Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMC.L Regulatory News (AMC)

  • There is currently no data for AMC

Resource Increase 140%

19 Nov 2007 07:00

Amur Minerals Corporation19 November 2007 Amur Minerals Corporation ("Amur" or "the Company") Maly Krumkon Resource Increased by 140% Amur Minerals Corporation (AIM: AMC), an exploration and development companyfocused on East Russia, announces the results of its resource update for theMaly Krumkon deposit located on its Kun-Manie nickel copper licence in easternRussia. Using the 2007 drill results, SRK Consulting has estimated the MalyKrumkon deposit to be substantially larger, in terms of both total tonnes of oreand tonnes of contained nickel and copper, than was reported at year end 2006. Highlights: • The infill and step out drilling has defined a total of 26.3 million tonnes of ore within the combined resource classes of Indicated and Inferred, as defined by the JORC Code. This represents an increase of some 140% over last year's resource estimate for the Maly Krumkon deposit; • The total estimated contained nickel and copper has been increased to 136,500 tonnes and 37,700 tonnes respectively. This represents an increase of some 170% for nickel and 150% for copper compared to that previously reported; • The average nickel grade has been increased to 0.52%, up from 0.45% in last year's estimate; and • Some 15.0 million tonnes of the updated resource estimate, with mean grades of 0.49% nickel and 0.13% copper, and containing 73,800 tonnes of nickel and 15,000 tonnes of copper respectively, has been reported by SRK Consulting as an Indicated Mineral Resource, as defined by the JORC Code, and the remainder as an Inferred Mineral Resource. The updated newly expanded resource estimate for Maly Krumkon is presentedbelow. Maly Krumkon Updated JORC Resource Estimate - November 2007 Resource Tonnage Ni Ni Cu Cu Category (Mt) (%) (t) (%) (t) Indicated 15.0 0.49 73,700 0.13 19,900 Inferred 11.2 0.56 62,800 0.16 17,800Total Maly Krumkon Resource 26.2 0.52 136,500 0.14 37,700 Global Resource - All Deposits Total Measured 3.7 0.61 22,700 0.16 5,800 Total Indicated 47.7 0.48 226,800 0.13 64,400 Total Inferred 17.1 0.54 91,500 0.15 25,300 Grand Total 68.5 0.50 341,000 0.14 95,500 Robin Young, Amur's Chief Executive Officer, commented: "The latest drilling has added 34% more nickel to our total resource base. Inaddition, we have significant potential copper, cobalt, platinum and palladiumcredits which we do not report." "What is even more encouraging than these excellent results is the expansionpotential. Positive geophysical results indicate we have at least another fourkilometres of ground to the east which we need to drill. As well as thisadditional potential along strike, we also have the upside of extending theresource down dip. I believe we are just seeing the tip of what is a much largerresource at Maly Krumkon." The information contained in this announcement has been reviewed and approved bythe CEO of Amur, Robin Young. Mr. Young is a Geological Engineer (cum laude) andis a Qualified Professional Geologist, as defined by the Toronto and VancouverStock Exchanges. 19 November 2007 Enquiries: Company Co-Broker Nomad and Public Relations Co-BrokerAmur Minerals Fox-Davies Capital RBC Capital BanksideCorp. Limited MarketsRobin Young Daniel Fox-Davies Andrew Smith Michael PadleyCEO Martin Eales +44 (0)7981 +44 (0) 20 7936 +44 (0) 20 7029 +44 (0) 20 7367126 818 5200 7881 8881 Notes to Editors Kun-Manie Drill Resource Update The 2007 exploration drill programme on the Maly Krumkon deposit was designedfor resource expansion by in fill and step out drilling. This deposit is one ofthree from which drilled resources are being reported while four green fieldtargets remain to be drilled. The Maly Krumkon structure has been mapped and identified using a modifiedground based IP geophysical survey. The IP results indicate that the structuremay exist over a total length of approximately five kilometres of which only 700metres has been drilled. Drilling is required to confirm the potential presenceof economic mineralisation projected to exist to the east of the currentlydefined resource. Within the drilled area, the average true thickness is estimated to be about 30metres. Using 14 drill holes and four trenches for which analytical results wereavailable, SRK Consulting constructed a wire frame model of the zone using anickel only cut off grade of 0.10%. Resource grades were estimated for nickel,copper, and cobalt using the Ordinary Kriging method. The resource has beencompiled in accordance with JORC reporting standards. Based on the Maly Krumkon results alone, the newly updated resource within thelicence has been increased of approximately 29% in tonnage, 34% in containedtonnes of nickel and 31% in contained tonnes of copper. Pt, Pd and Co are notreported at this time. Updated Global JORC Mineral Resource Estimate - November 2007 Orebody Tonnage Ni Ni