NEWS RELEASE

17 October 2019

Ā 

Ā 

VERMELHO PRE-FEASIBILITY STUDY RETURNS NPV OF US$1.7 BILLION AND CONFIRMS LOW COST, LONG LIFE NICKEL SULPHATE PROJECT

Ā 

Ā 

Ā 

Horizonte Minerals Plc, (AIM/TSX: HZM) ('Horizonte' or 'the Company') the nickel development company focused in Brazil, is pleased to publish the results of the Pre-Feasibility Study ('PFS' or the 'Study') for the 100% owned Vermelho Nickel-Cobalt Project ('Vermelho, or 'the Project') in Brazil's ParÔ State.

Ā 

Highlights:

Ā 

Ā·; TheĀ StudyĀ confirmsĀ VermelhoĀ asĀ aĀ large,Ā high-gradeĀ resource,Ā with a long mine life and low-cost source of nickel sulphate for the battery industry;

Ā 

Ā·; The compellingĀ economicĀ andĀ technicalĀ resultsĀ fromĀ theĀ study support further development of the project towards a full Feasibility Study;

Ā 

Ā·; A 38-year mine life estimated to generate total cash flows after taxation of US$7.3billion[1];

Ā 

Ā·; An estimated Base Case post-tax Net Present Value1 ('NPV') of US$1.7 billion[2] and Internal Rate of Return ('IRR') of 26%;

Ā 

Ā·; At full production capacity the ProjectĀ isĀ expectedĀ toĀ produceĀ anĀ averageĀ ofĀ 25,000 tonnesĀ ofĀ nickel and 1,250 tonnes of cobalt per annum utilising the High-Pressure Acid Leach process;

Ā 

Ā·; TheĀ baseĀ case PFSĀ economicsĀ assumeĀ aĀ flatĀ nickelĀ priceĀ ofĀ US$16,400Ā perĀ tonneĀ ('/t')Ā forĀ the 38-yearĀ mineĀ life;

Ā 

Ā·; C1 (Brook Hunt) cash cost of US$8,020/t Ni (US$3.64/lb Ni), defines Vermelho as a low-costĀ producer;

Ā 

Ā·; Initial Capital Cost estimate is US$652 million (AACE class 4), including US$97.7 million of contingenciesĀ (equating to approximately 18% of capital); and

Ā 

Ā·; Vermelho is set to deliver significant socio-economic benefits for communities in the ParĆ” state,Ā includingĀ overĀ 1,800 directĀ jobsĀ inĀ theĀ constructionĀ phase,Ā and over 600 jobs during operation,Ā asĀ wellĀ asĀ additionalĀ economicĀ andĀ socialĀ developmentĀ programs.

Ā 

Ā 

Ā 

Ā 

Horizonte CEO, Jeremy Martin, commented;

Ā 

"IĀ amĀ delightedĀ toĀ deliver the Pre-FeasibilityĀ StudyĀ forĀ theĀ VermelhoĀ nickel-cobaltĀ project which represents another significant milestone delivered by the Company this year.Ā TheĀ Study now positions Horizonte as a multi-asset nickel developer with a combined NPV in excess of US$2.5 billion at current nickel prices across the Araguaia and Vermelho projects.

Ā 

The PFS demonstrates that Vermelho can be a significant low-cost supplier of nickel in the form of battery grade nickel-sulphate. Over the 38-year mine life using the Base Case nickel price of $16,400, the operation is expected to generate cash flows after taxation of US$7.3 billion, an IRR of over 26%, and sits on the lower half of the global cost curve. If we apply the long-term Wood Mackenzie nickel price of US$19,800, the project IRR increases to 31% and the NPV to approximately $2.3 billion.

Ā 

Importantly, the Vermelho project will also produce battery grade cobalt sulphate, another key component for the electric vehicle ('EV') battery industry with 60% of global supply currently sourced from a single country. The consumer driven EV market is trending towards both sustainability and ethically sourced materials, including nickel and cobalt, and we see both of the Company's projects in Brazil as being attractive to end users who are focused on traceable, ethically sourced materials.

Ā 

With the PFS now successfully completed, the priority now is to identify partners, secure funding and advance the project by undertaking a full feasibility study on Vermelho. We will look to the replicate the success achieved by the Coral Bay Nickel Corporation where the company is currently producing around 20,000 tonnes per year of nickel utilising a twin line HPAL plant. This was a low capex plant which has been operating successfully for the last 15 years.

Ā 

With a combined contained nickel inventory of over 4 million tonnes and the obvious synergies that come with having two world-class projects within 85 kilometres of each other in a stable and mining friendly jurisdiction, we have further cemented the Company as having one of the largest undeveloped nickel portfolios in the world. With financing discussions underway to commence the construction of Araguaia and Vermelho demonstrating significant economic potential, Horizonte is well positioned, owning two high-quality projects at an advanced stage.

Ā 

The nickel market fundamentals continue to be positive for the short to long term, driven by robust demand from stainless steel growth and anticipated increase in EV penetration rates. Physical LME metal inventories continue to be drawn down to levels not seen in the last five years. This, combined with a lack of new major projects scheduled to come online in the short term, means that this is an opportune time to develop Vermelho."

Ā 

Analyst conference call and presentation

HorizonteĀ willĀ hostĀ anĀ analystĀ conferenceĀ callĀ andĀ presentationĀ today, 17Ā OctoberĀ 2019,Ā at 11:00 BST. Participants can access the call by dialling one of the following numbers below approximatelyĀ 10Ā minutesĀ priorĀ toĀ theĀ startĀ ofĀ theĀ call.

UK Toll-Free Number: 0800 358 9473

PIN: 91815157#

Ā UK Toll Number: +44 3333 000 804

PIN: 91815157#

The presentation will be available for download from the Company's website www.horizonteminerals.com or by clicking on the link below:

Ā 

https://www.anywhereconference.com?Conference=301302216&PIN=91815157&UserAudioMode=DATA

Ā 

A recording of the conference call will subsequently be available on the Company's website.

Ā 

Vermelho Pre-Feasibility Study Detailed InformationĀ Project Summary

The Project is located in the north-western Brazilian state of ParƔ in the CarajƔs Mining District, approximately 85 kilometres ('km') north-west of the Company's 100% owned Araguaia North Project.

