Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBerkeley Mineral Resources Regulatory News (BMR)

  • There is currently no data for BMR

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kabwe Update

14 Dec 2011 07:00

RNS Number : 9168T
Berkeley Mineral Resources PLC
14 December 2011
 



BERKELEY MINERAL RESOURCES PLC

("BMR" or the "Company")

 

Update on the Options to acquire remaining assets at Kabwe

 

Following the announcement made on 14 July 2011, BMR can now report that, after the exercise of options, the due diligence in connection with the acquisition of Silverlining Ventures Limited ("Silverlining") and Alberg Mining Ltd ("Alberg") is now complete.

Silverlining owns stands 5203, 5209 and the remainder of stand 5203 in the Industrial Township of Kabwe. These stands are located opposite BMR's stockpiles site (stand 5187) and contain an historic crushing, screening and flotation plant, including refurbished thickener dams, new flotation cells, a power sub-station, water supply, railway sidings and an extensive furnished and IT-connected office block. This infrastructure is capable of being overhauled to provide the site beneficiation plant necessary to process the Kabwe stockpiles. The precise process is currently being evaluated by Metanza.

Alberg owns the mining rights to 703 hectares at Kabwe which contain all the residual partly mined or un-mined underground ore bodies remaining at the former Kabwe mine, together with existing shafts and other infrastructure.

Previously the Company has announced that the Zambian state mining company, Zambia Consolidated Copper Mines Ltd ("ZCCM") estimated the Alberg underground ores to be in excess of 22 million tonnes ("Mt"). However, detailed examination of the ZCCM Closure Resource Statement has concluded that the total remaining inferred Alberg underground resource stands at 23.4Mt at an average grade of 5.20% Lead (Pb)/Zinc (Zn). Included in the total is an inferred sulphide ore resource of 1.0Mt at 15.74% Zn and 2.45% Pb outlined around the historic No. 1, 3/4 and 5/6 ore bodies and an inferred ore resource of 0.91Mt at 15.27% Zn and 1.53% Pb at the No. 2 ore body.

A detailed table of these resources is documented on the BMR website at: http://www.bmrplc.com/projects/resources.

 

The transfer of the relevant mining licences to BMR's wholly owned Zambian subsidiary, Enviro Processing Ltd, has been delayed following the change of government in the recent national Zambian elections but is expected shortly.

 

Importance of by-products in existing ore bodies

 

As part of its due diligence on the 703 hectares at Kabwe which contain all the residual partly mined or un-mined underground ore bodies rights optioned from Alberg Mining Ltd ("Alberg"), BMR has commissioned an Independent Report from Dr Arthur J Warden PhD, C Eng, FGS, FIMMM, Honorary Lecturer at the University of Dundee.

 

Dr Warden's report confirms that historic production at the Kabwe mine during operations between 1904 and 1994 records an output of 1.8 Mt of zinc and 0.8 Mt of lead. However, as by-products, the mine historically also produced 7,820 tonnes of vanadium, 235 tonnes of cadmium, 79 tonnes of silver and 64 tonnes of copper.

 

In addition to the major deposits of zinc and lead, Dr Warden's report concludes that "once access to the underground resources is obtained then the minor metals may prove to be a significant bonus to any new production. Historic values for Silver are quoted as 1.5oz (ca 45-50 g/t) and other minor metals such as Vanadium, Cadmium, Germanium, Rare Earths, Copper, Gallium and Indium are all known to exist and may be now economic to recover".

 

All historic underground estimates are not JORC compliant and have not been verified at this time and therefore cannot be relied upon for economic assessment purposes.

 

Corporate Relations

 

As part of its Corporate Relations activity, BMR part-sponsored the Country Factor Zambian Investment Forum at London's Mayfair Hotel on 9 December. At this Forum, the newly appointed Minister of Mines and Natural Resources, Wilbur Simusa, outlined the prime importance of mining to the Zambian economy and the country's plans to substantially encourage investment in the sector.

