The next focusIR Investor Webinar takes places on 14th May with guest speakers from Blue Whale Growth Fund, Taseko Mines, Kavango Resources and CQS Natural Resources fund. Please register here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAmur Minerals Regulatory News (AMC)

  • This share is currently suspended. It was suspended at a price of 0.09

Share Price Information for Amur Minerals (AMC)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.09
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 0.09
AMC Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Kun-Manie Operating Cost Update

10 May 2017 07:00

RNS Number : 6613E
Amur Minerals Corporation
10 May 2017
 

 

10 May 2017

 

AMUR MINERALS CORPORATION

(AIM: AMC)

 

Kun-Manie Operating Cost Update

 

Amur Minerals Corporation ("Amur" or the "Company"), a nickel-copper sulphide mineral exploration and resource development company focused on the far east of Russia, is pleased to announce that a review of its internally derived operating cost estimates is well advanced and being completed by Runge Asia Limited ("Runge"). The independent assessment will allow the Company to establish the mining potential of its Kun-Manie nickel copper project located in Amur Oblast of the Russian Far East.

 

Highlights

 

· Runge is independently compiling first principles mine site operating cost estimates for Amur's Kun-Manie nickel copper sulphide project. This is a key component for the determination of the open pit and underground mining potential for the four deposits planned for mining. These deposits are Maly Kurumkon / Flangovy ("MKF"), Ikenskoe / Sobolevsky ("IKEN"), Vodorazdelny ("VOD") and Kubuk ("KUB").

 

· The operating costs estimate is based on Russian costs and productivity factors, and include depreciation, equipment replacement requirements and any additionally identified items.

 

· Runge will provide the Company with applicable fixed and variable operating unit rates and results are anticipated to be up to an accuracy of ±25%. Most operating cost estimates will be based on Q2 2017 information. Amur and Runge consider historical operating costs to be obsolete.

 

· To date, the review and determination of operating costs has not identified any fatal flaws in previous reported information by the Company.

 

· Runge's remit also includes the identification of any potential areas where the operation could be improved operationally over that established by Amur. This could include potential improvement in productivities and provide potential operating cost reductions.

 

Robin Young, CEO of Amur Minerals, commented:

 

"Runge's review and development of Russian based operating costs will provide critical information for the evaluation of the economic potential of Kun-Manie. The final costs will permit Amur to undertake the generation of an independent estimate of the mining potential for all four of our deposits.

 

''The mining potential evaluation will be involved and intricate in order to ensure that we establish an optimised mine plan and production schedule. At present, two mining methods, open pit and underground, have been identified at three of our four deposits. With each of the deposits differing in terms of metallurgical recoveries and operating cost, this will not be a rapid nor easy task.

 

''Having production derived from four deposits does present opportunity. We can consider the blending of ores and target extraction of the higher operating profit tonnages from multiple locations, not just one deposit. Multiple challenges also provide multiple opportunities to increase production of higher profit tonnages at earlier stages in the life of the project."

 

Further information:

 

The determination of operating costs for the Kun-Manie nickel copper sulphide project will be used in the determination of the technical and economic potential of its proposed operation. The Runge results will supplant previously reported operating cost projections which should be considered to be obsolete.

 

The operation is to consist of:

 

· Ore production of 6.0 million tonnes per year.

 

· Mining is planned to be conducted by a combination of open pit and underground methods (long hole retreat) from four distinct deposits.

 

· Ore to be processed at the mine site using proven sulphide flotation methods with recoveries of nickel and copper in the order of 75 to 85% respectively.

 

· The concentrate will contain approximately 10% economic metals including nickel, copper, cobalt, platinum, palladium, gold and silver. A minimum of 30,000 tonnes of nickel per year are projected to be produced which would place the operation among the 10 largest annual nickel producers.

 

· The concentrate can be processed at contract smelters or by a Company owned furnace to generate a low grade matte for onward refining and sale.

 

· The project is fully supported by the Russian government as part of the Far East Development programme and is eligible for low cost funding of infrastructure related support including construction of its access road from its supply station on the Baikal Amur rail line to the Kun-Manie site and for the extension of the power grid from existing sources to the potential furnace capable of treating the concentrate to generate the low grade matte.

 

· The project is located adjacent to the three largest nickel consuming markets of China, Japan and Korea.

 

 

Market Abuse Regulation (MAR) Disclosure

 

Certain information contained in this announcement would have been deemed inside information for the purposes of Article 7 of Regulation (EU) No 596/2014 until the release of this announcement.

 

Enquiries:

 

Company

Amur Minerals Corp.