Ā 

The Project comprises a planned 38 year operation with an open pit nickel laterite mining operation that mines a 141.3Ā million tonne (Mt) Probable Mineral Reserve (at a cut-off of 0.7% Ni) to produce 924,000 tonnes of nickel contained in nickel sulphate, 36,000 tonnes of cobalt contained in cobalt sulphate and a saleable by-product, kieserite (a form of fertiliser) of which 4.48Ā Mt are produced. The project will utilise a hydro-metallurgical process comprised of a beneficiation plant where ore is upgraded prior to being fed to a High-Pressure Acid Leach (HPAL) and refining Plant which produces the sulphates. The plant will be constructed in two phases, with an initial capacity of 1Ā Mt per annum (Mt/a) autoclave feed (Stage 1), then after three years of production, a second process train (Stage 2 Expansion) will be constructed effectively doubling the autoclave feed rate to 2Ā Mt/a. The Stage 1 plant and project infrastructure will be constructed over a 31-month period. The nickel and cobalt sulphate products will be transported by road to the port of Vila do Conde (the same facility planned for Araguaia) for sale to overseas customers. The kieserite will be transported to consumers within ParĆ” state.

Ā 

The engineering has been developed for the process plant, mining, infrastructure and utilities to support capital ('capex') and operating expenditure ('opex') estimates to an Association for the Advancement of Cost Engineering (AACE) class 4 standard. This means that capex and opex estimates have a combined accuracy of between -25% and +20% at a confidence level of 50%. The capex and opex are dated Q2 2019 and are exclusive of future escalation.

Ā 

TheĀ resultsĀ ofĀ the PFSĀ demonstrateĀ thatĀ VermelhoĀ showsĀ positiveĀ economics (Table 1,Ā below).

Ā 

Table 1: Key Feasibility Study Project Economic Indicators (post taxation)

Item

Unit

Nickel price basis (US$/t Ni)**

Base Case 16,400

Long Term 19,800

Net cash flow

US$ M

7,304

9,546

NPV8

US$ M

1,722

2,373

IRR

%

26.3%

31.5%

Breakeven (NPV8) nickel price

US$/t

7,483

7,483

C1 cost (Brook Hunt)

US$/t Ni

Ā 8,029

Ā 8,029

C1 cost (Brook Hunt) years 1-10

US$/t Ni

Ā 7,286

Ā 7,286

Production year payback

years

Ā 4.2

Ā 3.6

LOM nickel recovered

kt

Ā 924.0

Ā 924.0

LOM cobalt recovered

kt

Ā 46.61

Ā 46.61

LOM kieserite produced

kt

Ā 4,482

Ā 4,482

LOM Total revenue

US$ M

Ā 19,034

Ā 22,175

LOM Total costs

US$ M

Ā 11,729

Ā 12,629

Operating cash flow

US$ M

Ā 8,451

Ā 10,693

Capital intensity - initial capex/t Ni

US$/t Ni

Ā 635

Ā 635

Note: ** US$2,000/t premium for battery sulphate production has been added to Nickel revenue, US$34,000/t for the cobalt produced as cobalt sulphate, and a net revenue of US$100/t of the by-product, kieserite.Ā 

The economic model assumes 100% equity, providing the opportunity for increased returns leveragingĀ commercialĀ orĀ otherĀ debt.Ā TheĀ baseĀ caseĀ wasĀ developedĀ usingĀ aĀ flatĀ nickelĀ priceĀ of US$16,400/tĀ Ni. An alternate case using the Wood Mackenzie long term Nickel price of US$19,800/t Ni was also developed

Ā 

As shown in Table 1 (above), for the base case the project has a 4.2-year payback period with cumulative gross revenues of US$19,034 million. The economic analysis indicates a post-tax NPV8 of US$1,722 million and an IRR of 26.3% using the base case forecast of US$16,400/t Ni, this increases to US$2,373 million and 31.5% when using the Wood Mackenzie long term price of US$19,800/t Ni.

Resources / Reserves and Mining

The Vermelho nickel deposits consist of two hills named V1 and V2 (after Vermelho 1 and Vermelho 2), aligned on a northeast-southwest trend, overlying ultramafic bodies. A third ultramafic body, named V3, also located in the same trend lies on flat terrain, southwest of V2. The ultramafic bodies have had an extensive history of tropical weathering, which has produced a thick profile of nickel-enriched lateritic saprolite at V1 and V2.

The Vermelho area was explored in various stages by Companhia Vale do Rio Doce ('Vale') from 1974 to 2004 involving approximately 152,000 m of combined drilling and pitting. The drilling density was substantially enhanced in 2002 to 2004, with the majority of the resource upgraded to the Measured category as defined in JORC (2004) and CIM Definition Standards (2014). Pilot plant metallurgical studies were conducted in Australia focused on the HPAL processing method. A PFS was prepared in 2003, and a Feasibility Study ('FS') was completed in August 2004 by GRD-Minproc (2005). This study confirmed the positive economics supporting the outcomes obtained in previous studies and showed production capacity of 46,000 tonnes per annum (t/a) of metallic nickel, and 2,500 t/a of metallic cobalt. The project was given construction approval in 2005 however later that year Vale elected to place the Project on hold after Vale acquired Canadian nickel producer Inco.

Mineral Resources

Snowden Mining and Industry Consultants ('Snowden') were commissioned by Horizonte to produce the Geology and Mineral Resources sections of the PFS for the Project.

Within the mining licence, at a cut-off grade of 0.7% Ni, a total of 140.8 Mt at a grade of 1.05% Ni and 0.05% Co is defined as a Measured Mineral Resource and a total of 5.0 Mt at a grade of 0.99% Ni and 0.06% Co is defined as an Indicated Mineral Resource. This gives a combined tonnage of 145.7 Mt at a grade of 1.05% Ni and 0.05% Co for Measured and Indicated Mineral Resources. A further 3.1 Mt at a grade of 0.96% Ni and 0.04% Co is defined as an Inferred Mineral Resource at a cut-off grade of 0.7% Ni.

The Mineral Resource is summarised in Table 2.

Table 2 V1 + V2 - combined classified Mineral Resource report for Vermelho above 0.7% Ni cut-off within the mining licence

Classification

Tonnage (Mt)

Ni%

Ni metal (kt)

Co%

Co metal (kt)

Fe2O3%

MgO2%

SiO2%

Measured

Ā 140.8

Ā 1.05

Ā 1,477

Ā 0.05

Ā 74.6

Ā 31.1

Ā 11.3

Ā 41.0

Indicated

Ā 5.0

Ā 0.99

Ā 49

Ā 0.06

Ā 2.8

Ā 26.3

Ā 8.6

Ā 49.0

Measured + Indicated

Ā 145.7

Ā 1.05

Ā 1,526

Ā 0.05

Ā 77.3

Ā 30.9

Ā 11.2

Ā 41.3

Inferred

Ā 3.1

Ā 0.96

Ā 29

Ā 0.04

Ā 1.4

Ā 24.0

Ā 15.5

Ā 42.2

Notes

1. Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate and have been used to derive subtotals, totals and weighted averages. Such calculations inherently involve a degree of rounding and consequently introduce a margin of error. Where these occur, Snowden does not consider them to be material.

