La Parrilla FTM Development Update

29 Sep 2015 11:01

RNS Number : 5387A
W Resources PLC
29 September 2015
 

 

29 September 2015

 

 

 

 

W Resources Plc

("W" or the "Company")

 

 

La Parrilla FTM Development Update

 

W Resources Plc (AIM:WRES), the tungsten, copper and gold mining, exploration, development and production company with assets located in Spain and Portugal, is pleased to provide an update on development work at its La Parrilla Fast Track Mine (FTM) located in Spain.

Strong progress has been made on the La Parrilla FTM and highlights include:

· Completion of 1,302 metres of diamond core drilling and 1,594 metres of grade control reverse circulation drilling in the FTM mining area

· Completion of the first phase of extensive metallurgical pilot testing and equipment testing

· Results to date indicate:

- Potential to reduce both capital and operating expenditures

- Potential for a 200% upgrade in WO3 content before the final concentration stages, which makes the product from La Parrilla comparable to some of the highest grade tungsten deposits globally

· Commencement of initial engineering tie in design

Assay preparation for the 2,900 metre infill and grade control programme is underway and logging results are positive. Assay results will be progressively reported in Q4 2015 and the upgraded JORC compliant mineral resource estimate is on track for issue in the next three to four months. Core and RC chip logging and analysis confirms the coarse grain "nuggetty" characteristics of the La Parrilla mineralisation, which supports low cost processing expectations.

Bulk sampling for the metallurgical programme from within the initial mining blocks has delivered grades of 0.251% for the initial 6 tonne sample. These grades are significantly higher than the design run of mine feed for the La Parrilla FTM development. The work is being conducted in leading test facilities in both Germany and Australia in order to ensure timely procurement of key long lead equipment.

Initial results from the metallurgical pilot programme continue to highlight the coarse grained nature of the ore and ease of separation at coarse sizes. In line with other global tungsten operations, pilot X-Ray ore sorting trials confirm 20% of the run of mine feed can be rejected at 25mm whilst recovering greater than 96% of the WO3. Pilot scale jig testing has confirmed 50% of the mass can be rejected during pre-concentration at 10mm whilst recovering more than 85% of the tungsten. This presents significant upside potential through reduction of both capital and operating expenditures by rejecting 60% of the run of mine feed prior to fine grinding. This provides nearly a 200% upgrade in WO3 content before final concentration stages, which makes La Parrilla project comparable in the high grade of feed to the concentrator to some of the best global tungsten projects.

In parallel to evaluating the base case process flowsheet, testing is underway to simplify the flowsheet even further. The natural brittleness (as distinct from the host rock) of scheelite presents a waste rejection opportunity, which can be efficiently exploited during processing. Further simplification of the flotation and electrostatic stages is also being investigated. These programmes aim to significantly reduce the capital and operating costs of the La Parrilla Project. The metallurgical programme is on track for completion in Q4 2015 and results will be reported shortly thereafter. Initial engineering at the La Parrilla site has commenced to define the tie-in strategy and the mechanical upgrades required to accommodate the key equipment to be added to the existing La Parrilla concentrator plant.

 

Commenting on the development programme, Mr Michael Masterman, Chairman of W Resources said: "La Parrilla continues to build momentum on the technical, approval and finance fronts. We expect strong results from both the drilling and metallurgical programmes, and project economics, which should allow us to deliver a low operational cost project. Final mining authorisation is on track for Q4 2015 and the priority of the team is on financing and development preparation."

