Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMXP.L Regulatory News (MXP)

  • There is currently no data for MXP

Operational Update

20 Jul 2006 16:31

Max Petroleum PLC20 July 2006 MAX PETROLEUM PLC (AIM:MXP) Operational Update Max Petroleum PLC ("Max Petroleum" or the "Company") is pleased to announce thatit will accelerate its exploration programmes in respect of highly prospectiveintermediate-depth structures identified in its Blocks A&E acreage in WesternKazakhstan. The recent seismic campaigns carried out by Max Petroleum on its A&E Blocks in2005 and 2006 have been extensive, with 1,480 kilometres (km) of new 2D seismiccompleted and 380 km of 3D seismic currently 60% complete. The seismic, coupledwith large volumes of historical data, has allowed for the identification ofseveral attractive leads at intermediate depths, both on the flanks of saltdomes and in the areas between them. This is particularly interesting and prospective because the vast majority ofSoviet-era exploration in the Company's A&E blocks was directed towards shallowsections within specific small areas in the blocks. In addition, four deep wellswere drilled in attempts to test the pre-salt section. However, no explorationwas targeted to intermediate depths of between 1,000 and 3,000 metres (m). As an example of the obvious prospectivity of the intermediate plays, theCompany has identified oil in two zones in the Soviet era deep Zharbas P-2 well,drilled in 1982, which was never tested. The well logs show two very interestingsections, one 18 m thick oil-bearing sand in the Jurassic at 1116 m and another12 m oil-bearing sand in the Permo-Triassic at 1890 m. Max Petroleum isinvestigating the feasibility of using the drilling rig contracted for thepurpose of drilling shallow wells in Block E to drill the Jurassic section inthis area in the near future. The identification of this prospect is an obvious starting point for anaggressive intermediate-depth exploration programme. Other leads have beenidentified in the intermediate section in the area surrounding the P-2 well andin several other areas in the A&E blocks. Each of the intermediate structures isestimated to have recoverable reserves from around 50 million to in excess of150 million barrels based on initial analysis by Max Petroleum engineers. Theestimates are subject to verification by Max Petroleum's competent person,McDaniel & Associates, and a further update will be provided in due course. Thismakes them economically very attractive targets, as the pressures expected atthese depths would mean good flow rates and un-assisted flow. In addition, theoil would be expected to be relatively light and free of sulphur, and thusattractive for production, processing and transport purposes. Max Petroleum is in the process of evaluating several of these intermediatestructures and will bring in additional geological/geophysical and drillingpersonnel within the short term to fast track this effort. This acceleratedintermediate exploration programme will be in addition to the alreadyestablished programmes for the shallow and deep sections of the Company's blocksand will run in parallel with these programmes. It is expected thatintermediate drilling can thus be accelerated from the fourth quarter 2007 toearly in the second quarter 2007 at the latest, with no impact on the timing ofthe Company's other exploration programmes. 20 July 2006 Enquiries: Max Petroleum PLC Steve Kappelle T: +44 (0)20 7355 9590 Chief Executive Officer Pelham Public Relations Charles Vivian T: +44 (0)20 7743 6672 E : Charles.vivian@pelhampr.com Alisdair Haythornthwaite T : +44 (0) 20 7743 6676 E: Alisdair.haythornthwaite@pelhampr.com WH Ireland Ltd Paul Dudley T : +44 (0) 20 7220 1666 E : paul.dudley@wh-ireland.co.uk Henrik Busk, Petroleum Engineering and Geology Manager of Max Petroleum, aPetroleum Geologist, is the qualified person that has reviewed and approved thetechnical information contained in this announcement. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
31st Mar 201111:53 amRNSTotal Voting Rights
24th Mar 20117:00 amRNSDrilling Update
14th Mar 20117:00 amRNSIssuance of Additional Options
11th Mar 20114:27 pmRNSHolding(s) in Company
11th Mar 20117:00 amRNSExercise of warrants
10th Mar 20117:00 amRNSExercise of Warrants
8th Mar 20114:02 pmRNSHolding(s) in Company
7th Mar 20113:08 pmRNSHolding(s) in Company
4th Mar 20113:00 pmRNSExercise of Warrants
3rd Mar 201112:58 pmRNSHolding(s) in Company
1st Mar 201111:46 amRNSResult of General Meeting and Bondholder Meeting
28th Feb 201110:52 amRNSTotal Voting Rights
17th Feb 20117:00 amRNSDrilling Update
16th Feb 20113:37 pmRNSHolding(s) in Company
16th Feb 20117:00 amRNSDrilling Update
14th Feb 20119:52 amRNSHolding(s) in Company
11th Feb 201110:45 amRNSExercise of Warrants
4th Feb 201111:31 amRNSExercise of warrants
4th Feb 20117:00 amRNSResult of placing
2nd Feb 20117:00 amRNSProposed Cash Placing
31st Jan 20117:00 amRNSOperational Update
6th Jan 20117:00 amRNSOperational Update
17th Dec 20107:00 amRNS2010 Interim Results Announcement
15th Dec 20107:00 amRNSExtension of Blocks A&E Licence Exploration Period
9th Dec 201012:35 pmRNSDrilling Update
2nd Dec 20107:00 amRNSDrilling and Operational Update
30th Nov 20101:43 pmRNSTotal Voting Rights
15th Nov 20103:31 pmRNSExercise of Warrants
29th Oct 201011:40 amRNSTotal Voting Rights
28th Oct 20107:00 amRNSDrilling Update
27th Oct 20103:01 pmRNSExercise of Warrants
19th Oct 201010:00 amRNSDrilling Update
15th Oct 20107:30 amRNSDrilling Update
11th Oct 20105:01 pmRNSHolding(s) in Company
27th Sep 201011:30 amRNSResult of AGM
27th Sep 20107:00 amRNSExecution of Drilling Contract
24th Sep 201010:52 amRNSResults of Bondholder Meeting
24th Sep 20107:00 amRNSSupreme Court Ruling on Tax Claim
20th Sep 20107:00 amRNSOperational Update
15th Sep 20105:05 pmRNSHolding(s) in Company
7th Sep 20107:00 amRNSBond interest deferral and issue of warrants
31st Aug 20107:00 amRNSExtension of Blocks A&E Licence Exploration Period
26th Aug 20107:00 amRNSAnnual Report and Accounts and Notice of AGM
25th Aug 201010:01 amRNSDrilling Update
9th Aug 20107:00 amRNSDrilling Update
19th Jul 20107:00 amRNSAstrakhanskiy Licence Status
15th Jul 20102:33 pmRNSDrilling Update
12th Jul 20107:00 amRNSResource Estimates of Exploration Potential
5th Jul 20109:46 amRNSExtension of Tax Claim Payment
30th Jun 201010:32 amRNSTotal Voting Rights

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.