2. Mineral Resources are reported inclusive of Mineral Reserves.

3. The reporting standard adopted for the reporting of the Mineral Resource estimate uses the terminology, definitions and guidelines given in the CIM Standards on Mineral Resources and Mineral Reserves (May 2014) as required by NI 43-101.

4. Mineral Resources are reported on 100% basis for all Project areas.

5. Snowden completed a site inspection of the deposit by Mr Andy Ross FAusIMM, an appropriate "independent qualified person" as such term is defined in NI 43-101.

6. kt = thousand tonnes (metric).

Ā 

Mineral Reserves

Mineral Reserves were prepared for the Project as part of the PFS, using the CIM Definition Standards (2014).

In accordance with the CIM Definition Standards on Mineral Resources and Mineral Reserves (as adopted and amended), Mineral Reserves are classified as either "Probable" or "Proven" Mineral Reserves and are based on Indicated and Measured Mineral Resources only in conjunction "estimation of Mineral Resource and Mineral Reserve best practice guidelines" as provided by the CIM. No Mineral Reserves have been estimated using Inferred Mineral Resources.

Ā 

All economic Measured and Indicated Resources within the pit designs were classified as Probable Reserves. A summary of the Mineral Reserves is provided in Table 3

Ā 

Table 3 Open pit Mineral Reserves reported as of October 2018

Value

Probable

Ore (Mt)

141.3

Ni (%)

0.91

Co (%)

0.052

Fe (%)

23.1

Mg (%)

3.81

Al (%)

0.79

Notes

1. Cut-off varies by resource model block depending on individual block geochemistry, however, as a guide the cut-off is approximately 0.5% Ni.

2. A site inspection on was completed four occasions between March 2017 and September 2019 by Mr Anthony Finch P. Eng. MAusIMM (CP Min.), an appropriate "independent qualified person" as such term is defined in NI 43-101.

Ā 

Mining

Snowden were commissioned by Horizonte to produce the mining plans of the PFS.

Mining at Vermelho is planned to be undertaken with conventional open pit truck and excavator mining methods. Blasting will be necessary for the upper parts of the deposit. Waste overburden will be stripped on 4 m benches, and ore on 2 m benches for additional selectivity.

Reverse circulation ('RC') grade control drilling will be completed at 12.5 m x 12.5 m spacing to define the waste/ore/ore type boundary ahead of mining.

Waste will be stored in dumps adjacent to the pits. Ore will be transported to the run of mine ('ROM') stockpile near the processing plant or the low-grade stockpiles for later processing

Due to the wet season, mining (including stockpile rehandling) will be reduced between October and March (as is standard practice in the region). It was assumed that a fleet of Scania G500 8x4 22 m3 heavy tippers will be used as part of the fleet and coarse beneficiation rejects will be used as sheeting, to mitigate trafficability issues.

The mine production schedule targeted a processing rate of 1 Mt/a HPAL feed for the first three years and a doubling in capacity thereafter to 2 Mt/a. To facilitate this, ROM feed of approximately 2.25 Mt/a to 4.5 Mt/a is required as well as an acid production capacity of 350 kt/a to 700 kt/a.

The annual mining rate starts at 8 Mt/a and peaks at 12 Mt/a between production years 5 and 11. Strip ratios for the deposit are extremely low (0.14 Waste:Ore) consequently waste dumps are relatively small.

The mine supplies higher grade ore in the early mine life to the HPAL circuit, reaching up to 2% Ni and 0.1% Co in the first four production years. The HPAL feed grade (after beneficiation) is above 1.5% Ni and 0.08% Co for the majority of the first 17 years of production and decreases over the remaining LOM as feed is sourced from large lower grade stockpiles that are to be developed in the early years and are processed in the later years.

Ā 

Ā 

Processing

Ā 

The process plant design, along with capital and operating cost estimates were completed by Simulus (Engineers) Pty Ltd, Perth Australia ('Simulus'). Simulus is a specialist in nickel and cobalt laterite project metallurgical testwork, piloting and process design.

The process selected for the Project is the production of a nickel and cobalt sulphate product via HPAL, mixed sulphide precipitation ('MSP'), pressure oxidation leaching ('POX'), cobalt solvent extraction ('CoSX') and crystallization. Prior to the HPAL process, barren free silica is removed from the ore via a beneficiation process which involves crushing, scrubbing, washing and separation by screening and hydrocyclones. To avoid accumulation of magnesium sulphate in the recycled process water, a portion is sent to the Kieserite (magnesium sulphate monohydrate, MgSO4•H2O) crystallization area where Kieserite is recovered and crystallised for potential sale as fertiliser.

The process plant has been designed to process 4.34Ā Mt/a of ROM ore at 1.07% Ni. Of this total feed, 2.34Ā Mt/a is rejected as coarse, low grade siliceous waste from the beneficiation plant. The 2 Mt/a beneficiated product at 1.85% Ni grade is then fed to the HPAL processing plant as upgraded feed (1Ā Mt/a per train). A common refining circuit treats the MSP produced from each train via POX, CoSX and crystallization.

The proposed process plant has been designed to recover 94.4% and 94.9% of the nickel and cobalt from the HPAL feed at an acid consumption of 347Ā kg/t. The nickel and cobalt sulphate products are of high purity suitable for sale directly into the battery market. The Kieserite by-product is of appropriate quality to be sold to the local fertiliser market.

Extensive metallurgical testwork and process design was undertaken on the Project by the former owner, Vale, at scoping, prefeasibility and feasibility stages, included drilling and pitting programs totalling 152,000Ā m, variability batch testwork, full-scale pilot testwork and detailed engineering studies. A five-year, exhaustive, metallurgical testwork and pilot plant program demonstrated that a high degree of mined ore upgradable using a simple beneficiation processes was possible. The resultant feed delivered 96% average leach extraction for nickel and cobalt via HPAL technology.

Additional testwork has been completed by the current Project owner, HZM, during 2018 and 2019. This testwork on selected samples from Vermelho validated the potential to produce high-grade sulphate products using the HPAL process.

The 6,000 plus samples totalling over 160t used for PFS and Final Feasibility Study (FFS) piloting were large diameter drill core and were representative (geographically, of depth, ore type and by lithology). Additionally, 10% of the samples (1Ā m from every 10Ā m) was used for variability testing so piloting and variability were related.

