La Parrilla FTM Development Update

29 Sep 2015 11:01

RNS Number : 5387A
W Resources PLC
29 September 2015
 

 

29 September 2015

 

 

 

 

W Resources Plc

("W" or the "Company")

 

 

La Parrilla FTM Development Update

 

W Resources Plc (AIM:WRES), the tungsten, copper and gold mining, exploration, development and production company with assets located in Spain and Portugal, is pleased to provide an update on development work at its La Parrilla Fast Track Mine (FTM) located in Spain.

Strong progress has been made on the La Parrilla FTM and highlights include:

· Completion of 1,302 metres of diamond core drilling and 1,594 metres of grade control reverse circulation drilling in the FTM mining area

· Completion of the first phase of extensive metallurgical pilot testing and equipment testing

· Results to date indicate:

- Potential to reduce both capital and operating expenditures

- Potential for a 200% upgrade in WO3 content before the final concentration stages, which makes the product from La Parrilla comparable to some of the highest grade tungsten deposits globally

· Commencement of initial engineering tie in design

Assay preparation for the 2,900 metre infill and grade control programme is underway and logging results are positive. Assay results will be progressively reported in Q4 2015 and the upgraded JORC compliant mineral resource estimate is on track for issue in the next three to four months. Core and RC chip logging and analysis confirms the coarse grain "nuggetty" characteristics of the La Parrilla mineralisation, which supports low cost processing expectations.

Bulk sampling for the metallurgical programme from within the initial mining blocks has delivered grades of 0.251% for the initial 6 tonne sample. These grades are significantly higher than the design run of mine feed for the La Parrilla FTM development. The work is being conducted in leading test facilities in both Germany and Australia in order to ensure timely procurement of key long lead equipment.

Initial results from the metallurgical pilot programme continue to highlight the coarse grained nature of the ore and ease of separation at coarse sizes. In line with other global tungsten operations, pilot X-Ray ore sorting trials confirm 20% of the run of mine feed can be rejected at 25mm whilst recovering greater than 96% of the WO3. Pilot scale jig testing has confirmed 50% of the mass can be rejected during pre-concentration at 10mm whilst recovering more than 85% of the tungsten. This presents significant upside potential through reduction of both capital and operating expenditures by rejecting 60% of the run of mine feed prior to fine grinding. This provides nearly a 200% upgrade in WO3 content before final concentration stages, which makes La Parrilla project comparable in the high grade of feed to the concentrator to some of the best global tungsten projects.

In parallel to evaluating the base case process flowsheet, testing is underway to simplify the flowsheet even further. The natural brittleness (as distinct from the host rock) of scheelite presents a waste rejection opportunity, which can be efficiently exploited during processing. Further simplification of the flotation and electrostatic stages is also being investigated. These programmes aim to significantly reduce the capital and operating costs of the La Parrilla Project. The metallurgical programme is on track for completion in Q4 2015 and results will be reported shortly thereafter. Initial engineering at the La Parrilla site has commenced to define the tie-in strategy and the mechanical upgrades required to accommodate the key equipment to be added to the existing La Parrilla concentrator plant.

 

Commenting on the development programme, Mr Michael Masterman, Chairman of W Resources said: "La Parrilla continues to build momentum on the technical, approval and finance fronts. We expect strong results from both the drilling and metallurgical programmes, and project economics, which should allow us to deliver a low operational cost project. Final mining authorisation is on track for Q4 2015 and the priority of the team is on financing and development preparation."

 

 

Enquiries:

W Resources Plc

Michael Masterman

T: +44 (0) 20 7193 7463

www.wresources.co.uk

Grant Thornton UK LLP

Colin Aaronson / Jen Clarke / Harrison Clarke

T: +44 (0) 20 7383 5100

SI Capital - Joint Broker

Andy Thacker / Nick Emerson

T: +44 (0) 1483 413500

www.sicapital.co.uk

Gable Communications

Justine James

T: +44 (0) 20 7193 7463

M: +44 (0) 7525 324431

Northland Capital Partners - Joint Broker

John Howes / Abigail Wayne (Corporate Broking)

T: +44 (0) 20 7382 1100

www.northlandcp.co.uk

 

