the process plant. Three open pits are envisaged for this area providing approximately four months of production. The highly weathered nature of the Main Reef, Middling and Main Reef Leader material targeted by the company allows for extraction through free mechanical digging to depths of around 20m. The pits will be rehabilitated concurrently with mining.

An estimated "Exploration Target" of between 30 000t and 40 000t at a grade of between 2.8 g/t and 3.2 g/t has been identified to depths not exceeding 20m.

Β 

The new open pit operations in the New Unified Area are close to the existing Process Plant at CMR.

Β 

Optimisation Studies underway for New Pits

Β 

Systematic mechanical trenching and geological mapping and sampling has identified significant open pit "Exploration Target" potential in the "White Reef, approximately two kilometres from the processing plant. Current work has suggested that unlike the free digging Main Reef material in the immediate vicinity of the plant, limited drilling and blasting may be required. The White Reef is particularly well suited to open pit operations in that up to four gold bearing units are present in widths of up to 2.5m.

Β 

Trench results are tabulated below:

Trench Id

Top Band

Mid Top Band

Mid Basal Band

Basal Band

TR1

0.67g/t/70cm

0.34g/t/30cm

3.86g/t/90cm

0.08g/t/74cm

TR2

2.74g/t/52cm

0.45g/t/82cm

TR3

Cavity

TR4

1.16g/t/145cm

10.08g/t/47cm

TR4a

3.10g/t/200cm

3.45g/t/54cm

TR5

2.40g/t/195cm

0.88g/t/36cm

TR5a

2.59g/t/148cm

TR6a

2.54g/t/260cm

TR6b

4.1g/t/160cm

TR6c

10.04g/t/98cm

0.08g/t/55cm

TR6d

3.67g/t/130cm

0.49g/t/100cm

TR6f

0.37g/t/40cm

2.72g/t/280cm

TR6g

Dyke

TR6h

2.09g/t/191cm

3.82g/t/65cm

TR6i

3.20g/t/200cm

2.46g/t/100cm

TR7

4.05g/t/102cm

3.72g/t/133cm

TR8

1.73g/t/84cm

4.43g/t/54cm

TR8a

1.18g/t/80cm

3.93g/t/50cm

2.26g/t/77cm

0.22g/t/90cm

TR9

1.37g/t/66cm

0.89g/t/123cm

TR10

2.26g/t/83cm

1.79g/t/45cm

0.61g/t/35cm

0.21g/t/20cm

TR10a

2.33g/t/132cm

1.26g/t/40cm

TR10b

1.10g/t/120cm

1.28g/t/120cm

TR11

1.44g/t/30cm

4.12g/t/30cm

0.79g/t/30cm

0.19g/t/40cm

TR12

0.63g/t/92cm

2.16g/t/40cm

0.61g/t/171cm

TR13

Dyke

TR14

0.39g/t/79cm

1.44g/t/35cm

0.23g/t/37cm

0.35g/t/40cm

Β 

An estimated "Exploration Target" of between 190,000t and 210,000t at an approximate grade of around 2.1 g/t has been discovered to date.

Β 

Footnote:

The potential quantity and grade described by the term "Exploration Target" is conceptual in nature and there has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the definition of a Resource. Further exploration work is ongoing, and includes trial mining and processing of this shallow target to establish grade and ore body continuity, mineability, dilution and throughput characteristics.

Β 

Cash Position

Β 

As at the end of March 2010, the Company had approximately US$11.2 million on hand. Set out below is an abridged cash flow statement.

Β 

Β 

Cash Reconciliation

Value US$ (million)

Balance as at 31 December 2009

15.9

Cash Box proceeds, 22 January 2010

5.8

Capital Expenditure

-0.8

Operational and Administrative Expenditure

-11.5

Forex

-0.4

Other Income

0.8

Gold Sales

1.4

Balance as at end March 2010

11.2

Β 

Capital Raising

Β 

As indicated in the Chairman's Report of Annual Report 2009 , it is envisaged that additional equity finance of at least US$35 million will be sought to fund the Company's mine development plan and provide the platform for sustainable gold production going forward.

Β 

Black Economic Empowerment

Β 

At the hearing of the interdict applications on 5 November 2009, the Court dismissed Puno's request for an urgent interdict to halt CRG's trial mining activities and made a costs order against Puno to pay the costs incurred by the CRG Group in opposing the application. Puno subsequently appealed and on 1 April 2010, the Court rejected Puno application for leave to appeal the decision handed down by the South Gauteng High Court. The arbitration procedures are continuing with Puno Gold Investments (Pty) Ltd. It is expected that the arbitration proceedings will be completed within 2010.