Ā 

The processing plant consists of the following main process unit operations:

Ā·; Beneficiation

Ā·; HPAL

Ā·; Slurry neutralization and residue filtration

Ā·; MSP

Ā·; POX

Ā·; Impurity removal

Ā·; CoSX

Ā·; Nickel sulphate crystallization

Ā·; Cobalt sulphate crystallization

Ā·; Acid liquor neutralization

Ā·; Kieserite crystallization

Ā·; Sulphuric acid plant

Ā·; Reagents and utilities.

Financial Evaluation

Capital Cost

Ā 

The estimate is based on the AACE class 4 standard, with an estimated accuracy range between -25% and +20% of the final project cost (excluding contingency).

Ā 

The largest capital item is the HPAL plant. In order to manage initial capital, this is constructed in two phases. The first phase (Stage 1) has a capacity of 1 Mt/a autoclave feed. Stage 2 is brought online in year 3 of production and effectively doubles the HPAL feed rate to 2 Mt/a.

Ā 

TheĀ capex estimateĀ includesĀ allĀ theĀ directĀ andĀ indirectĀ costs,Ā localĀ taxesĀ andĀ duties and appropriate contingencies for the facilities required to bring the Project into production, includingĀ theĀ processĀ plant,Ā powerĀ line,Ā waterĀ pipelinesĀ andĀ associatedĀ infrastructureĀ asĀ defined byĀ the PFS.Ā TheĀ estimateĀ isĀ basedĀ onĀ anĀ EngineeringĀ ProcurementĀ andĀ ConstructionĀ Management ('EPCM')Ā implementationĀ approachĀ andĀ the is the contracting strategy expected to be utilised for the Project.

Ā 

TheĀ totalĀ estimatedĀ initialĀ (pre-production)Ā capex forĀ theĀ projectĀ isĀ US$652.2Ā millionĀ (after tax,Ā includingĀ contingency,Ā excluding growth and escalation).Ā AĀ summaryĀ ofĀ theĀ capexĀ isĀ shown in TableĀ 4.

Ā 

Table 4: Summary of capex

Ā 

Capital cost component

Initial

(US$ M)

Train 2 (year 3)

(US$ M)

Remainder

(US$ M)

LOM (US$ M)

Process plant

575.06

446.68

Ā 

Ā 1,022

Mining pre-production

10.78

-

Ā 

Ā 10.78

Tailings and sediment

24.12

-

Ā 

Ā 24.12

Pumping

2.34

-

Ā 

Ā 2.34

Powerline

14.16

-

Ā 

Ā 14.16

Road

2.59

-

Ā 

Ā 2.59

Permitting and land acquisition

23.19

-

Ā 

Ā 23.19

Mining sustaining

-

-

21.58

Ā 21.58

Other sustaining (including land permitting and land)

-

-

1.33

Ā 1.33

Closure

-

-

29.37

Ā 29.37

TOTAL

652.24

446.68

52.28

Ā 1,151

Ā 

Ā 

TheĀ costsĀ inĀ TableĀ 4Ā include all direct and indirect costs including owner costs, supply,Ā shippingĀ andĀ siteĀ installation.Ā TheĀ totalĀ contingency carried in the capex is US$97.7 million, thisĀ representsĀ 18%Ā of the initialĀ capexĀ (excludingĀ contingency) and 25% of the plant direct costs.

Ā 

Operational costs

Ā 

The operating costs shown in Table 5 (below) represent the average over the LOM; actual costs for these vary from year-to-year depending on the fixed and variable costs as well as sustaining capital requirement for the given year. TheĀ operatingĀ costsĀ coverĀ theĀ mine,Ā processĀ plant,Ā ore preparation,Ā socialĀ andĀ environmental,Ā royaltiesĀ andĀ generalĀ andĀ administrativeĀ costs.Ā The mainĀ contributorsĀ ofĀ theĀ overallĀ operatingĀ costsĀ areĀ power,Ā sulphur, (for acid and power production)Ā labourĀ andĀ miningĀ costs,Ā with additionalĀ consumablesĀ andĀ otherĀ indirectĀ costs,Ā includingĀ G&A.

Ā 

Ā 

Table 5: Summary of opex

Area

LOM total (US$ M)

US$/t nickel**

US$/t ore

Average annual (US$ M)

Mining

Ā 981

Ā 1,062

Ā 6.94

Ā 25.81

Rejects and tails handling

Ā 414

Ā 448

Ā 2.93

Ā 10.89

Processing costs

Ā 5,785

Ā 6,261

Ā 40.93

Ā 152.23

Royalties (CFEM)

Ā 23

Ā 25

Ā 0.16

Ā 0.60

Royalty (Vale)

Ā 66

Ā 72

Ā 0.47

Ā 1.74

G&A and other costs

Ā 215

Ā 233

Ā 1.52

Ā 5.67

SHE

Ā 24

Ā 26

Ā 0.17

Ā 0.63

TOTAL

Ā 7,508

Ā 8,126

Ā 53.13

Ā 197.57

Ā 

Ā 

Note: ** US$2,000/t premium for battery sulphate production has been added to Nickel revenue, US$34,000/t for the cobalt produced as cobalt sulphate, and a net revenue of US$100/t of the by-product, kieserite.

Summary Economics

Ā 

TheĀ financialĀ model based on 100%Ā equity.Ā TheĀ BaseĀ CaseĀ wasĀ developedĀ usingĀ aĀ flat nickelĀ priceĀ ofĀ US$16,400/t Ni for LOM. The second case was prepared; using the Wood Mackenzie long term price of US$19,800/t Ni.

Ā 

The revenue breakdown by product is shown in Table 6.

Ā 

Table 6 LOM Revenue by product

Revenue by product

LOM Revenue (US $M)**

% of total

Ni Sulphate

17,001

89%

Co Sulphate

1,585

8%

Kieserite

448

2%

Ā 

19,034

100%

Note: ** A US$2,000/t Ni premium for battery sulphate production has been added to Nickel revenue, US$34,000/t for the cobalt produced as cobalt sulphate, and a net revenue of US$100/t of the by-product, kieserite

Ā 

Ā 

AsĀ shownĀ inĀ TableĀ 1,Ā theĀ postĀ taxationĀ modelĀ forĀ theĀ BaseĀ CaseĀ hasĀ aĀ 4.6-yearĀ payback periodĀ withĀ cumulativeĀ grossĀ revenuesĀ ofĀ US$19,034Ā million.Ā TheĀ economicĀ analysisĀ indicatesĀ a post-taxĀ NPVĀ ofĀ US$1,722millionĀ andĀ anĀ IRRĀ ofĀ 26.3%Ā usingĀ theĀ BaseĀ CaseĀ ofĀ US$16,400/t Ni. These figures increaseĀ toĀ US$2,373Ā millionĀ andĀ 31.5%Ā whenĀ usingĀ the Wood Mackenzie long term priceĀ ofĀ US$19,800/tĀ Ni.Ā TableĀ 7Ā showsĀ theĀ pre-taxationĀ results.