About La Parrilla

The La Parrilla project site is situated in the Extremadura region of southwest Spain, in the Provinces of Caceres-Badajoz, approximately 310 km southwest of Madrid. The site has exceptional infrastructure in place, which is accessed directly from the highway along a 3 km asphalt road and is serviced by electricity and water. The project comprises a tungsten mine and a tungsten tailings project. The mine resource estimated by Golder in June 2013 is 46.92 million tonnes at 0.09% WO3, making it one of the largest tungsten deposits in the western world.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCEAENNAEESEFF
Date   Source Headline
25th Mar 20204:36 pmRNSPrice Monitoring Extension
16th Mar 20208:30 amRNSOngoing Operations and Covid-19 Response
10th Mar 20207:00 amRNSRégua and La Parrilla Update. Director Retirement
10th Mar 20207:00 amRNS£756,000 Placing to Spanish Investors at 0.36p
18th Feb 20207:00 amRNSNew Loan Facility and Extremadura Grant Update
5th Feb 20209:55 amRNSRégua Commencement and Updated Régua JORC Resource
20th Jan 20207:00 amRNSConversion of Directors' Loans
9th Jan 20208:33 amRNSFirst Shipment from New Concentrator Plant
8th Jan 20207:00 amRNSNon-Executive Director Appointment
18th Dec 20197:00 amRNSAdditional $5 Million Facility. La Parrilla Update
5th Dec 20197:00 amRNSFinance Update
29th Nov 20192:48 pmRNSIssue of Shares and Financing Update
28th Nov 20197:00 amRNSLa Parrilla Production Update
15th Nov 20193:05 pmRNSLa Parrilla Ramp-Up Finance Update
8th Nov 20197:03 amRNSLa Parrilla First Concentrate and Financing Update
21st Oct 20197:00 amRNSFirst Ore Fed to La Parrilla Concentrator Plant
30th Sep 20198:00 amRNSHalf-year Report to 30 June 2019
16th Sep 20197:00 amRNSEUR1m placement to Spanish Investors
9th Sep 20194:14 pmRNSCorrection - Corporate and EUR 5.3 m Grant Update
9th Sep 201910:02 amRNSCorporate and EUR 5.3 m Grant Update
29th Aug 20197:00 amRNSLa Parrilla Concentrator Construction Complete
16th Aug 201911:39 amRNSDirector/PDMR Shareholding
14th Aug 20192:48 pmRNSDirector/PDMR Shareholding
7th Aug 20197:00 amRNSLa Parrilla Tungsten & Tin Mine Update
5th Aug 20195:12 pmRNSHolding(s) in Company
28th Jun 201912:42 pmRNSResult of AGM
28th Jun 20197:00 amRNSLa Parrilla Update
19th Jun 20197:01 amRNSHaulage and Crushing Contract Signed for Régua
19th Jun 20197:00 amRNSLa Parrilla and São Martinho Update
7th Jun 20197:00 amRNSLa Parrilla Mining Contract Awarded
3rd Jun 20192:46 pmRNSNotice of AGM and Annual Report
29th May 20198:12 amRNSJoint Broker Appointment
22nd May 20197:00 amRNSExercise of Warrants by Directors
21st May 20197:00 amRNSLa Parrilla Jig Commissioned with First Ore
9th May 20197:00 amRNSAdvance on 5.3m EUR Grant through Extremadura Bank
2nd May 20197:00 amRNSLa Parrilla Update and Mine Blast
30th Apr 201911:57 amRNSFinal Results for the Year Ended 31 December 2018
29th Apr 201912:15 pmRNSMajor Shareholding Notification
18th Apr 201911:00 amRNSPrice Monitoring Extension
18th Apr 20199:31 amRNSEarly Exercise of Warrants
16th Apr 20197:00 amRNSJig & Mill Plant Completed for Commissioning
1st Apr 20197:00 amRNSHigh Grade Tungsten Intersections at Régua
18th Mar 20197:00 amRNSUpdate on La Parrilla and on Portuguese assets
5th Feb 20197:00 amRNSLa Parilla Mine Update and Issue of Shares
20th Dec 20187:00 amRNSLa Parrilla Mine's First Crushed Ore
10th Dec 20187:00 amRNSMechanical Completion of La Parrilla Crusher Plant
3rd Dec 20187:00 amRNSFirst Tungsten Shipment from the La Parrilla Mine
27th Nov 201810:50 amRNSPlacing to Raise £1.5m
23rd Nov 20187:00 amRNSTPI Investor Evening - 10 December
20th Nov 20184:19 pmRNSGrant of Share Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.