 

Masoud Alikhani, Chairman, commented:

 

"The final exercise of the options will give BMR the potential to consolidate a substantial part of the Kabwe site, including the section where we intend to site our beneficiation plant. The acquisition of the underground ore bodies, together with the large scale licence to exploit them, will further strengthen our position and gives us the prospect of additional profitability through the processing of the minor metals content".

 

14 December 2011

 

This release has been reviewed by Dennis Human, B.Sc. (Hons), Bus. Admin (Hons), Consulting Geologist in accordance with the guidance note for Mining, Oil & Gas Companies issued by the London Stock Exchange in respect of AIM Companies.

 

For further information please contact:

 

Berkeley Mineral Resources Plc

Masoud Alikhani, Chairman

020 7408 1181

 

Seymour Pierce

Stewart Dickson / Jonathan Wright (Corporate Finance)

Jeremy Stephenson / Richard Redmayne (Corporate Broking)

020 7107 8000

 

Lothbury Financial Services

Michael Padley / Gary Middleton

020 7868 2010

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCDKNDPFBDDOBD
Date   Source Headline
26th Nov 20099:07 amRNSFinal Results
10th Nov 20097:00 amRNSPlacing
14th Oct 20097:00 amRNSDirector Shareholding
13th Oct 20097:00 amRNSFurther grant of mining rights
6th Oct 20099:00 amRNSDirector Shareholding
1st Oct 20097:00 amRNSKabwe Dumps Acquisition Update
31st Mar 20092:00 pmRNSInterim Results
30th Jan 200912:14 pmRNSAGM Statement
30th Dec 200812:00 pmRNSFinal Results
16th Dec 20087:00 amRNSPositive Assay Results
24th Jul 20081:36 pmRNSTotal Voting Rights
8th Jul 20087:00 amRNSZambian Mining & Processing R
27th Jun 20085:00 pmRNSStatement re: Share Price Mov
28th Mar 20087:01 amRNSInterim Results
6th Mar 200812:53 pmRNSChange of Name
13th Feb 20082:24 pmRNSGeneral Meeting
21st Dec 20073:22 pmRNSFinal Results
20th Nov 20072:04 pmRNSDirector/PDMR Shareholding
19th Nov 200710:22 amRNSHolding(s) in Company
9th Nov 20073:00 pmRNSHolding(s) in Company
9th Nov 20077:01 amRNSNew Activity / Funds raised
26th Oct 200710:35 amRNSHolding(s) in Company
5th Sep 20071:55 pmRNSHolding(s) in Company
20th Aug 20077:01 amRNSAIM Rule 26
30th Jul 200711:25 amRNSCompany Update
4th May 20071:57 pmRNSBoard Change
29th Mar 20071:14 pmRNSInterim Results
27th Mar 20071:50 pmRNSVoice Quality Software Stack
29th Dec 200611:25 amRNSPreliminary Results
22nd Dec 20069:59 amRNSTotal Voting Rights
24th Nov 20067:00 amRNSProduct Launch
23rd Nov 20067:00 amRNSConference Attendance
11th Sep 20067:01 amRNSVoice Quality Software
5th Jul 20068:00 amRNSICB Reclassification
31st Mar 20064:09 pmRNSInterim Results
6th Mar 200612:40 pmRNSSale of shareholding
21st Feb 20067:00 amRNSRe: Licensing Agreement
27th Jan 200611:12 amRNSAGM Statement
27th Jan 200611:09 amRNSRe: Placement of shares
23rd Dec 200512:03 pmRNSAnnual Report and Accounts
22nd Dec 200512:00 pmRNSFinal Results
29th Nov 20057:00 amRNSRe Joint Venture
3rd Oct 20057:00 amRNSContract Update
3rd Oct 20057:00 amRNSRe Contract
25th Jul 20054:02 pmRNSHolding(s) in Company
11th Jul 20057:00 amRNSIssue of Equity
27th Jun 20057:00 amRNSNew Contract Awarded
16th Jun 20057:00 amRNSC3 Product Delivery completed
10th Jun 200512:30 pmRNSGrant of Share Options
31st May 20059:00 amRNSTechnology Supply Agreement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.