If you would like to learn more about future focusIR related events and roundtables, please submit your details here

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksBLVN.L Regulatory News (BLVN)

  • There is currently no data for BLVN

IM-5 preliminary testing update

2 Apr 2013 07:00

RNS Number : 2306B
BowLeven Plc
02 April 2013
 



 

 

2 April 2013

 

Bowleven plc ('Bowleven' or 'the Company')

 

IM-5 preliminary testing update

 

IM-5 well, Block MLHP-7, Etinde Permit, Cameroon

 

Bowleven, the Africa focused oil and gas exploration group traded on AIM, is pleased to announce the preliminary results of the first test at the IM-5 appraisal/development well drilling offshore Cameroon. A Drill Stem Test (DST) was performed on the Middle Isongo interval and preparations are now underway to test the Intra Isongo interval.

 

Highlights - Middle Isongo DST

 

·; Condensate-rich gas flowed on test confirming significant liquids content of gas.

·; Maximum flow rate of 23 mmscfd and 3,155 bcpd (total over 7,000 boepd) delivered on test demonstrating productivity at commercial rates from Middle Isongo.

·; High quality condensate (43 degree API) produced on test.

 

Testing update

The well, designed to appraise the reservoir and fluid properties of the Middle Isongo and to explore the additional potential of the Intra Isongo, was drilled to a TD of 3,430 metres MD in water depths of around 56 metres.

 

As previously announced, the well encountered approximately 25 metres of log evaluated net hydrocarbon-bearing pay in the Middle Isongo over a gross interval of approximately 33 metres.

 

The well has now successfully flow tested condensate-rich gas from a single 21 metre gross interval (14 metres net pay) perforated above the log-evaluated HWC encountered in the Middle Isongo. The interval flowed at a maximum rate of 23 mmscfd and 3,155 bcpd (total over 7,000 boepd) inferring a CGR of 136 bbls/mmscf. Further liquids (including LPGs) can be recovered via secondary processing. Further analysis of test data is required although it is our expectation that optimised Middle Isongo development well locations and completions are likely to lead to flow rates in excess of 30 mmscfd per well.

 

Forward plan

An update announcement will be released on completion of the forthcoming second DST which will be performed over the Intra Isongo sands. The IM-5 well will then be suspended as a future development well on completion of testing activities.

Further announcements on drilling activities will be made as appropriate.

 

Kevin Hart, Chief Executive, said:

 

"The results from the IM-5 well continue to please. We are encouraged to see the first DST result at IM-5 confirm the deliverability of liquid-rich hydrocarbons from the Middle Isongo reservoir interval at commercial rates in excess of our pre-drill estimates. This result bodes well for the planned phased development of Etinde. We now look forward to test results from the Intra Isongo."

 

 

ENQUIRIES

For further information please contact:

 

Bowleven plc

Kevin Hart, Chief Executive 00 44 131 524 5678

Kerry Crawford, Head of Investor Relations

 

Brunswick Group LLP

Patrick Handley 00 44 207 404 5959

Catriona McDermott

Bank of America Merrill Lynch (Nomad)

Derek Ross 00 44 207 628 1000

Tony White

 

 

Notes to Editors:

Bowleven is an African focused oil and gas exploration group, based in Edinburgh and traded on AIM. Bowleven's strategy is focused on creating and realising material value through exploration led organic growth. Bowleven holds equity interests in five blocks in Cameroon, with three blocks located offshore in shallow water and two onshore. All of these blocks are operated by Bowleven. Bowleven also holds an equity interest in an onshore block in Kenya operated by Adamantine Energy.

 

The total flow period for the IM-5 Middle Isongo DST over various choke sizes was 48 hours with an overall test duration of several days.

 

 

Notes to Announcement:

 

(1) The information in this release reflects the views and opinions of Bowleven as operator and has not been reviewed in advance by its joint venture partners.

 

(2) The technical information in this release has been reviewed by Ed Willett, who is a qualified person for the purposes of the AIM Guidance Note for Mining, Oil and Gas Companies. Ed Willett, Exploration Director of Bowleven plc, is a geologist and geophysicist, a Fellow of the Geological Society (FGS) and a member of the Petroleum Exploration Society of Great Britain (PESGB) with over 25 years' experience in oil and gas exploration and production. 

