Extended well test9 Aug 2018 15:47
Getting a bit silly now, best tested wells in the world
T-45
Extended well stimulation and testing program commenced on 8 April 2018. 6m (3m of Zone 14 and 3m of Zone 15) out of the identified 98.9m combined pay interval from Zones 9, 14 and 15 of the Eldari reservoir has been perforated, mechanically stimulated and flowed together. The well naturally flowed light, sweet crude oil at a stabilised flow rate of 270 bbls per day. The intention is to continue to test the combined flow of Zones 14 and 15 and, within a period of approximately 60 days
123 days testing from the 8th of April or 93 days from the date of the 8th May RNS
Dino 2
Extended well stimulation and testing program commenced on 7 May 2018. 6m (3m of Zone 14 and 3m of Zone 15) out of the identified 78.8m of combined pay interval from target Zones 9, 14 and 15 will be perforated, mechanically stimulated and flow tested together. Zone 9 is intended to be perforated, stimulated and produced together with Zones 14 and 15 within a 60-90 day period from the commencement of testing of Zones 14 and 15.
94 days testing from 7th May or 93 days from the 8th May RNS
T-39
On 4 July 2018, Extended Well Testing ("EWT") commenced at T-39 well, by perforation of 21m interval of Zone 19, situated between 2970m and 3000m. After a well clean out, the well started to flow light ( 41.5 API), sweet crude oil together with wet gas and, under natural flow, achieved following production rates: 529 bbls/d of oil and 600,000 scf/d of gas using an 8/64" chock size, 347 bbls/d of oil and 425,000 scf/d of gas using an 7/64" chock size and 250 bbls/d of oil and 350,000 scf/d of gas through 6/64" chock, demonstrating excellent well deliverability.
36 days testing
I really hope Zaza inst hoping to hide low/mediocre results from T-45 and Dino in amongst a decent T-39 result. He tried that last time!! look how that turned out. No evidence to say he will though perhaps they are going for a test duration world record.
GLA here's hoping its #MASSIVE