Ā 

Table 7: Project economic performance (pre-taxation)

Ā 

Item

Unit

Nickel price basis (US$/t Ni)**

Ā 

Ā 

Base Case (consensus) 16,400

WM Long Term 19,800

Net cash flow

US$ million

10,379

13,509

NPV8

US$ million

2,342

3,185

IRR

%

28.8%

34.5%

Breakeven (NPV8) Ni price

US$/t

6,946

6,946

C1 Cost (Brooke Hunt)

US$/t

8,029

8,029

Production year payback

Years

4.0

3.5

Cash costs

US$ million

7,508

7,520

Operating cash flow

US$ million

11,526

14,655

Note: ** US$2,000/t premium for battery sulphate production has been added to Nickel revenue, US$34,000/t for the cobalt produced as cobalt sulphate, and a net revenue of US$100/t of the by-product, kieserite.

Ā 

Sensitivity Analysis

TheĀ sensitivityĀ analysisĀ demonstratesĀ howĀ theĀ NPV8Ā isĀ affectedĀ byĀ changesĀ toĀ oneĀ variableĀ while holdingĀ theĀ otherĀ variablesĀ constant.Ā TheĀ resultsĀ ofĀ theĀ sensitivityĀ analysisĀ areĀ presentedĀ inĀ Table 8 and Figure 1.

Ā 

Table 8: Sensitivity table for the Base Case (US$16,400/t) NPV8, after taxation

Sensitivity parameter

-30%

-20%

-10%

0%

10%

20%

30%

Price/Grade/Recovery of Ni

Ā 661

Ā 1,016

Ā 1,369

Ā 1,722

Ā 2,074

Ā 2,427

Ā 2,779

Price/Grade/Recovery of Co

Ā 1,617

Ā 1,652

Ā 1,687

Ā 1,722

Ā 1,757

Ā 1,792

Ā 1,827

Net revenue from Kieserite

Ā 1,693

Ā 1,703

Ā 1,712

Ā 1,722

Ā 1,731

Ā 1,741

Ā 1,751

Pre-Production Capital

Ā 1,873

Ā 1,823

Ā 1,772

Ā 1,722

Ā 1,671

Ā 1,621

Ā 1,570

Stage 2 Capital

Ā 1,802

Ā 1,775

Ā 1,749

Ā 1,722

Ā 1,695

Ā 1,668

Ā 1,642

Mining Cost

Ā 1,799

Ā 1,773

Ā 1,748

Ā 1,722

Ā 1,696

Ā 1,670

Ā 1,645

Fx rate

Ā 1,535

Ā 1,613

Ā 1,674

Ā 1,722

Ā 1,761

Ā 1,794

Ā 1,821

Sulphur Price

Ā 1,911

Ā 1,848

Ā 1,785

Ā 1,722

Ā 1,659

Ā 1,596

Ā 1,532

Power cost

Ā 1,735

Ā 1,730

Ā 1,726

Ā 1,722

Ā 1,718

Ā 1,713

Ā 1,709

Discount rate

Ā 2,523

Ā 2,217

Ā 1,952

Ā 1,722

Ā 1,521

Ā 1,345

Ā 1,189

Beneficiation efficacy

Ā 1,298

Ā 1,439

Ā 1,581

Ā 1,722

Ā 1,863

Ā 2,004

Ā 2,146

Ā 

Ā 

Figure 1: Sensitivity chart

Ā 

Please see image in the full version of the announcement atĀ www.horizonteminerals.com

Ā 

TheĀ sensitivityĀ analysisĀ showsĀ thatĀ theĀ ProjectĀ isĀ moreĀ sensitiveĀ toĀ nickelĀ price,Ā nickelĀ recovery andĀ gradeĀ thanĀ itĀ isĀ toĀ eitherĀ opexĀ orĀ capex.

Ā 

Ā 

Section 5 - Market Review and Nickel Pricing

Ā 

In June 2019, HZM commissioned Wood Mackenzie to develop a report on the market for nickel sulphate. As consequence of that report the following assumptions with respect to commodity pricing were used in the PFS.

Ā·; The consensus nickel price of US$16,400/t (US$7.44/lb) was used in the Base Case for the PFS along with a US$2,000/t (US$0.91/lb) nickel sulphate product premium. The nickel sulphate premium is driven by the battery market (where nickel sulphate is valued higher than class 1 nickel) and is supported by very strong growth in the EV car market. The US$2,000/t (US$0.91/lb) sulphate premium is the average value realised in the market over the last 12 months. The Wood Mackenzie long-term price currently stands at approximately US$19,800/t (US$8.98/lb); this was used as an alternative case for the PFS. A fixed price for nickel was applied over the LOM. The Qualified Person has reviewed the above and consider that the results support the assumptions in this Technical Report.

Ā·; The cobalt price assumption of US$34,000/t (US$15.43/lb) used in this study is significantly below the long-term consensus bank/broker forecasts which stand at US$55,000/t (US$25/lb).

Kieserite

In July 2019, HZM commissioned a report on the market for kieserite in Brazil from Dr Fabio Vale (Director TƩcnico/Technical Manager) of Adubai Consultoria AgronƓmica (Adubai).

The study concludes that:

The fertilizer market in Brazil is large. In 2018, 35.6Ā Mt of fertilizer was sold, of this 77.5% was imported and 22.5% was manufactured locally. The most likely consumers of the kieserite produced at the Project are the palm oil growers in ParĆ” state, as palm oil trees have a very high demand for both magnesium and sulphur, although it has been demonstrated that coffee and cotton would also benefit from kieserite. The location of the Vermelho plant in the centre of the ParĆ” state gives its distribution a competitive advantage over the imported product. The Project will produce approximately 150,000Ā t of kieserite a year, which is 10 times the current market for imported kieserite. This means there would be oversupply which would be expected to dictate a lower realised price then the current market, and substitution of other agro-products would be required for all Project kieserite to be consumed in the local market. This suggest that it would be unlikely for current prices (approximately US$380/t FOB Barcarena) to be realised. For the study, HZM has assumed a kieserite price of US$180/t (delivered) - about half of the current price in Barcarena. The study assumes a cost of US$80/t for delivery and marketing of Keiserite.