Β 

Β 

For further information, please contact:

Β 

Johan du Toit +27 (0) 11 551 4000

Patrick Malaza +27 (0) 11 551 4000

Β 

Enquiries:

Β 

Evolution Securities Limited +44 (0) 20 7071 4300

Simon Edwards / Chris Sim / Neil Elliot

Β 

Macquarie First South Advisers (Pty) Ltd +27 (0) 11 583 7000

Annerie Britz / Melanie de Nysschen

Β 

Buchanan Communications Limited +44 (0) 20 7466 5000

Bobby Morse / Katharine Sutton / James Strong

Β 

Jenni Newman Public Relations (Pty) Ltd +27 (0) 11 772 1033

Jenni Newman / Megann Outram

Β 

This information is provided by RNS
The company news service from the London Stock Exchange
Β 
END
Β 
Β 
IMSGGUGGAUPUGQB
Date   Source Headline
15th Sep 20157:00 amRNS2015 Interim Report
11th Sep 20158:00 amRNSChange of Transfer Secretary
7th Sep 201512:00 pmRNSMemorandum of Understanding Update
7th Aug 20151:14 pmRNSResult of AGM
21st Jul 20157:00 amRNSChange of Adviser
16th Jul 20157:00 amRNSMerorandum of Understanding Update
3rd Jul 20154:40 pmRNSSecond Price Monitoring Extn
3rd Jul 20154:35 pmRNSPrice Monitoring Extension
1st Jul 20157:01 amRNSAnnual Financial Report
1st Jul 20157:00 amRNSFinal Results
30th Jun 20151:10 pmRNSTotal Voting Rights
19th Jun 20158:00 amRNSSubscription
17th Jun 20153:30 pmRNSResult of EGM
15th Jun 20158:00 amRNSMemorandum of Understanding Update
20th May 20158:00 amRNSPlacing and Subscription
31st Mar 20157:00 amRNSOperational Update
6th Mar 20157:00 amRNSHolding(s) in Company
12th Feb 20157:00 amRNSmemorandum of Understanding
9th Feb 20158:00 amRNSInvestor & Marketing Presentations
14th Jan 20151:15 pmRNSHolding(s) in Company
17th Dec 20148:00 amRNSPlacing and Subscription
2nd Dec 201411:30 amRNSMemorandum of Understanding
21st Nov 201411:53 amRNSMemorandum of Understanding
19th Nov 20141:00 pmRNSHolding(s) in Company
11th Nov 20147:00 amRNSMemorandum of Understanding and Operational Update
1st Sep 201411:34 amRNSEnter into strategic partnership
15th Aug 20147:00 amRNS2014 Interim Report
1st Jul 20141:00 pmRNSResult of AGM
1st Jul 20147:00 amRNSResource update
26th Jun 20147:00 amRNSAcid Mine Drainage
20th Jun 20149:00 amRNSINVESTOR AND MARKETING PRESENTATIONS
6th Jun 20147:00 amRNSDirectorate Change
30th May 20143:15 pmRNSAudited Annual Report
30th May 20143:15 pmRNSRestoration - Central Rand Gold Limited
30th May 20143:15 pmRNSAnnual Report Release
30th May 20149:00 amRNSStatement re: Suspension
30th May 20148:13 amRNSSuspension - Central Rand Gold Limited
28th May 20147:00 amRNSStatus of Plant Upgrade
28th May 20147:00 amRNSAcid Mine Drainage
16th May 20141:30 pmRNSPreliminary Results
16th May 20141:30 pmRNSDirectorate changes
2nd May 20148:00 amRNSAnnual Results release date
1st Apr 20147:00 amRNSResignation of a director
28th Feb 20144:40 pmRNSSecond Price Monitoring Extn
28th Feb 20144:35 pmRNSPrice Monitoring Extension
31st Jan 20143:30 pmRNSTotal Voting Rights
22nd Jan 20143:15 pmRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
16th Jan 20148:30 amRNSResults of Open Offer
8th Jan 201412:00 pmRNSRESULTS OF EXTRAORDINARY GENERAL MEETING
6th Dec 20137:00 amRNSPlacing, Subscription and Open Offer

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.