Less Ads, More Data, More Tools Register for FREE

Pin to quick picksUrals Energy Plc Regulatory News (UEN)

  • There is currently no data for UEN

Operational Update

3 Jun 2008 07:00

RNS Number : 7965V
Urals Energy Public Company Limited
03 June 2008
 



Urals Energy Public Company Limited

Reserves Increases and Operational Update

Urals Energy ("Urals Energy", the "Company" or the "Group") (LSE: UEN) a leading independent exploration and production company with operations in Russia today announces the latest estimates published by DeGolyer and MacNaughton (D&M) for its total proven, probable and possible petroleum reserves as at 31 December 200and the value of these reserves. The Company also provides an update on operations. 

Reserves Upgrade and Acquisition of 35.3% of Taas Yuriakh

Upgrades driven by the acquisition of Taas Yuriakh and upward revisions to Dulisma reserves estimates, result in a 104% increase in total Group 2P reserves on a BOE basis to 1183 MMbbls BOE (Q1- 2007: 579MMbbls BOE).

117year on year increase in 2P liquids reserves to 560MMbbls (oil plus condensate) net to Urals (Q1-2007: 258 MMbbls). Of this 302MMbbl increase, the Taas Yuriakh acquisition contributes 253 MMbbls (net to Urals Energy) according to D&M, with the remaining increase resulting from an upward revision of the oil and condensate reserves in the Dulisma field, together with reserves adjustments in Urals' legacy assets.

The sale of Urals' Komi properties in April 2008 resulted in a decrease in the Group's total reserves of 16.6MMbbls according to D&M. The Nizny Omrinskoye and Voyvozh fields' reserves that were part of the sale were not included in the D&M report, and therefore this reserves reduction does not account for these fields.

100% and 78% increase in Dulisma free gas and condensate 2P reserves to 3.8 TCF and 82MMbbls respectively (Q1-2007: 1.9TCF and 46MMbbls). On a BOE basis this equates to 642MMbbls BOE for the free gas reserves only in Dulisma.

As of March 23, 2008 the Russian State reserves Committee has adjusted the total Taas Yuriakh C1+C2 recoverable oil reserves in a State Reserves Balance upwards to 900MMbbls (317MMbbls net to Urals) from 414MMbbls, including the southern Kurungsky extension of the Sredne Botuobinskoye (SRB) field.

License rights to overlying gas have been confirmed for Taas Yuriakh as of May 27, 2008. According to the Russian State Balance, the C1+C2 gas reserves total 6.3 Tcf (2.2 TCF net to Urals, or 366 MMbbls BOE). These reserves have not been included in the D&M report as of December 31, 2007.

137% year on year increase in the PV10 of the Group's 2P reserves to US$3,248 million (Q1-2007: US$1,368 million).

The full report by DeGolyer and MacNaughton is available on the Company's website in the Investor Relations section at the following address: http://www.uralsenergy.com/ir_presentations.htm 

Financial Highlights 

14 % increase in total revenues for the year to 31 December 2007 to US$194.1 million ($169.6 million in 2006)

Strengthened financial position following US$128 million equity capital raising and US$130 million Dulisma project finance loan granted by Sberbank. The loan facility will be increased by US$140 million in June 2008.

Proceeds from sale of Komi properties of US$93MM as of April 23, 2008.

Of the US$600 million Taas project finance loan facility granted by Sberbank in 2007 the first tranche of US$60 million has been disbursed and used for field infrastructure development, sidetracks drilling, 2D & 3D seismic acquisition and engineering services. 

Operational Highlights:

Ongoing consolidation of legacy assets remaining after sale of certain Komi properties, with a view to completing these divestures by year-end 2008.

Production from remaining assets stabilised at 5,500 bopd. This excludes production by Taas Yuriakh.

Dulisma plus Taas Yuriakh combined 2P forecast average production of 58,000 bopd for 2012 and 85,000 bopd for 2015 net to Urals Energy according to D&M.

Dulisma capex funding $50.6 million in 2007, total capex paid to date in 2008 $56.8 million, and the full capex budget for 2008 is US$159.2 million.

Dulisma 2008 drilling underway and with 2nd 225 ton mobile drilling rig onsite and set to spud by June 10, 2008.

Dulisma well # 105 pilot hole provided a Drill Stem Test result above expectations and the horizontal side track for this well is nearing completion.

Dulisma Central Processing Facility and Pipeline construction commenced and on schedule for completion end 2008, Central Transfer Facility (to ESPO) currently being tendered for construction with completion and start up planned for end Q1 2009To date 22 kilometres of the pipeline have been constructed.

