We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUk Oil & Gas Regulatory News (UKOG)

Share Price Information for Uk Oil & Gas (UKOG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.0325
Bid: 0.03
Ask: 0.035
Change: 0.00 (0.00%)
Spread: 0.005 (16.667%)
Open: 0.0325
High: 0.0325
Low: 0.0325
Prev. Close: 0.0325
UKOG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Upgrade to Portland Sandstone Oil in Place Volumes

11 May 2015 07:00

RNS Number : 7130M
UK Oil & Gas Investments PLC
11 May 2015
 

11 May 2015

 

UK Oil & Gas Investments PLC

("UKOG" or the "Company")

 

Upgrade to Horse Hill Conventional Portland Sandstone Oil in Place Volumes

 

 

UK Oil & Gas Investments PLC (LSE AIM: UKOG) is pleased to announce an upgrade to the conventional Stock Tank Oil Initially In Place ("STOIIP") volumes estimated for the overall Upper Portland Sandstone conventional reservoir in the Horse Hill-1 ("HH-1") and Collendean Farm-1 ("CF-1")structure ("Horse Hill"), in the PEDL137 licence area (Surrey-West Sussex, Weald Basin). This revised STOIIP is separate to the oil-in-place volumes estimated for the argillaceous limestones and mudstones of the Kimmeridge, Oxford and Lias rock sections of the HH-1 well, as reported on 9 April 2015 and 15 April 2015. The Company has a net attributable interest of 20.358% in PEDL137.

 

An independent study of the Portland Sandstone reservoir was conducted by Xodus Group ("Xodus"), an international energy consultancy based in the UK (see www.xodusgroup.com). The study is based on new petrophysical evaluations of both the HH-1 discovery and the older Collendean Farm-1 ("CF-1") well plus an updated interpretation of 2D seismic data across the Licence. The study report is available on UKOG's website (see www.ukogplc.com).

 

The HH-1 and CF-1 discoveries lie within an approximately 100-foot thick, Upper Portland sandstone gross reservoir interval, within a 6km by 3km tilted fault block structure as defined by 2D seismic. The crest of the Upper Portland conventional oil discovery lies at approximately 1,760ft TVDSS, and extends over a mapped maximum areal closure of approximately 2,000 acres. The Upper Portland reservoir is productive at the nearby Brockham field, some 9km NNW, in which the Company has an indirect interest of 3.6%.

 

Xodus calculate that the Upper Portland Sandstone conventional reservoir contains a "Best Estimate" (P50) gross STOIIP of 21.0 MMbbl, which is slightly more than UKOG's own revised latest estimate of 20.0 MMbbl, and which is entirely within PEDL137 and encompasses both the HH-1 and CF-1 wells. This is an increase of 12.8 MMbbl over the 8.2 MMbbl (P50) gross STOIIP reported on 17 December 2014, which results largely from the new petrophysical evaluation of HH-1 electric logs, calibrated to new XRD and MICP data, and a new interpretation of the CF-1 electric logs, calibrated to core data.

 

The gross Upper Portland STOIIP ranges estimated by Xodus are as per the table below:

 

STOIIP (MMbbl)

Low

Best

High

Mean

Upper Portland Gross 100%

14.3

21.0

30.4

21.8

 

The oil in place hydrocarbon volumes (STOIIP) estimated should not be construed as recoverable resources or reserves. Meaningful estimates of recoverable oil within the Upper Portland can likely only be made following the proposed HH-1 flow test and a significant proportion will not be recovered during any future production regime.

 

The Upper Portland is the uppermost, conventional oil-saturated reservoir found in the HH-1 and CF-1 wells. It overlies, and is entirely separate from, the Kimmeridge, Oxford and Lias oil-saturated argillaceous limestone and mudstone rock sections reported on 9 April 2015 and 15 April 2015.

 

The Xodus study is an independent review, solely of the Upper Portland sandstone trap-constrained conventional oil reservoir. It does not include any assessment of the deeper Kimmeridge, Oxford and Lias oil-saturated argillaceous limestone and mudstone rock sections, which are currently the subject of a separate review by Nutech Ltd.

 

Reporting Standards:

 

Xodus' STOIIP volumes have been prepared in accordance with the 2007 Petroleum Resources Management System prepared by the Oil and Gas Reserves Committee of the Society of Petroleum Engineers (SPE), reviewed, and jointly sponsored by the World Petroleum Council (WPC), the American Association of Petroleum Geologists (AAPG) and the Society of Petroleum Evaluation Engineers (SPEE).

