Amerisur Resources Plc, the oil and gas producer and explorer focused on South America, is pleased to provide the following update on operations at the Iguasa-1 well in the Fenix block in Colombia. 

Highlights

Nine discrete sand intervals below 4,031ft have hydrocarbon saturations with potential net pay true vertical thickness of approximately 150ft

Light, sweet crude oil recovered from drill stem test of first sand interval tested

Eight further sand intervals to be tested 

Additional substantial sands, with an apparent net thickness of approximately 205ft were encountered from a depth of 980 to 1,295ft, and appear to be hydrocarbon bearing - testing options being reviewed

The Company set and successfully cemented a 7" liner over the section 3,931 to 5,605ft as planned. Interpretation of the electric logs over this section indicated that there are nine discrete sand intervals which have hydrocarbon saturations which could be sufficient to produce hydrocarbons. This potential net pay has a true vertical thickness of approximately 150ft. The log analysis did not indicate the presence of any water wet reservoirs within the interval. This section comprises the sub-units known as the K, L1 and L3 of the Esmeralda - La Paz formation.

A fluids and pressure test was performed on the deepest identified interval, 5,327 to 5,336ft using drill stem test equipment. This test included three short flow tests and pressure build up periods. 35˚API oil was recovered at surface, together with associated gas. The oil had 0% base sediment and water ("BS&W") and did not contain any identifiable concentrations of H2S. The oil tested is therefore Light, Sweet, Crude oil. The pressure and flow data are currently being analysed in order to plan the remainder of the testing programme in this zone and in the remaining eight intervals which the Company considers merit further investigation.

Given these excellent results, and the scale of the testing required, the Company decided to release the Petrex PTX-22 drilling rig in order to mobilise a smaller rig more suited to this type of operation. This change will reduce considerably the costs associated with the testing.

Additionally to the potential reservoir sections encountered in the lowest part of the well, the Company is also pleased to report that substantial sands, with an apparent net thickness of approximately 205ft were encountered beneath the first thrust fault from 980 to 1,295ft. The electric logs over those sections have been analysed and indicate that the sands are hydrocarbon bearing. Significant shows of oil and gas were observed while drilling those zones. The Company is now reviewing options to test these potential accumulations. 

John Wardle, CEO commented:

 

"I am very pleased both with the analysis of the logs and the results of the initial test in the lowest zone, which has very similar characteristics to the remainder of our sands. I am hopeful that they may all be similarly productive.

"The oil quality is at the high end of the expected range. The quantity and quality of potential reservoir we have encountered is encouraging, and will need a detailed and thorough testing effort over the coming months. For that reason I welcome the change of rig, which follows our philosophy of conserving our cash while delivering best in class results. Although we have still to perform a definitive flow test of the zones, it is apparent that we have considerable production potential in the lower section of the well.

"The sands in the upper section, below the first fault are also very interesting and may represent a significant upside in the block, since they indicate that the prospect we call Rio Cachira may extend into the La Tigra area. In any event, the results of Iguasa-1 at all depths significantly de-risk the other prospects in the block, as well as considerably enhancing the potential of the Rio Cachira prospect.

"The drilling of this well completes our contractual commitment for this phase of the Exploration and Production Contract, demonstrating once more Amerisur´s commitment to delivery and compliance."

 

Giles Clarke, Chairman said: 

 

"This is a great result for Amerisur. We are focused on evaluating this well with a view to establishing production. It was a difficult and demanding well to drill and I congratulate our executive team in Colombia on achieving the well objectives safely, on time and within budget. We look forward to updating shareholders as the testing develops."

Competent person: Technical information in this announcement has been reviewed by John Wardle Ph.D., the Company's Chief Executive. John Wardle has 24 years experience in the industry, having worked for BP, Britoil, Emerald Energy and Pebercan, and is a trained drilling engineer.

