Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCNG.L Regulatory News (CNG)

  • There is currently no data for CNG

Pakrut Update

22 Dec 2008 10:30

22 December 2008 Kryso Resources plc (`Kryso', `Kryso Resources' or `the Company') AIM: KYS Pakrut Gold Project - Reserves & Resources Approved by Tajik Government * Pakrut reserves and resources approved by Tajik State Committee for Reserves * Total reserves and resources at Pakrut under Russian classification system increased to 2,055,047oz of gold * Recent drilling confirms Pakrut deposit still open at depth * Kryso has received several proposals for the financing and development of Pakrut

Kryso Resources plc, the mineral exploration and development company with gold and nickel-copper projects in Tajikistan, is pleased to announce that the State Committee for Reserves (GKZ) of the Republic of Tajikistan approved the reserves and resources of the Company's 100% controlled Pakrut gold deposit on 15 December 2008.

The Pakrut reserves and resources have been approved on the basis of cut-off grades of 0.5 grams per tonne gold (g/t), 1.0g/t, and 1.5g/t.

Using a 0.5g/t cut-off grade, the approved C1+C2+P1 gold resource is 2,055,047oz at an average grade of 2.44g/t, which includes an approved C1+C2 reserve of 1,257,454oz at an average grade of 2.62g/t.

If a 1.5g/t cut-off is used, the approved C1+C2+P1 resource is 1,664,212.7oz at an average grade of 3.98g/t, while the approved C1+C2 reserve is 1,036,479oz at an average grade of 3.99g/t.

Tajikistan uses the Russian classification system for reserves and resources which differs from the JORC Code. The Russian C1, C2 and P1 categories can respectively be considered broadly similar to the JORC proved or probable reserve, indicated resource and inferred resource categories.

A full schedule of the Pakrut reserves and resources under the Russian classification system is provided below.

Earlier this year the Tajik State Committee for Geology approved the resources of the Pakrut gold deposit. Kryso has since completed a local feasibility study for Pakrut, which was required for the approval of the C1 and C2 reserves by the State Committee for Reserves. The local feasibility study included a mining plan, proposed mining method, plant design, and both capital and operating costs for the project. This study was prepared by independent consultants in conjunction with Kryso's own specialist personnel.

The total JORC compliant resource for Pakrut is currently 1,739,029oz at an average grade of 2.53 g/t, using a 0.5 g/t cut-off. Some 1,167,789oz of this total is in the measured and indicated categories. This estimate was calculated by Geologix, Kryso's independent geological consultants, in September 2008. The JORC compliant resource at Pakrut is expected to increase based on recent drilling results.

Recent drilling at Pakrut, assays for which will be reported over the coming months, confirms that the deposit remains open at depth, and future drilling is very likely to result in the definition of additional reserves and resources.

Much of the necessary work has been completed to finalise the bankable feasibility study for Pakrut, and the Company expects the study to be completed during 2009.

Several proposals for the financing of the Pakrut project have been presented to the Company. These are currently being considered and the Company expects to make further announcements in due course.

Vassilios Carellas, Managing Director of Kryso Resources, comments:

`We are very pleased to have our reserves and resources approved by the State Committee for Reserves. This is an important step in the overall process of bringing the Pakrut gold project into production.

That the Russian classified reserves and resources for Pakrut now exceed 2 million ounces is indicative of the increase we expect to achieve in our next JORC compliant resource update.

It is also pleasing to have received a number of approaches relating to thePakrut project, and we will advise the market of any developments on thisfront.' PAKRUT GOLD PROJECT RESERVES AND RESOURCES At a 0.5 gram cut-off Category Tons Grade (g/t) Ounces C1 8,392,540.6 3.00 810,687.5 C2 6,518,207.2 2.13 446,766.8 Total Reserves 14,910,747.8 2.62 1,257,454.3 P1 11,300,747.5 2.20 797,592.5 Total Resource 26,211,495.3 2.44 2,055,046.8 At a 1.0 gram cut-off Category Tons Grade (g/t) Ounces C1 6,637,473.1 3.59 765,313.2 C2 4,071,465.6 2.71 354,513.4 Total Reserves 10,708,938.7 3.25 1,119,826.6 P1 6,870,142.0 3.03 669,976.5 Total Resource 17,579,080.7 3.17 1,789,803.1 At a 1.5 gram cut-off Category Tons Grade (g/t) Ounces C1 5,028,935.1 4.41 713,663.0 C2 3,046,377.5 3.30 322,816.0 Total Reserves 8,075,312.6 3.99 1,036,479.0 P1 4,934,580.6 3.96 627,733.7 Total Resource 13,009,893.2 3.98 1,664,212.7

For further information, please contact:

Vassilios Carellas / Dr. Trevor Davenport, Kryso Resources plc.

Tel: 020 7371 0600Brett Miller, Ruegg & Co Ltd.Tel: 020 7584 3663

Richard Hail, Fox-Davies Capital Limited.

Tel: 020 7936 5200

Christian Dennis, Orbis Equity Partners Limited.