 

Xodus state in their Executive Summary that; "In conducting this review Xodus has utilised information and interpretations supplied by UKOG, comprising operator information, geological, geophysical, petrophysical, well logs and other data along with various technical reports. Xodus has reviewed the information provided and modified assumptions where it considered this to be appropriate. Site visits were not considered necessary for the purposes of this report."

 

Stephen Sanderson, UKOG's CEO, commented:

 

"The Xodus Report supports the Company's view that the Horse Hill and Collendean Farm oil pool constitutes a significant conventional Upper Portland Sandstone oil discovery in the Weald basin."

 

Subject to approval by the relevant authorities, the Company intends to flow test this conventional sandstone zone as part of a wider test programme of the HH-1 well later in 2015. A successful test would be followed by a full technical resource assessment, and the identification of potentially recoverable resource volumes.

 

Subject to these results, the Company is informed that the operator, Horse Hill Developments Ltd, intends to engage with the Oil and Gas Authority ("OGA") and other regulators, and seek to move the PEDL137 licence into the Production Period as soon as practicable, via submission of a Field Development Plan to the OGA. The PEDL137 licence is currently in the exploration phase and expires on 30 September 2015. HHDL has applied for a one-year extension of the exploration phase to 30 September 2016.

 

UKOG's interest in Horse Hill:

 

The Horse Hill-1 well is located within onshore exploration License PEDL137, on the northern side of the Weald Basin near Gatwick Airport. UKOG owns a 30% direct interest in Horse Hill Developments Ltd ("HHDL") and a 1.32% interest in HHDL via its 6% interest in Angus Energy Limited. HHDL is a special purpose company that owns 65% participating interests and is the operator of licence PEDL137 and the adjacent licence PEDL246 in the UK Weald Basin. The remaining 35% participating interests in the PEDL137 and PEDL246 licenses are held by Magellan Petroleum Corporation.

 

Qualified Person's Statement:

 

Stephen Sanderson, UKOG's CEO, who has over 30 years of relevant experience in the oil industry, has approved the information contained in this announcement. Mr Sanderson is a Fellow of the Geological Society of London and is an active member of the American Association of Petroleum Geologists.

 

For further information please contact:

 

UK Oil & Gas Investments PLC

David Lenigas / Donald Strang Tel: 020 7440 0640

 

WH Ireland (Nominated Adviser and Broker)

James Joyce / Mark Leonard Tel: 020 7220 1666

 

Square 1 Consulting (Public Relations)

David Bick / Mark Longson Tel: 020 7929 5599

 

Glossary:

argillaceous limestone

a limestone containing a significant proportion of clay minerals

clastic

rocks composed of broken pieces of older rocks

core

a cylindrical sample of rock, obtained during drilling of wells and removed for inspection at surface

discovery

a discovery is a petroleum accumulation for which one or several exploratory wells have established through testing, sampling and/or logging the existence of a significant quantity of potentially moveable hydrocarbons

electric logs

tools used within the wellbore to measure the rock and fluid properties of surrounding rock formations

fault block

a very large subsurface block of rock, created by tectonic and localised stresses

limestone

a carbonate sedimentary rock predominantly composed of calcite of organic, chemical or detrital origin. Minor amounts of dolomite, chert and clay are common in limestones. Chalk is a form of fine-grained limestone

MICP

mercury injection capillary pressure, a measure of rock porosity and permeability, from rock cores or cuttings, and a calibration of porosity logs

MMbbl

Million barrels

mudstone

an extremely fine-grained sedimentary rock consisting of a mixture of clay and silt-sized particles

oil in place or oil initially-in-place

the quantity of oil or petroleum that is estimated to exist originally in naturally occurring accumulations before any extraction or production

petrophysical evaluation

the study of physical and chemical rock properties and their interactions with fluids; studies typically use well logs, well cores and seismic data

P10

a 10% probability that a stated volume will be equalled or exceeded

P50

a 50% probability that a stated volume will be equalled or exceeded

P90

a 90% probability that a stated volume will be equalled or exceeded

recovery or recoverable

the quantity or portion of petroleum, here oil and gas, initially-in-place that can be extracted by a well or wells to the surface

resources

the Society of Petroleum engineers ("SPE") defines as all quantities of petroleum, here oil and gas, which are estimated to be initially-in-place; however, some users consider only the estimated recoverable portion to constitute a resource.

reserves

reserves are defined by the SPE as those quantities of petroleum, here oil and gas, which are anticipated to be commercially recovered from known accumulations from a given date forward.

