What is wrong with today's RNS.. WHY ARE WE RED?15 Sep 2021 14:53
Phase One annual metal production has now been calculated to be equal to 128 Koz of palladium equivalent, over 70% higher than the volume projected in the FS. This production volume does not include Monchetundra Flanks and Rosgeo JV projects which will be separately announced... We should be BLUE