Watch the latest episode of focusIR Fireside Chats: Why Edinburgh Investment Trust Is Backing Turnaround Stocks for 2026 Growth. Viewhere

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCRC.L Regulatory News (CRC)

  • There is currently no data for CRC

Mining Title Licence Review

6 Feb 2009 10:50

RNS Number : 9225M
Copper Resources Corporation
06 February 2009
 



For immediate release February 2009

Stock Exchange Announcement

 COPPER RESOURCES CORPORATION

Mining Title Licence Review

Copper Resources Corporation ("CRC" or the "Company") has concluded negotiations with the authorities in the Democratic Republic of Congo ("DRC") with respect to their title review process, specifically with respect to Miniere de Musoshi et Kinsenda ("MMK"). The agreement between Societe de Developpement Industriel et Miniere du Congo ("Sodimico"), CRC and Metorex, as approved by the DRC Government confirms the following:

The revised shareholding of 23% non-dilutable for Sodimico (up from 20%) and 72.15% for CRC (down from 75%);

Pas de porte payments to the amount of US$3 million over several instalments to 2011; and

Royalties at 2.5% on gross revenue. 

The commercial aspects relating to the MMK revisitation process are as follows:

Commercial Aspect

Original Agreement

Revised Agreement

Shareholding

Metorex/CRC held a combined 80% interest in MMK and Sodimico held a 20% interest in MMK.

Metorex/CRC hold a combined 77% interest in MMK, the balance of 23% held by Sodimico.

Mineral Content Fee

Nil

US$3million mineral content fee of US$million is payable as follows: US$500,000 payable on signature. A Further US$500,000 one month later and a further US$500,000 one month thereafter. In addition, a payment of US$500,000 to be made on 31 December 2009, 2010 and 2011.

Royalty

A royalty of 2.5% on gross revenue.

A royalty of 2.5% payable by MMK to Sodimico on gross revenue.

In addition to the above commercial aspects, it was agreed that the Musoshi Mine surface and underground infrastructure be returned to Sodimico together with certain equipment that had been transferred to Kinsenda Mine that was not in use at Kinsenda Mine. Compensation would be paid on a fair value basis for any equipment removed from Musoshi Mine to Kinsenda Mine that had been applied to the Kinsenda mining operations.

The power supply to Musoshi and Kinsenda is channelled through the Kasumbalesa Substation, which substation will require upgrading on the development of the Kinsenda Mine for which MMK has undertaken to finance the upgrade and recover the cost thereof from Sodimico on a basis to be agreed. This upgrade will only occur once the full scale development of the Kinsenda mine commences.

As announced on 6 February 2008, the Company has significantly scaled back the development of the Kinsenda mine on a temporary basis.

The Company is focused primarily on establishing a financing package for the development of the Kinsenda Mining Project, which has a measured resource at grade of approximately 5% Copper. The life of mine is approximately 15 years at a milling rate of approximately 80,000 tons per month. 

In addition, approximately 13,000 metres of exploration drilling has taken place on the Lubembe deposit during 2008. The results are being evaluated and will be taken to a scoping study and/or pre-feasibility study during the forthcoming period of 12 months, subject to arranging appropriate financing.

The Kinsenda Mine has been dewatered to approximately Level 290 which is below the initially planned production levels. Dewatering and general care and maintenance will continue pending securing adequate financing for the development of the project. The metallurgical plant design has been completed by MDM and certain site establishment and civil work has been completed. Once the financing of up to US$200 million has been established, the project will be accelerated and could commence production of copper concentrate within a period of 18 months thereafter.

Charles Needham said: "The Kinsenda Mine has a world class ore resource and has existing infrastructure being roads, power and water supply and underground development which is poised to commence production once suitable financing has been secured.

The outcome of the Revisitation process is considered to be equitable to both our company and Sodimico."