ENQUIRIES:

Billy Clegg/Caroline Stewart, 

Financial Dynamics

Tel: +44 (0)207 831 3113

Jerry Keen/Lindsay Mair,

Astaire Securities Plc

Tel: +44 (0)207 448 4492

Notes to editors

The Fenix Contract is an Exploration and Production Contract held with the Agencia Nacional de Hidrocarburos. The block is located in the Middle Magdalena Valley area of Colombia and covers 24,116 hectares. Nearby oil fields include Bonanza, Provincia and Payoa. The contract is currently in its second exploration phase of 14 months which terminates on 21 February 2010. The Company holds 100% of the block through its subsidiary companies.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCIFFLVFFLFIIA
Date   Source Headline
23rd Jul 20192:15 pmBUSForm 8.3 - Amerisur Resources Plc
23rd Jul 20191:25 pmRNSForm 8.3 - Amerisur Resources plc - Amendment
23rd Jul 201912:00 pmRNSForm 8.5 (EPT/RI) - Amerisur Resources plc
23rd Jul 201911:55 amRNSForm 8.5 (EPT/NON-RI)
23rd Jul 201910:58 amRNSForm 8.5 (EPT/NON-RI)
23rd Jul 201910:01 amRNSForm 8.3 - Amerisur Resources plc
23rd Jul 20199:48 amGNWForm 8.5 (EPT/RI) - Amerisur Resources plc
22nd Jul 20194:09 pmEQSForm 8.3 - Chelverton UK Dividend Trust plc: Amerisur Resources Plc
22nd Jul 20193:29 pmRNSForm 8.3 - Amerisur Resources Plc
22nd Jul 20193:18 pmRNSForm 8.3 - [AMERISUR RESOURCES PLC]
22nd Jul 201912:00 pmRNSForm 8.5 (EPT/RI) - Amerisur Resources plc
22nd Jul 201911:57 amRNSForm 8.5 (EPT/NON-RI)
22nd Jul 201911:45 amPRNForm 8.3 - Amerisur Resources Plc
22nd Jul 201910:48 amRNSForm 8.5 (EPT/NON-RI)
22nd Jul 201910:38 amRNSForm 8.3 - Amerisur Resources plc
22nd Jul 201910:24 amGNWForm 8.3 - [Amerisur Resources plc]
22nd Jul 20199:01 amGNWForm 8.5 (EPT/RI) - Amerisur Resources plc
22nd Jul 20198:10 amRNSPossible offer from Etablissements Maurel & Prom
22nd Jul 20197:00 amRNSPossible Offer for Amerisur Resources plc
19th Jul 20192:28 pmRNSForm 8.3 - Amerisur Resources Plc
19th Jul 20199:30 amRNSStrategic review including formal sale process
17th Jun 20197:00 amRNSProposed Disposal of 50% of Put-8 to Occidental
17th Jun 20197:00 amRNSSol-1 Update
11th Jun 20197:00 amRNSOperations Update
31st May 20197:00 amRNSBlock Listing Six Monthly Return
29th May 201911:05 amRNSHolding(s) in Company
14th May 20195:00 pmRNSResult of Annual General Meeting
14th May 20197:00 amRNSPre AGM Operations Update
9th May 201911:00 amRNSNotice of Annual General Meeting
7th May 20197:00 amRNSOBA Third Party Transportation Approvals
23rd Apr 20197:00 amRNSDeath of Non-Executive Director
15th Apr 20197:00 amRNSLong Term Incentive Plan ("LTIP") Awards
9th Apr 20197:00 amRNSFinal Results for the year ended 31 December 2018
26th Mar 20197:00 amRNSOperations Update
20th Mar 20197:00 amRNSExercise of Right of First Refusal Put-8
6th Mar 20197:00 amRNSReserves Update
4th Feb 20197:00 amRNSSpudding of Calao-1X, CPO-5
23rd Jan 20197:00 amRNSExercise of Options under Long Term Incentive Plan
22nd Jan 20197:00 amRNSReserves, Operational and Production Update
3rd Jan 20191:24 pmRNSDirector Share Dealing
3rd Jan 20191:10 pmRNSDirector Share Dealing
2nd Jan 20192:51 pmRNSDirector Share Dealing
2nd Jan 20197:00 amRNSCPO -5 Operational Update
31st Dec 201812:33 pmRNSRetirement of Non-Executive Director
31st Dec 20187:00 amRNSCompletion of Putumayo Acquisition
27th Dec 20187:00 amRNSDirectorate Change
18th Dec 20184:37 pmRNSPrice Monitoring Extension
10th Dec 20187:00 amRNSOil Discovery at Indico-1
30th Nov 20187:00 amRNSBlock listing six monthly return
29th Nov 20188:49 amRNSDirector Share Dealing

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.