Mining licence23 Jul 2021 21:07
I know some know everything and don't like the cut and paste but the reason for buying the new drill is apparent in them , it gives them more control over what they can do and when and takes the frustration out of the equation saving them time and money.
"Proposed schedule for the exploration program
Historic research: Concurrent with on ground activities.
Field mapping: 2 months initiated as soon as the tenement is granted.
Soil geochemical sampling (if necessary to assist with delineation of the path of the reefs). Concurrent with field mapping.
Interpretation, review & in-house reporting: 1 month following the completion of field mapping.
RC drilling: Following completion of the above steps, the process will commence 3 months after the grant of licence. Depending on target sites, either:
Low Impact Exploration route, drill tendering, 7 day DSDBI notice & drilling as soon as the preferred drill company is available (season dependent, unlikely to drill during winter), OR
If a Standard Work Plan is required, time to drilling will be dictated by the length of the approval process.
Targets outside the initial focus area will be prospected through a similar process (field mapping, soil geochemistry, drilling) concurrent with or following the initial exploration."
https://mercatorgold.com.au/services/south-creswick/