 

Enquiries:

Copper Resources Corporation

Ambrian Partners Limited

GTH

Communications

Robert Fischer

Non-executive Director

Richard Brown

Harry Stockdale

Toby Hall

+ 32

475 242 825

+44 (0)

20 7 634 4700

+44 (0)

20 7153 8035

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
STRDGGGZGVRGLZM
Date   Source Headline
6th Dec 20079:17 amPRNOffer for Copper Resources Corporation
5th Dec 20072:32 pmPRNResult of AGM
5th Dec 20072:08 pmPRNEXERCISE OF OPTIONS
30th Nov 20073:47 pmPRNEXERCISE OF OPTIONS AND WARRANTS
28th Nov 20074:19 pmPRNADJOURNED ANNUAL GENERAL MEETING
28th Nov 200712:31 pmPRNDirectorship Appointment
28th Nov 200712:12 pmPRNStatement re CRC MINORITIES OFFER DOCUMENT
26th Nov 200710:16 amPRNCORRECTION REGARDING TOTAL NUMBER OF SHARES IN ISSUE
21st Nov 20071:27 pmPRNExercise of Options
20th Nov 200711:32 amPRNUpdate
19th Nov 20077:00 amPRNDirectorate Change
16th Nov 20071:43 pmPRNPRIVATE PLACING - CLARIFICATION
15th Nov 20077:00 amPRNPrivate Placement
6th Nov 20079:06 amPRNPROPOSED MANDATORY OFFER BY METOREX LIMITED
5th Nov 20077:46 amPRNUpdate on DRC Licences
31st Oct 20072:01 pmPRNNotice of AGM
24th Oct 20075:26 pmRNSIssue of Equity
4th Oct 20073:05 pmPRNPosting of Interim Accounts
1st Oct 20077:00 amPRNInterim Results
18th Sep 200711:56 amPRNCOPPER RESOURCES CORPORATION ACQUISITION
21st Aug 20079:03 amPRNCorrection : AIM Rule 26
20th Aug 20077:58 amPRNAIM Rule 26
17th Aug 20077:00 amPRNExercise of Warrants
15th Aug 20078:06 amPRNChange in Shareholdings
26th Jul 20073:49 pmPRNExercise of Options
13th Jul 20079:02 amPRNExericise of Options
10th Jul 20071:37 pmPRNExercise of Warrants
9th Jul 200712:00 pmPRNEXERCISE OF OPTIONS AND CANCELLATION OF OPTIONS
29th Jun 20077:00 amPRNFinal Results
28th Jun 20077:00 amPRNChange in Shareholding
15th Jun 20077:00 amPRNUpdate on Kinsenda and Hinoba-an Projects
5th Jun 20077:00 amPRNDirector Resignation
2nd May 20077:00 amPRNChange of Advisor
28th Mar 20075:26 pmPRNDirectorate Change
19th Mar 20078:20 amPRNChange in Shareholding
15th Mar 20079:49 amPRNExercise of Options
26th Feb 20077:00 amPRN$15million Private Placement
23rd Feb 20072:00 pmPRNHolding(s) in Company
25th Oct 200610:31 amPRNIssue of Options
3rd Oct 20064:09 pmPRNDirector/PDMR Shareholding
7th Sep 20067:00 amPRNHaib Copper Project Update
5th Sep 20067:00 amPRNGOLD MINERALISATION DISCOVERED AT HINOBA-AN
21st Jul 20067:00 amPRNFINANCING APPROVED FOR KINSENDA PROJECT IN DRC
18th Jul 20067:00 amPRNCompletion of Infill Drilling Programme at Hinoba-an
3rd Jul 20067:00 amPRNKinsenda Copper Project
30th Jun 20066:06 pmRNSAnnual Report and Accounts
19th Jun 200610:27 amPRNAppointment of RMB Resources
10th May 20069:44 amPRNHolding(s) in Company
27th Apr 20069:45 amPRNHolding(s) in Company
11th Apr 200611:14 amPRNExercise of options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.