 

 

Enquiries:

W Resources Plc

Michael Masterman

T: +44 (0) 20 7193 7463

www.wresources.co.uk

Grant Thornton UK LLP

Colin Aaronson / Jen Clarke / Harrison Clarke

T: +44 (0) 20 7383 5100

SI Capital - Joint Broker

Andy Thacker / Nick Emerson

T: +44 (0) 1483 413500

www.sicapital.co.uk

Gable Communications

Justine James

T: +44 (0) 20 7193 7463

M: +44 (0) 7525 324431

Northland Capital Partners - Joint Broker

John Howes / Abigail Wayne (Corporate Broking)

T: +44 (0) 20 7382 1100

www.northlandcp.co.uk

 

About La Parrilla

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site has exceptional infrastructure in place, which is accessed directly from the highway along a 3 km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The mine resource estimated by Golder in June 2013 is 46.92 million tonnes at 0.09% WO3, making it one of the largest tungsten deposits in the western world.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAENNAEESEFF
Date   Source Headline
28th Mar 20123:20 pmRNSIssue of Equity
7th Feb 20122:50 pmRNSCaspian announces £460,000 Placing
6th Feb 20129:30 amRNSOption Extension at La Parrilla Tungsten Mine
11th Jan 20127:00 amRNSDrilling Campaign Commences at La Parrilla
30th Dec 20117:00 amRNSCaspian Completes £210,000 Placing
19th Dec 201111:00 amRNSResult of General Meeting
30th Nov 20117:00 amRNSCaspian to acquire La Parrilla Tungsten Project
9th Sep 201111:48 amRNSHalf Yearly Report
1st Jul 201111:28 amRNSResult of AGM
24th Jun 201110:06 amRNSCaspian Completes £80,000 Placing
10th Jun 20117:00 amRNSAnnual Report and Notice of AGM
12th Apr 20114:51 pmRNSHolding in Company
29th Sep 20107:00 amRNSHalf Yearly Report
19th Jul 20104:50 pmRNSHolding in Company
9th Jul 201011:47 amRNSHolding in Company
7th Jul 20105:38 pmRNSDirector Shareholding
29th Jun 201011:18 amRNSResult of AGM
22nd Jun 201011:57 amRNSHolding in Company
14th Jun 20104:25 pmRNSOperational Update
14th Jun 20104:25 pmRNSCaspian Completes ?200,000 Placing
8th Jun 20103:07 pmRNSNotice of AGM and Annual Report
24th May 201011:00 amRNSFinal Results
9th Apr 20107:00 amRNSTrading Update
22nd Dec 20097:54 amRNSFirst Oil Shipment in Kentucky
30th Oct 20094:19 pmRNSIssue of Shares
12th Oct 20095:44 pmRNSStatement Regarding Share Price Movement
30th Sep 20093:45 pmRNSInterim Results
10th Jul 200911:54 amRNSTrading Update
29th Jun 200912:51 pmRNSResult of AGM and Issue of Equity
3rd Jun 20095:14 pmRNSCircular to Shareholders and Notice of AGM
28th May 20093:23 pmRNSIssue of Shares
22nd May 20093:29 pmRNSFinal Results
22nd May 20093:00 pmRNSDebt for Equity Swap Agreement
29th Apr 20099:23 amRNSTrading Update
11th Feb 200912:33 pmRNSKazakhstan Court Case Update and Trading Update
14th Jan 200912:47 pmRNSCaspian Completes ?42,000 Placement
14th Jan 20098:43 amRNSCaspian wins Initial Kazakhstan Court Case
25th Nov 200812:09 pmRNSCaspian Completes ?50,000 Placement
7th Nov 20088:42 amRNSDirectorate Change
26th Sep 200811:48 amRNSInterim Results
18th Sep 20087:00 amRNSExpands Black Gold Lease Holdings in Irvine Field
1st Sep 200812:52 pmRNSZhengeldy Regulatory Update
4th Aug 200811:27 amRNSResult of AGM
25th Jul 20087:00 amRNSDirector Shareholding
17th Jul 20081:51 pmRNSHolding in Company
9th Jul 20088:30 amRNSHolding in Company
8th Jul 200810:44 amRNSFuther Expansion into the USA
27th Jun 20088:00 amRNSApproval to Restart Productio
27th Jun 20087:00 amRNSAnnual Report and Accounts
28th May 20089:01 amRNSPlacing and USA Lease Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.