Ā 

Ā 

Community, Environment and Permitting

Ā 

The Project is located 3km from the town of Canaã dos CarajÔs, founded in 1994, which forms the southern limit of the CarajÔs Mining District (CMD) ParÔ state, north of Brazil. The CMD is host to a number of tier 1 iron, nickel and copper mines operated by Vale.

Mining and related industries in the CMD play a vital role in the socio-economic fabric of the region, with the municipality presenting considerable per capita income, the second highest of the ParĆ” state.

In 2004, Vale started to operate the Sossego Copper Mine after several infrastructure municipality improvements, and most recently (2017) ramped-up the S11D project, one of the largest standalone iron operations in the world. As a result of the advances of mining in the region, there has been a significant influx of people and investment, which has in turn promoted changes and improvements in the areas of economic growth, cultural diversity and a more developed economy than nearby towns, heavily centred around mining related activities.

Key environmental studies for the advancement of project licensing stages were completed by Vale. HZM will utilize the studies and baseline data collected by previous owners to inform and expedite new EIA RIMA studies.

The following mining and environmental permits were granted to Vale by the end of 2016:

Ā·; EIA/RIMA studies (Environmental Impact Study ('EIS') and Environmental Impact Report ('EIR')) issued

Ā·; Award of Preliminary Licence ('LP')

Ā·; Environmental Controls Plan issued

Ā·; Application for Installation Licence ('LI')

Ā·; Final Exploration Report approved

Ā·; Mine Plan (Plano de Aproveitamento Economico - PAE) approved

Whilst a new permit pathway is proposed, the previously awarded permits for Vermelho provide a solid basis from which to progress the project permittingĀ 

HZM will utilize the Vale studies and baseline data collected to inform and expedite new EIA RIMA studies. As HZM will recommence the licensing for Vermelho, the Company will both update studies and undertake new studies to accurately characterize the current physical environment, biological environment and social settings.

Ā 

Next Steps

The PFS demonstrates that the Project is technically, economically viable, and is expected to obtain all the regulatory and permitting requirements. Consequently, the Project should progress to a Feasibility Stage.

Ā 

Report Filing

Ā 

AĀ technicalĀ reportĀ onĀ this PFS,Ā preparedĀ inĀ accordanceĀ withĀ theĀ NIĀ 43-101Ā reportingĀ Ā requirements, willĀ beĀ filedĀ onĀ SEDARĀ atĀ www.sedar.com andĀ atĀ www.horizonteminerals.com withinĀ forty-five (45) days of the date of this news release.

Ā 

Qualified Persons

Mr Anthony Finch, P Eng. (APEGBC), B.Eng, B Econ, MAusIMM (CP Mining), Independent Consultant;

MrĀ AndrewĀ Ross,Ā BScĀ (Hons),Ā MSc,Ā FAusIMM,Ā PrincipalĀ Consultant,Ā SnowdenĀ MiningĀ Industry Consultants PtyĀ Ltd;

Simon Walsh, BSc (Extractive Metallurgy and Chemistry), MBA, MAusIMM (CP), GAICD, Principal Metallurgist, Simulus (Engineers & Laboratories) Pty ltd;

are the Qualified Persons under NI 43-101, and have reviewed, approved and verified the technicalĀ contentĀ ofĀ thisĀ pressĀ release,Ā relatedĀ toĀ theirĀ areaĀ ofĀ expertise.

Ā 

For further information visit www.horizonteminerals.com or contact:

Ā 

Ā 

Horizonte Minerals plc

Ā 

Jeremy Martin (CEO)

+44 (0) 203 356 2901

Numis Securities Ltd (NOMAD & Joint Broker)

John Prior

Paul Gillam

+44 (0) 207 260 1000

Shard Capital (Joint Broker)

Ā 

Damon Heath Erik Woolgar

+44 (0) 20 186 9952

Tavistock (Financial PR)

Ā 

Gareth Tredway

Annabel de Morgan

+44 (0) 207 920 3150

Ā 

About Horizonte Minerals:

HorizonteĀ MineralsĀ plcĀ isĀ anĀ AIMĀ andĀ TSX-listedĀ nickelĀ developmentĀ companyĀ focusedĀ inĀ Brazil. TheĀ CompanyĀ isĀ developingĀ theĀ AraguaiaĀ project,Ā asĀ theĀ nextĀ majorĀ ferronickelĀ mineĀ inĀ Brazil,Ā and theĀ VermelhoĀ nickel-cobaltĀ project,Ā withĀ theĀ aimĀ ofĀ beingĀ ableĀ toĀ supplyĀ nickelĀ andĀ cobaltĀ toĀ the EVĀ batteryĀ market.Ā BothĀ projectsĀ areĀ 100%Ā owned.

Horizonte shareholders include: Teck Resources Limited, Canaccord Genuity Group, JP Morgan, Lombard Odier Asset Management (Europe) Limited, City Financial, Richard Griffiths and Glencore.

Ā 

Glossary of technical terms

Ā 

AACE

Association for the Advancement of Cost Engineering

AACE Class 4

+-20% +25% accuracy

C1

C1 cash cost as defined by Brook Hunt

Capex

Capital cost

Co

Cobalt

Cut-off grade

Lowest grade of mineralisation material considered economic, used in the calculation of ore resources

Dilution

Waste or low-grade material accidently mined with the ore

Ā 

EPC

Engineering Procurement and Construction

EPCM

Engineering Procurement and Construction Management

EV

Electric Vehicles

Fe

Iron

FeNi30

Ferronickel with 30% Nickel and 70% Iron

Ferronickel or FeNi

An alloy that contains approximately 30% nickel and 70% iron and is the produced by the project as an ingot

HZM, Horizonte or the Company

Horizonte Minerals plc

IFC

International Finance Corporation

IRR

Internal Rate of Return

Kt

Thousand Tonnes (metric)

LME

London Metal Exchange

LOM

Life of mine

Loss

Ore that is unintentionally left behind or mined as waste

MgO

Magnesium Oxide

MT

Million Tonnes (metric)

Ni

Nickel

NPV8

Net present value at an 8% discount rate

Opex

Operating cost

Ore

A naturally occurring solid material from which a metal or valuable mineral can be extracted profitably

PEA

Preliminary Economic Assessment

Reverse Circulation Drilling

A rock drilling system that circulates drill cuttings through the centre of the drill rod so that they can be collected and assayed without contamination