Tel: 020 3178 3977

Background Information on Kryso Resources plc

Kryso Resources controls 100% of the exploration rights to the Pakrut gold project, which lies within the highly prospective Tien-Shan gold belt. Kryso also controls 100% of the exploration rights to the Hukas nickel-copper project.

Kryso is managed by a team with a proven track record of working in Tajikistan, which the Company considers to be among the most attractive operating environments in Central Asia.

The main deposit at Pakrut currently hosts a JORC compliant resource in excess of 1.7 million oz of gold and the Company aims to increase this significantly over time.

Drilling at Pakrut continues to return exciting intersections, including 123.7m @ 6.14g/t gold, 42m @ 11.17g/t gold and 50m @ 5.67g/t gold.

The Company envisages gold production at Pakrut of 100,000 oz per annum from a combined open pit and underground mine, commencing in 2010.

A geophysical survey over a large section of the Hukas nickel-copper project has been completed, and a drill programme began in 2008.

All assay results reported are independently assayed by SGS Lakefield in South Africa. The procedures used in sampling, logging core, and sample preparation were audited by Snowden Mining Consultants in 2006. A quality control system is in place whereby control samples are included with samples sent to SGS Lakefield.

Mr Vassilios Carellas (MAusIMM) is a full time employee of Kryso Resources plc and provided geological interpretations and the drillhole and trench database for Mineral Resource estimation. Mr Carellas has sufficient experience relevant to the style of mineralization and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the `Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Carellas consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.

Glossary of terms

Grade g/t - grams per tonne

JORC Code - Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.

Russian resource classification system - a system used in Russia and most Former Soviet Union countries for calculating ore reserves and resources.

C1 - Russian resource classification system reserve category which is broadly similar to proved or probable reserve category under the JORC Code.

C2 - Russian resource classification system reserve category which is broadly similar to indicated resource under JORC Code.

P1 - Russian resource classification system resource category which is broadly similar to inferred resource under the JORC Code.

vendor
Date   Source Headline
23rd Feb 201010:54 amPRNHolding(s) in Company
15th Feb 20103:22 pmPRNIssue of Equity
18th Jan 20102:22 pmPRNExercise of Warrants
11th Jan 201011:41 amPRNBroker Update
8th Jan 20108:03 amPRNHolding(s) in Company
5th Jan 201012:36 pmPRNIssue of Equity
11th Dec 20094:03 pmPRNExercise of Warrants
11th Dec 20094:00 pmPRNHolding(s) in Company
10th Dec 20094:13 pmPRNExercise of Options and Warrants
9th Dec 20091:13 pmPRNBFS Update
8th Dec 20097:00 amPRNDirectorate Change
4th Dec 20097:44 amPRNDirector/PDMR Shareholding
4th Dec 20097:41 amPRNExercise of Options and Warrants
3rd Dec 20093:55 pmPRNHolding(s) in Company
26th Nov 20097:00 amPRNChange of Adviser
17th Nov 20097:00 amPRNPakrut Update
19th Oct 20097:00 amPRNAppointment of Technical Consultant
12th Oct 20093:00 pmPRNDirectors Dealing
5th Oct 20099:38 amPRNIssue of Equity
30th Sep 20092:35 pmPRNHalf-yearly Report
30th Sep 200911:25 amPRNTotal Voting Rights
28th Sep 20097:00 amPRNDrilling Report
25th Sep 20093:32 pmPRNHolding(s) in Company
14th Sep 20097:00 amPRNIssue of Equity
28th Aug 20099:37 amPRNTotal Voting Rights
19th Aug 20093:31 pmPRNIssue of Equity
17th Aug 20091:30 pmPRNChange of Nominated Adviser
11th Aug 20097:00 amPRNPakrut Update
31st Jul 200911:23 amPRNTotal Voting Rights
8th Jul 20097:00 amPRNIssue of Equity
3rd Jul 200912:20 pmPRNResult of AGM
1st Jul 200910:07 amPRNPakrut Update
30th Jun 20098:00 amPRNTotal Voting Rights
10th Jun 200911:27 amPRNFinal Results and Notice of AGM
8th Jun 20092:08 pmPRNIssue of Equity
3rd Jun 20097:00 amPRNPakrut Project Update
29th May 200910:58 amPRNTotal Voting Rights
28th May 20097:00 amPRNUpdate and Directorate Change
15th May 200912:03 pmPRNFurther re Proposed Placing
13th May 200912:36 pmPRNResult of EGM
21st Apr 20092:22 pmPRNNotice of EGM
11th Mar 20097:00 amPRNProposed Financing Update
16th Feb 20097:00 amPRNProposed Financing
12th Feb 200910:36 amPRNStatement re Share Price Movement
22nd Dec 200810:30 amPRNPakrut Update
10th Sep 20087:00 amPRNGrant of Options
9th Sep 20087:00 amPRNResource Statement Increase - Pakrut
29th Aug 20089:13 amPRNTotal Voting Rights
8th Aug 20089:11 amPRNHolding(s) in Company
31st Jul 20084:30 pmPRNIssue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.