reservoir

a subsurface rock formation containing an individual natural accumulation of moveable petroleum that is confined by impermeable rock/formations

sandstone

a clastic sedimentary rock whose grains are predominantly sand-sized. The term is commonly used to imply consolidated sand or a rock made of predominantly quartz sand

seismic

use of reflected and refracted sound waves generated at the surface to ascertain the nature of the subsurface geological structures. 2D seismic records a two dimensional cross-section through the subsurface collected using the two-dimensional common depth point method

STOIIP

stock tank oil initially in place

TVDSS

true vertical depth below a subsea datum

XRD

x-ray diffraction; scattering of x-rays by the atoms of a rock or crystal that gives information on the structure, composition and identity of the rock or crystal

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLAMMLTMBJBBLA
Date   Source Headline
19th Apr 202411:59 amRNSLoan Reduction via Equity Share Subscription
2nd Apr 20247:00 amRNSAnnual Report for the year ended 30 September 2023
27th Mar 20247:00 amRNSLoxley Gas Project Update
19th Mar 20245:00 pmRNSBroadford Bridge Planning Update
13th Mar 20249:29 amRNSLoan Reduction via Equity Share Subscription
5th Mar 20243:28 pmRNSResult of Reconvened General Meeting
1st Mar 20247:00 amRNSRevised Timetable for Capital Restructuring
23rd Feb 20241:01 pmRNSNotice of General Meeting Resumption
22nd Feb 20244:37 pmRNSEmployee Benefit Trust Share Subscription
16th Feb 20241:54 pmRNSGeneral Meeting Adjournment
2nd Feb 20242:08 pmRNSPinarova-1 Testing Operations Update
1st Feb 20241:53 pmRNSProposed Capital Reorganisation
23rd Jan 20243:48 pmRNSLoan Balance Reduction via Equity Share Issue
23rd Jan 20247:00 amRNSPinarova-1 Testing Operations Commence
12th Jan 20247:00 amRNSSuccessful Placing
11th Jan 20247:00 amRNSTurkey: Pinarova-1 Testing
10th Jan 202411:39 amRNSEquity Share Issue and Reduction in Loan Balance
9th Jan 20242:00 pmRNSCourt of Appeal Upholds Loxley Planning Consent
3rd Jan 20241:04 pmRNSTurkey: Pinarova-1 Operations Re-Commence
15th Dec 20237:00 amRNSTurkey: Pinarova-1 Testing Update
12th Dec 20237:00 amRNSHorse Hill Work Programme Extended by NSTA
11th Dec 20237:00 amRNSHorse Hill Farmin Update
8th Dec 20237:00 amRNSHorse Hill Developments Update
21st Nov 20237:00 amRNSTurkey: Pinarova-1 Testing Latest
3rd Nov 202312:13 pmRNSEquity Share Issue
13th Oct 20237:00 amRNSTurkey: Pinarova-1 Testing Update
22nd Sep 20237:00 amRNSTurkey: Pinarova-1 Testing Update
3rd Aug 20238:01 amRNSLoxley High Court Update
20th Jul 202310:44 amRNSHigh Court upholds Loxley Planning Consent
13th Jul 20237:00 amRNSAvington Oil Production to Restart
28th Jun 20237:00 amRNS£3 million funding facility
26th Jun 20232:13 pmRNSUnaudited results six-month ended 31 March 2023
21st Jun 20237:00 amRNSHorse Hill Update
8th Jun 20237:00 amRNSLoxley High Court hearing
23rd May 20239:06 amRNSTurkey: Pinarova-1 Testing Update
5th May 202312:12 pmRNSResult of Annual General Meeting
3rd May 20237:00 amRNSTurkey: Pinarova-1 Update
25th Apr 202312:30 pmRNSHolding(s) in Company
25th Apr 202312:13 pmRNSTurkey: Pinarova-1 drilling ahead
24th Apr 20237:00 amRNSHolding(s) in Company
21st Apr 20238:40 amRNSTurkey: Pinarova-1 oil shows & testing
18th Apr 202311:51 amRNSTurkey: Pinarova-1 casing set
13th Apr 202312:56 pmRNSHolding(s) in Company
13th Apr 20239:39 amRNSTurkey: Pinarova-1 reaches first casing point
11th Apr 20237:05 amRNSNotice of Annual General Meeting
11th Apr 20237:00 amRNSTurkey: Pinarova-1 drilling commences
5th Apr 20234:51 pmRNSHolding(s) in Company
3rd Apr 20237:00 amRNS2022 Annual Report and Accounts
31st Mar 20234:44 pmRNSAnnual Accounts for year ended 30 September 2022
31st Mar 20237:00 amRNSTurkey: Pinarova-1 construction completed

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.