Balcombe expectations11 Sep 2018 12:28
What is everyone expecting from the 2z Balcombe well?
The Balcombe – 2Z side track has opened up an approximately 1,700 ft horizontal section through the upper Kimmeridge Micrite, which is naturally fractured and offers an extensive zone through the reservoir to test.
The upper Kimmeridge has flowed 900bopd at HorseHill but the 2z is horizontal through 1,700 ft.
Also, UKOG announced yesterday that a horizontal side track at HH in the Portland pools may increase flows from 362 to possibly 720 - 1,080bopd.
Can we expect a similar magnitude of increase for the Upper Kim's at Balcombe?
Any thoughts anyone.