Cu Cu ------------------------------------------------------------------------------- (Mt) (%) (t) (%) (t) ----------------------------------------------------------------- Vodorazdelny ----------------------------------------------------------------- Indicated 5.9 0.71 41,800 0.20 11,800 ------------------------------------------------------------------------------- Ikenskoe ----------------------------------------------------------------- Measured 3.7 0.61 22,700 0.16 5,800 ------------------------------------------------------------------------------- Indicated 26.8 0.42 111,300 0.12 32,700 ------------------------------------------------------------------------------- Sub-total 30.5 0.44 134,000 0.13 38,500 ------------------------------------------------------------------------------- Inferred 5.9 0.49 28,700 0.13 7,500 -------------------------------------------------------------------------------Total Ikenskoe 36.4 0.45 162,700 0.13 46,000 ------------------------------------------------------------------------------- Maly Krumkon ----------------------------------------------------------------- Indicated 15.0 0.49 73,700 0.13 19,900 ------------------------------------------------------------------------------- Inferred 11.2 0.56 62,800 0.16 17,800 ------------------------------------------------------------------------------- Total Resource -------------------------------------------------------------------------------Total Measured 3.7 0.61 22,700 0.16 5,800 -------------------------------------------------------------------------------Total Indicated 47.7 0.48 226,800 0.13 64,400 -------------------------------------------------------------------------------Total Inferred 17.1 0.54 91,500 0.15 25,300 ------------------------------------------------------------------------------- Grand Total 68.5 0.50 341,000 0.14 95,500 ------------------------------------------------------------------------------- The Vodorazdelny and Ikenskoe tonnages and grades in above table are based ondrilling completed through the 2006 field season. These resource numbers havenot been updated to reflect the drill results of the 2007 field season assubstantial portions of the analytical results are not yet available. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
7th Aug 20204:35 pmRNSPrice Monitoring Extension
4th Aug 20204:37 pmRNSExercise of Warrants and Issue of Equity
21st Jul 20204:41 pmRNSSecond Price Monitoring Extn
21st Jul 20204:36 pmRNSPrice Monitoring Extension
15th Jul 20204:39 pmRNSExercise of Warrants and Issue of Equity
14th Jul 202010:55 amRNSResponse to Price Movement
13th Jul 202012:02 pmRNSPrice Monitoring Extension
6th Jul 20204:40 pmRNSSecond Price Monitoring Extn
6th Jul 20204:36 pmRNSPrice Monitoring Extension
26th Jun 20209:03 amRNSAUDITED FINAL RESULTS YEAR ENDED 31 DECEMBER 2019
24th Jun 20207:00 amRNSBankable Feasibility Study Strategy
19th Jun 202011:34 amRNSExtraordinary General Meeting Results
12th Jun 20203:40 pmRNSPosting of Q&A ahead of EGM
12th Jun 202012:02 pmRNSPrice Monitoring Extension
11th Jun 20207:00 amRNSTEO Update – Indicative Revenue Terms
2nd Jun 20207:00 amRNSNotice of Extraordinary General Meeting
1st Jun 20207:00 amRNSKun-Manie Copper Concentrate Update
27th May 20207:00 amRNSEquity Placing
21st May 20204:40 pmRNSSecond Price Monitoring Extn
21st May 20204:35 pmRNSPrice Monitoring Extension
20th May 20207:00 amRNSDirector Change
4th May 20203:39 pmRNSRepayment of Loan
16th Apr 20204:40 pmRNSSecond Price Monitoring Extn
16th Apr 20204:36 pmRNSPrice Monitoring Extension
16th Apr 20204:25 pmRNSEquity Placing
3rd Apr 202012:31 pmRNSGrant of Options
31st Mar 202012:07 pmRNSSecond Price Monitoring Extn
31st Mar 202012:03 pmRNSPrice Monitoring Extension
30th Mar 20204:41 pmRNSSecond Price Monitoring Extn
30th Mar 20204:36 pmRNSPrice Monitoring Extension
16th Mar 202010:58 amRNSReceipt of Proceeds of Initial Advance
12th Mar 202010:48 amRNSFixed Term Loan Note Instrument to Complete TEO
21st Feb 20207:00 amRNSIssue of Warrants
17th Feb 20207:00 amRNSMetallurgical Results Update
13th Feb 202010:37 amRNSReplacement Advisor to the Board Appointment
13th Feb 20207:00 amRNSAdvisor to the Board Appointment
28th Jan 20207:00 amRNSRock Mechanics Assessment Complete
15th Jan 20207:00 amRNSBase Line Environmental Assessment Complete
31st Dec 20197:00 amRNSPermanent Conditions TEO Update
13th Dec 201910:17 amRNSAnnual General Meeting Results
2nd Dec 20197:00 amRNSIssue of Equity
25th Nov 20198:47 amRNSNotice of Annual General Meeting
20th Nov 20199:22 amRNSInvestor Event
18th Nov 20191:47 pmRNSRepayment of Convertible Loan
13th Nov 20197:00 amRNSResults of shareholder analysis
12th Nov 20197:00 amRNSHydrological Assessment Complete
4th Nov 20197:00 amRNSIssue of Equity
30th Oct 20192:53 pmRNSConversion of Loan and Issue of Equity
30th Sep 20199:53 amRNSInterim Results 2019
23rd Sep 20197:00 amRNSPermanent Conditions TEO Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.