10th horizontal sidetrack drilled in Taas Yuriakhin-field roads and pads undergoing construction

Required designs for the first phase drilling program and infrastructure for SRB and the connection pipeline are being finalized for State approval this summer.

Major 2D & 3D seismic acquisition program completed over the SRB Taas Yuriakh field during the winter 2007/08 with processing underway and interpretation to be ready in Q3 / Q4 2008.

Leonid Dyachenko, Chief Executive, commented:

"We are pleased to report a significant increase in our reserve base, driven both by acquisition and by upgrades to existing assets. This further strengthens our position as one of the leading Russian independent E&P companies. Importantly, the rise in the estimated valuation highlights the success of our acquisitions strategy and the attractiveness of the East Siberian oil fields. 

Operationally, we are making good progress on all our key developments. Work on both Dulisma and SRB fields is gaining momentum and we are on track to deliver to our stated targets."

3 June 2008

Enquiries:

Pelham PR

Gavin Davis

+44(0)20 7743 6677 / +44(0)7910 104 660

Evgeniy Chuikov

+44(0)20 3008 5506 / +44(0)7894 608 606

Elena Dobson

+44(0)20 3178 4418 / +44(0)7932 524 760

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCILFEDRRIFIIT
Date   Source Headline
17th May 20114:06 pmRNSNOTIFICATION OF MAJOR INTEREST IN SHARES
1st Apr 201111:47 amRNSDrilling Update
21st Mar 20117:00 amRNSOperational Update
24th Jan 20112:05 pmRNSIssue of Restricted Shares
10th Jan 20119:49 amRNSNotification of Major Interest in Shares
5th Jan 20113:34 pmRNSNotification of Major Interest in Shares
30th Dec 201010:18 amRNSEGM result and placing update
20th Dec 20107:00 amRNSPlacing
14th Dec 20104:30 pmRNSNotice of EGM
14th Dec 201011:57 amRNSClarification re Sberbank Reports
14th Dec 201011:10 amRNSHolding(s) in Company
18th Nov 20102:03 pmRNSFirst Petraco Installment and Operational Update
10th Nov 20107:00 amRNSOperational Update
22nd Oct 201010:13 amRNSAGM and Operational Update
22nd Oct 201010:13 amRNSAGM and Operational Update
7th Oct 20104:55 pmRNSUpdate of Petraco debt repayments
4th Oct 20103:24 pmRNSIssue of Stock Options
28th Sep 20104:14 pmRNSNotice of AGM
20th Sep 20102:44 pmRNSBoard Appointment, Update and Grant of Options
9th Sep 20107:00 amRNSInterim Results
17th Jun 20107:00 amRNSAnnual Report and Accounts
4th Jun 20102:43 pmRNSOperations Update, Results Date, Dealings
28th May 20102:55 pmRNSTotal voting rights
26th May 20107:00 amRNSOperational update and Petraco debt restructuring
29th Apr 20109:14 amRNSPetraco debt restructuring - results of EGM
20th Apr 20102:08 pmRNSUpdate on the Petraco refinancing
19th Apr 20107:00 amRNSOperations Update
14th Apr 20103:18 pmRNSNotice of EGM
12th Apr 20105:30 pmRNSPetraco Debt Restructuring and Operational Update
3rd Mar 201012:10 pmRNSRetirement of Directors
3rd Mar 201010:01 amRNSPress Speculation
19th Feb 201012:03 pmRNSOperational and corporate update
18th Dec 200911:38 amRNSResult of AGM
18th Dec 20097:00 amRNSRestoration - Urals Energy PCL
17th Dec 200911:32 amRNSInterim Results and Restoration of Trading on AIM
7th Dec 20096:12 pmRNSAnnual Financial Report
26th Nov 20094:44 pmRNSNotice of AGM
19th Nov 20097:00 amRNSDivestiture of Taas Yuriakh to Sberbank
4th Nov 20093:50 pmRNSAppointment of CEO
9th Oct 20095:41 pmRNSBoard Changes and Corporate Update
18th Sep 200912:21 pmRNSAppointment of Nominated Adviser and Broker
13th Aug 200912:32 pmRNSUpdate on NOMAD appointment
3rd Aug 20097:00 amRNSDulisma Divestiture
24th Jul 20097:00 amRNSUpdate on Sberbank negotiations and Annual account
13th Jul 20097:00 amRNSResignation of Nominated Adviser and Broker
9th Jul 20094:26 pmRNSAdmission of Vested Restricted Shares
30th Jun 20097:55 amRNSUpdate on Sberbank negotiations
30th Jun 20097:55 amRNSSuspension - Urals Energy Public Company Limited
15th Jun 20094:43 pmRNSDirectorate Change
18th May 20097:00 amRNSDirectorate Change

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.