RKEF

Rotating Kiln Electric Furnace is the process by which nickel laterite ore is reduced and then melted in so that metal is separated from the slag to produce ferronickel

ROM

Run of mine stockpile

Shotted

Formation of small pellets from molten material

SiO2

Silicon Dioxide

Tpa

Tonnes (metric) per annum

US$

United States Dollar

WM

Wood Mackenzie

Ā 

Ā 

Ā 

Ā 

Mineral Reserves

Mineral Reserves are sub-divided into 2 categories. The highest level of Reserves or the level with the most confidence is the `Proven' category and the lower level of confidence of the Reserves is the `Probable' category. Reserves are distinguished from resources as all of the technical and economic parameters have been applied and the estimated grade and tonnage of the resources should closely approximate the actual results of mining. The guidelines state "Mineral Reserves are inclusive of the diluting material that will be mined in conjunction with the Mineral Reserve and delivered to the treatment plant or equivalent facility." The guidelines also state that, "The term `Mineral Reserve' need not necessarily signify that extraction facilities are in place or operative or that all government approvals have been received. It does signify that there are reasonable expectations of such approvals.

Ā 

Ā 

Proven Mineral Reserves

A `Proven Mineral Reserve' is the economically mineable part of a Measured Mineral Resource demonstrated by at least a Preliminary Feasibility Study. This study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction is justified.

Ā 

Ā 

Probable Mineral Reserves

A `Probable Mineral Reserve' is the economically mineable part of an Indicated and in some circumstances a Measured Mineral Resource demonstrated by a least a Preliminary Feasibility Study. This study must include adequate information on mining, processing, metallurgical, economic, and other relevant factors that demonstrate, at the time of reporting, that economic extraction can be justified.

Ā 

Ā 

Mineral Resources

Mineral Resources are sub-divided into 3 categories depending on the geological confidence. The highest level with the most confidence is the `Measured' category. The next level of confidence is the `Indicated' category and the lowest level, or the resource with the least

confidence, is the `Inferred' category.

Ā 

Ā 

Ā 

Ā 

Ā 

Indicated Mineral Resource

An `Indicated Mineral Resource' is that part of a Mineral Resource for which quantity, grade or quality, densities, shape and physical characteristics, can be estimated with a level of confidence sufficient to allow the appropriate application of technical and economic parameters, to support mine planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough for geological and grade continuity to be reasonably assumed.

Ā 

Ā 

Ā 

Ā 

Measured Mineral Resource

A `Measured Mineral Resource' is that part of a Mineral resource for which quantity, grade or quality, densities, shape and physical characteristics are so well established that they can be estimated with confidence sufficient to allow the appropriate application of technical and economic parameters, to support production planning and evaluation of the economic viability of the deposit. The estimate is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes that are spaced closely enough to confirm both geological and grade continuity.

Ā 

Ā 

Inferred Mineral Resource

An `Inferred Mineral Resource' is that part of a Mineral Resource for which quantity and grade or quality can be estimated on the basis of geological evidence and limited sampling and reasonably assumed, but not verified, geological and grade continuity. The estimate is based on limited information and sampling, gathered through appropriate techniques from

locations such as outcrops, trenches, pits, workings and drill holes.

Ā 

CAUTIONARY STATEMENT REGARDING FORWARD LOOKING INFORMATION

Ā 

Except for statements of historical fact relating to the Company, certain information contained in this press release constitutes "forward-lookingĀ information"Ā underĀ CanadianĀ securitiesĀ legislation.Ā Forward-lookingĀ informationĀ includes,Ā butĀ isĀ notĀ limitedĀ to,Ā statementsĀ withĀ respectĀ toĀ theĀ potentialĀ ofĀ theĀ Company's currentĀ orĀ futureĀ propertyĀ mineralĀ projects;Ā theĀ successĀ ofĀ explorationĀ andĀ miningĀ activities;Ā costĀ andĀ timingĀ ofĀ futureĀ exploration, productionĀ andĀ development;Ā theĀ estimationĀ ofĀ mineralĀ resourcesĀ andĀ reservesĀ andĀ theĀ abilityĀ ofĀ theĀ CompanyĀ toĀ achieveĀ itsĀ goalsĀ in respectĀ ofĀ growingĀ itsĀ mineralĀ resources;Ā theĀ abilityĀ ofĀ theĀ CompanyĀ toĀ obtain the required capital to construct Ā and operated the Company's projects andĀ theĀ realization ofĀ mineralĀ resourceĀ andĀ reserveĀ estimates.Ā Generally,Ā forward-lookingĀ informationĀ canĀ beĀ identifiedĀ byĀ theĀ useĀ ofĀ forward-looking terminologyĀ suchĀ asĀ "plans",Ā "expects"Ā orĀ "doesĀ notĀ expect",Ā "isĀ expected",Ā "budget",Ā "scheduled",Ā "estimates",Ā "forecasts",Ā "intends", "anticipates"Ā orĀ "doesĀ notĀ anticipate",Ā orĀ "believes",Ā orĀ variationsĀ ofĀ suchĀ wordsĀ andĀ phrasesĀ orĀ statementsĀ thatĀ certainĀ actions,Ā events orĀ resultsĀ "may",Ā "could",Ā "would",Ā "might"Ā orĀ "willĀ beĀ taken",Ā "occur"Ā orĀ "beĀ achieved".Ā Forward-lookingĀ informationĀ isĀ basedĀ onĀ the reasonableĀ assumptions,Ā estimates,Ā analysisĀ andĀ opinionsĀ ofĀ managementĀ madeĀ inĀ lightĀ ofĀ itsĀ experienceĀ andĀ itsĀ perceptionĀ ofĀ trends, currentĀ conditionsĀ andĀ expectedĀ developments,Ā asĀ wellĀ asĀ otherĀ factorsĀ thatĀ managementĀ believesĀ toĀ beĀ relevantĀ andĀ reasonableĀ in theĀ circumstancesĀ atĀ theĀ dateĀ thatĀ suchĀ statementsĀ areĀ made,Ā andĀ areĀ inherentlyĀ subjectĀ toĀ knownĀ andĀ unknownĀ risks,Ā uncertainties andĀ otherĀ factorsĀ thatĀ mayĀ causeĀ theĀ actualĀ results,Ā levelĀ ofĀ activity,Ā performanceĀ orĀ achievementsĀ ofĀ theĀ CompanyĀ toĀ beĀ materially different from those expressed or implied by such forward-looking information, including but not limited to risks related to:Ā explorationĀ andĀ miningĀ risks,Ā competitionĀ fromĀ competitors withĀ greaterĀ capital;Ā theĀ Company'sĀ lackĀ ofĀ experienceĀ withĀ respectĀ toĀ development-stageĀ miningĀ operations;Ā fluctuationsĀ inĀ metal prices;Ā uninsuredĀ risks;Ā environmentalĀ andĀ otherĀ regulatoryĀ requirements;Ā exploration,Ā miningĀ andĀ otherĀ licences;Ā theĀ Company's futureĀ paymentĀ obligations;Ā potentialĀ disputesĀ withĀ respectĀ toĀ theĀ Company'sĀ titleĀ to,Ā andĀ theĀ areaĀ of,Ā itsĀ miningĀ concessions;Ā the Company'sĀ dependenceĀ onĀ itsĀ abilityĀ toĀ obtainĀ sufficientĀ financingĀ inĀ theĀ future;Ā theĀ Company'sĀ dependenceĀ onĀ itsĀ relationshipsĀ with thirdĀ parties;Ā theĀ Company'sĀ jointĀ ventures;Ā theĀ potentialĀ ofĀ currencyĀ fluctuationsĀ andĀ politicalĀ orĀ economicĀ instabilityĀ inĀ countriesĀ in whichĀ theĀ CompanyĀ operates;Ā currencyĀ exchangeĀ fluctuations;Ā theĀ Company'sĀ abilityĀ toĀ manageĀ itsĀ growthĀ effectively;Ā theĀ trading marketĀ forĀ theĀ ordinaryĀ sharesĀ ofĀ theĀ Company;Ā uncertaintyĀ withĀ respectĀ toĀ theĀ Company'sĀ plansĀ toĀ continueĀ toĀ developĀ itsĀ operations andĀ newĀ projects;Ā theĀ Company'sĀ dependenceĀ onĀ keyĀ personnel;Ā possibleĀ conflictsĀ ofĀ interestĀ ofĀ directorsĀ andĀ officersĀ ofĀ theĀ CompanyĀ andĀ variousĀ risksĀ associatedĀ withĀ theĀ legalĀ and regulatory framework within which the Company operates. Although management of the Company has attempted to identify importantĀ factorsĀ thatĀ couldĀ causeĀ actualĀ resultsĀ toĀ differĀ materiallyĀ fromĀ thoseĀ containedĀ inĀ forward-lookingĀ information,Ā thereĀ may beĀ otherĀ factorsĀ thatĀ causeĀ resultsĀ notĀ toĀ beĀ asĀ anticipated,Ā estimatedĀ orĀ intended.Ā ThereĀ canĀ beĀ noĀ assuranceĀ thatĀ suchĀ statements willĀ proveĀ toĀ beĀ accurate,Ā asĀ actualĀ resultsĀ andĀ futureĀ eventsĀ couldĀ differĀ materiallyĀ fromĀ thoseĀ anticipatedĀ inĀ suchĀ statements.