Nomad and Broker

S.P. Angel Corporate Finance LLP

Public Relations

Yellow Jersey

Robin Young CEO

Ewan Leggat

Soltan Tagiev

Charles Goodwin

Harriet Jackson

+7(4212)755615

+44(0)20 3470 0470

+44(0)7 544 275 882

 

Notes to Editors

 

The information contained in this announcement has been reviewed and approved by the CEO of Amur, Mr. Robin Young. Mr. Young is a Geological Engineer (cum laude), a Professional Geologist licensed by the Utah Division of Occupational and Professional Licensing, and is a Qualified Professional Geologist, as defined by the Toronto and Vancouver Stock Exchanges. An employee of Amur for 12 years, previously Mr. Young was employed as an independent consultant with Fluor Engineers, Fluor Australia and Western Services Engineering, Inc. during which time his responsibilities included the independent compilation of resources and reserves in accordance with JORC standards. In addition, he was the lead engineer and participant of numerous studies and projects requiring the compilation of independent Bankable Studies utilised to finance small to large scale projects located worldwide. Mr. Young is responsible for the content of this announcement.

 

For further information, see the Company website at www.amurminerals.com.

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAKSNESDXEFF
Date   Source Headline
14th Jul 202010:55 amRNSResponse to Price Movement
13th Jul 202012:02 pmRNSPrice Monitoring Extension
6th Jul 20204:40 pmRNSSecond Price Monitoring Extn
6th Jul 20204:36 pmRNSPrice Monitoring Extension
26th Jun 20209:03 amRNSAUDITED FINAL RESULTS YEAR ENDED 31 DECEMBER 2019
24th Jun 20207:00 amRNSBankable Feasibility Study Strategy
19th Jun 202011:34 amRNSExtraordinary General Meeting Results
12th Jun 20203:40 pmRNSPosting of Q&A ahead of EGM
12th Jun 202012:02 pmRNSPrice Monitoring Extension
11th Jun 20207:00 amRNSTEO Update – Indicative Revenue Terms
2nd Jun 20207:00 amRNSNotice of Extraordinary General Meeting
1st Jun 20207:00 amRNSKun-Manie Copper Concentrate Update
27th May 20207:00 amRNSEquity Placing
21st May 20204:40 pmRNSSecond Price Monitoring Extn
21st May 20204:35 pmRNSPrice Monitoring Extension
20th May 20207:00 amRNSDirector Change
4th May 20203:39 pmRNSRepayment of Loan
16th Apr 20204:40 pmRNSSecond Price Monitoring Extn
16th Apr 20204:36 pmRNSPrice Monitoring Extension
16th Apr 20204:25 pmRNSEquity Placing
3rd Apr 202012:31 pmRNSGrant of Options
31st Mar 202012:07 pmRNSSecond Price Monitoring Extn
31st Mar 202012:03 pmRNSPrice Monitoring Extension
30th Mar 20204:41 pmRNSSecond Price Monitoring Extn
30th Mar 20204:36 pmRNSPrice Monitoring Extension
16th Mar 202010:58 amRNSReceipt of Proceeds of Initial Advance
12th Mar 202010:48 amRNSFixed Term Loan Note Instrument to Complete TEO
21st Feb 20207:00 amRNSIssue of Warrants
17th Feb 20207:00 amRNSMetallurgical Results Update
13th Feb 202010:37 amRNSReplacement Advisor to the Board Appointment
13th Feb 20207:00 amRNSAdvisor to the Board Appointment
28th Jan 20207:00 amRNSRock Mechanics Assessment Complete
15th Jan 20207:00 amRNSBase Line Environmental Assessment Complete
31st Dec 20197:00 amRNSPermanent Conditions TEO Update
13th Dec 201910:17 amRNSAnnual General Meeting Results
2nd Dec 20197:00 amRNSIssue of Equity
25th Nov 20198:47 amRNSNotice of Annual General Meeting
20th Nov 20199:22 amRNSInvestor Event
18th Nov 20191:47 pmRNSRepayment of Convertible Loan
13th Nov 20197:00 amRNSResults of shareholder analysis
12th Nov 20197:00 amRNSHydrological Assessment Complete
4th Nov 20197:00 amRNSIssue of Equity
30th Oct 20192:53 pmRNSConversion of Loan and Issue of Equity
30th Sep 20199:53 amRNSInterim Results 2019
23rd Sep 20197:00 amRNSPermanent Conditions TEO Update
16th Sep 20197:00 amRNSTEO Reserve Estimation Programme Initiated
2nd Sep 20199:16 amRNSConversion of Loan and Issue of Equity
27th Aug 20197:36 amRNSIssue of Equity
7th Aug 20197:00 amRNSBoard Appointment
1st Aug 20198:57 amRNSConversion of Loan and Issue of Equity

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.