 

 

GLOSSARY OF TERMS

The following are the main terms and abbreviations used in this announcement:

 

AIM

Alternative Investment Market

API

a specific gravity scale developed by the American Petroleum Institute (API) for measuring the relative density of various petroleum liquids, expressed in degrees

bbls/mmscf

barrels per million standard cubic feet of gas

bcpd

barrels of condensate per day

boepd

barrels of oil equivalent per day

Bowleven

Bowleven plc and/or its subsidiaries as appropriate

CGR

condensate gas ratio

Company

Bowleven plc

DST

drill stem test

Etinde Permit or Etinde

the production sharing contract between the Republic of Cameroon and EurOil Limited (an indirectly wholly owned subsidiary of the Company) dated 22 December 2008 in respect of the area of approximately 2,316 km², comprising former blocks MLHP-5, MLHP-6 and MLHP-7, offshore Cameroon; or, as the context may require, the contract area to which this production sharing contract relates

Group

the Company and its direct and indirect subsidiaries

HWC

hydrocarbon water contact

LPG

Liquefied Petroleum Gas

MD

measured depth

mmscfd

million standard cubic feet of gas per day

TD

total depth

 

For the purposes of this announcement, 6 mscf of gas has been converted to 1 boe.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLSSLFUFFDSELL
Date   Source Headline
24th Jul 20157:00 amRNSBomono Drilling Update
1st Jun 20157:00 amRNSBomono Operational Update
22nd May 20158:23 amRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
19th May 20153:33 pmRNSHolding(s) in Company
5th May 20157:01 amRNSBoard Changes
26th Mar 20157:00 amRNSDirector/PDMR Shareholding
25th Mar 20157:00 amRNSInterim Results Announcement
17th Mar 20157:00 amRNSEtinde Farm-Out Completed $165m Cash Received
4th Mar 20157:00 amRNSGroup Operational Update
24th Feb 20157:00 amRNSEtinde Farm-Out Update
30th Jan 20157:00 amRNSEtinde Farm-Out Update
21st Jan 20157:00 amRNSBomono Operational Update
9th Jan 20154:23 pmRNSEtinde Farm-out Update
23rd Dec 20142:29 pmRNSGrant of 2014 Bowleven Long-Term Incentive Plan
23rd Dec 201412:39 pmRNSDirector's Interest
23rd Dec 20147:00 amRNSEtinde Permit Update
18th Dec 201412:39 pmRNSRESULT OF ANNUAL GENERAL MEETING
16th Dec 20144:12 pmRNSDirector's Interest
16th Dec 20147:00 amRNSLong Term Incentive Plan
9th Dec 20147:00 amRNSBomono Permit - Licence Extension Granted
9th Dec 20147:00 amRNSBomono Permit - Licence Extension Granted
1st Dec 20147:00 amRNSAppointment of Nominated Adviser & Joint Broker
24th Nov 20144:37 pmRNSAnnual Financial Report
18th Nov 20143:50 pmRNSHolding(s) in Company
12th Nov 20147:00 amRNSPreliminary Results Announcement
28th Oct 20142:31 pmRNSEtinde - Longstop Date Extension Confirmed
27th Oct 20147:00 amRNSEtinde Farm-out Update
30th Sep 20147:30 amRNSTotal Voting Rights
1st Sep 20145:28 pmRNSBlock Admission Six Monthly Return
26th Aug 20147:00 amRNSEtinde Farm-out to LUKOIL/NewAge - Update
4th Aug 20147:00 amRNSEtinde Exploitation Authorisation Awarded
1st Aug 201410:58 amRNSHolding(s) in Company
21st Jul 201412:47 pmRNSResult of General Meeting
15th Jul 20147:00 amRNSUpdate on Petrofac Strategic Alliance Agreement
30th Jun 20144:10 pmRNSPosting of Circular to Shareholders
27th Jun 201410:46 amRNSDirector/PDMR Shareholding
27th Jun 20147:00 amRNSBomono Permit
24th Jun 20147:00 amRNSEtinde Farm-out agreement signed
3rd Jun 20147:00 amRNSEtinde Exploitation Authorisation Update
2nd May 20143:24 pmRNSHolding(s) in Company
9th Apr 20149:00 amRNSBlock Admission Return
7th Apr 201411:15 amRNSHolding(s) in Company
2nd Apr 201410:37 amRNSHolding(s) in Company
31st Mar 20147:00 amRNSInterim Results Announcement
14th Mar 20143:40 pmRNSHolding(s) in Company
4th Mar 20145:15 pmRNSHolding(s) in Company
6th Feb 20147:00 amRNSEtinde Exploitation Authorisation Update
23rd Jan 20144:31 pmRNSHolding(s) in Company
13th Jan 20144:48 pmRNSDirector Share Awards
9th Jan 20143:40 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.