Ā 

[1]USD/BRL 1/3.8 exchange rate applied forĀ life-of-mine

[2] NPVĀ calculatedĀ usingĀ 8%Ā discountĀ rate

Ā 

Ā 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
Ā 
END
Ā 
Ā 
UPDGGGMUUUPBGMQ
Date   Source Headline
27th Jul 20107:30 amRNSRestoration - Horizonte Minerals plc
15th Jul 20109:30 amRNSStatement re. Suspension
15th Jul 20107:55 amRNSSuspension - Horizonte Minerals plc
29th Jun 20105:05 pmRNSResult of AGM
7th Jun 20102:45 pmRNSPosting of Report and Accounts
4th Jun 20107:00 amRNSFinal Results
19th May 20107:00 amRNSAngloGold exploration alliance update - Brazil
11th Feb 20107:00 amRNSExploration Update
9th Dec 20097:00 amRNSNew Nickel Project - Brazil
26th Nov 20097:00 amRNSLontra Nickel Project Update - Brazil
19th Oct 20091:45 pmRNSChange of Registered Office
1st Oct 20097:00 amRNSTotal Voting Rights and Share Capital
25th Sep 20095:01 pmRNSHolding(s) in Company
25th Sep 20097:00 amRNSNew Option Scheme
15th Sep 200911:45 amRNSRaises GBP1.3 million
11th Sep 20094:45 pmRNSHolding(s) in Company
7th Sep 20097:00 amRNSInterim Results
4th Sep 20097:00 amRNSUSD 5.3million E&D Alliance - AngloGold Ashanti
28th Jul 20097:00 amRNSTangara Project - Troy Resources JV Update
29th May 20095:04 pmRNSHolding(s) in Company
29th May 20097:00 amRNSAGM Statement
23rd Apr 20097:00 amRNSFinal Results
7th Apr 20097:00 amRNSSecures R$1,000,000 for Project Development JV
19th Mar 20097:00 amRNSLontra Nickel Laterite Project Update
19th Feb 20097:00 amRNSChange of Adviser and Broker
29th Jan 20097:00 amRNSUpdate on Troy JV
2nd Dec 20087:00 amRNSHigh grade gold and silver results - Peru
24th Nov 20087:00 amRNSBrazil Exploration Update
23rd Sep 20087:00 amRNSInterim Results
8th Sep 20087:00 amRNSMajor Nickel Discovery in Bra
26th Aug 20083:52 pmRNSHolding(s) in Company
22nd Jul 20087:00 amRNSAgreement with Barrick for Pe
3rd Jun 20089:00 amRNSAGM Statement
14th May 20087:00 amRNSPositive Nickel Grades at Lon
29th Apr 20087:01 amRNSFinal Results
22nd Apr 20087:00 amRNSUpgrades Lontra Ni Project
3rd Apr 20089:01 amRNSNew Appointments
17th Mar 20087:01 amRNSEl Aguila Drilling Results
11th Mar 200812:52 pmRNSUpdate to Shareholders
3rd Mar 20087:00 amRNSChange of Adviser
11th Feb 20087:01 amRNSUpdate - Brazilian Ni Project
29th Jan 20081:32 pmRNSGrant of Options
6th Dec 20077:01 amRNSAgreement with Troy Resources
13th Nov 20077:01 amRNSNickel Project Update
18th Oct 20077:01 amRNSLetter to Shareholders
8th Oct 20077:00 amRNSFarms-out Brazil gold project
25th Sep 20078:30 amRNSBrazilian Gold Project Update
5th Sep 20078:00 amRNSInterim Results
3rd Sep 200712:37 pmRNSTotal Voting Rights
17th Aug 200710:37 amRNSAIM Rule 26

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.