Less Ads, More Data, More Tools Register for FREE

Pin to quick picksRPT.L Regulatory News (RPT)

  • There is currently no data for RPT

Ukraine Operations Update

30 Nov 2009 07:00

RNS Number : 2497D
Regal Petroleum PLC
30 November 2009
 



Regal Petroleum plc

("Regal" or the "Company")

30 November 2009

UKRAINE OPERATIONS UPDATE

Regal, the AIM-listed (RPT) oil and gas exploration and production group operating in Ukraine, Romania and Egypt, is pleased to provide an update on its drilling programme in Ukraine, where the Company is developing the Mekhediviska-Golotvshinska (MEX-GOL) and Svyrydivske (SV) gas and condensate fields.

Regal is drilling a series of "new generation" wells using two new Saipem-operated Lewco 2000hp rigs. These wells are intended to establish additional production from the proven Visean aged reservoirs ("B-sand") and to appraise and develop the deeper Tournaisian ("T-sand") and Devonian ("D-sand") aged reservoirs.

 

The first of these new generation wells, MEX-106, is producing from the B-sand reservoirs at a stable rate of 75,000 m3/d (2.6 MM scf/d) of gas and 12 m3/d (75 boepd) of condensate (521 boepd in aggregate).

The second well, SV-58, has now been completed, perforated and flared at surface and is currently being prepared for test from B-sand intervals via a production test separator. Test production rates will be announced in due course.

The third well, SV-61, spud on 5 September 2009, is making good progress and is presently at a depth of 4,890 metres where 9 5/8" casing has been run and cemented.

The fourth well, SV-66, was spud on 23 November 2009 and has reached a depth of 1,110 metres where 20" casing is being run.

MEX-106 

MEX-106 has been on continuous production since 25 September 2009 predominantly from the B-20 and also the B-23 reservoir intervals and is currently producing at a stable rate of approximately 75,000 m3/d (2.6 MM scf/d) of gas and 12 m3/d (75 boepd) of condensate (521 boepd in aggregate).

As announced on 1 October 2009, a mechanical obstruction has been lodged in the well and it is now planned to undertake a coiled tubing conveyed fishing operation before the perforation of the T-sand and D-sand reservoir intervals can be undertaken. Once the obstruction has been removed, the perforation programme will be resumed and these deeper reservoirs will be tested. A further update will be made with respect to the outcome of this intervention in due course.

The MEX-106 well was spud on 11 January 2009 in the MEX-GOL field and was drilled to a total measured depth of 6,020 metres, passing through B-sand, T-sand and D-sand reservoir intervals

 

SV-58

Gas has been flowed to surface and flared from the recently completed SV-58 well and preparations are underway to test this well through a test separator. B-sand reservoir intervals were perforated in the B-21 (5167 - 5172 metres), B-22 (5241 - 5249 metres, 5264 - 5303 metres, 5325 - 5343 metres) and B-23 (5412 - 5416 metres) sequences as well as the newly discovered B-24 limestone layer perforated at depths of 5499 - 5501 metres, 5518 - 5529 metres, 5543 - 5549 metres, 5550 - 5558 metres, 5561 - 5568 metres and 5573 - 5579 metres. Test production rates will be announced in due course.

SV-58 was spud on 26 February 2009 in the SV field and was drilled to a total measured depth of 6,309 metres, passing through B-sand, T-sand and D-sand reservoir intervals.

However, due to very high pressures encountered in previously untested gas-bearing (B-27) sands at 5,695 metres and 5,734 metres, it is considered possible that the T-sands and D-sands are also highly pressured. Consequently, these intervals will not be perforated at this time as the aggregate pressures may exceed the 10,000 psi safety rating of the surface equipment. It is intended to measure the pressures of the T-sands and D-sands in the SV-61 well by means of cased hole Drill Stem Tests in Q1 2010, which will allow a further review of the likely pressures in the deeper reservoirs in the SV-58 well.

 

SV-61

SV-61 was spudded on 5 September 2009 in the SV field and is making good progress, having reached a depth of 4,890 metres where 9 5/8" casing has been run and cemented.

The drilling performance of this well is a significant improvement when compared to the MEX-106 and SV-58 wells taking advantage of experience gained in drilling those wells.

 

SV-66

The SV-66 well, the fourth new well, was spudded on 23 November 2009, and is presented at a depth of 1,110 metres where 20" casing is being run.

David J Greer, CEO of Regal, commented

“We are very pleased with progress on our drilling campaign. With SV-58 now being prepared for production testing, SV-61 cased and cemented at its third casing point and SV-66 having reached its first casing point in less than a week, the level of activity in the field is at unprecedented levels. We eagerly await the results of the SV-58 production testing and we are confident that we will be able to remove the obstruction in MEX-106 and get access to the T-sands and D-sands to test for further production”. 

 

For further information, please contact:

Regal Petroleum plc Tel: 020 7408 9500

David J Greer, CEO

Strand Partners Limited Tel: 020 7409 3494 

Simon Raggett / Rory Murphy

Mirabaud Securities Tel: 020 7878 3362

Peter Krens / Pav Sanghera

Citigate Dewe Rogerson Tel: 020 7638 9571

Media Enquiries: Martin Jackson

Analyst Enquires: Emma Woollaston

Ronan McElroy, PhD Geology, SPE, Chief Technologist of Regal Petroleum plc, has reviewed and approved the technical information contained within this press release in his capacity as a qualified person, as required under the AIM Rules.

Definitions:

ATM atmosphere

boepd  barrels of oil equivalent per day

hp horsepower

m3/d cubic metres per day

mm millimetres

MM million

psi pounds per square inch

scf/d standard cubic feet per day

" inch

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCIFFSILELAFIA
Date   Source Headline
21st Sep 20187:00 amRNSBoard and Management Changes
14th Aug 20182:22 pmRNSHolding in Company
9th Aug 20187:01 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9th Aug 20187:00 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
31st Jul 20187:00 amRNSReserves & Resources Update
26th Jul 20187:00 amRNSVAS-10 Well Initial Testing Results
13th Jul 20187:00 amRNSSV-12 Workover Result
4th Jul 20187:00 amRNSUkraine Update
14th Jun 20184:00 pmRNSResult of AGM
18th May 20187:00 amRNSPosting of Annual Report and Notice of AGM
3rd Apr 20187:00 amRNSFull Year Results
14th Mar 201810:53 amRNSSpud of VAS-10 Well
5th Feb 201811:34 amRNSNotification of Major Interest in Shares
5th Jan 20187:00 amRNSUkraine Update
20th Nov 20177:00 amRNSLifting of Equipment Seizure Order
16th Nov 201712:07 pmRNSSecond Price Monitoring Extn
16th Nov 201712:02 pmRNSPrice Monitoring Extension
16th Nov 20177:00 amRNSResponse to media reports
4th Oct 20177:00 amRNSBoard Changes
20th Sep 20171:41 pmRNSBoard Appointment
18th Sep 20177:00 amRNS2017 Interim Results
29th Aug 201712:01 pmRNSBoard Changes
18th Aug 20174:35 pmRNSPrice Monitoring Extension
26th Jul 20173:30 pmRNSManagement Changes
5th Jul 20172:57 pmRNSUkraine Update
30th Jun 20177:00 amRNSGas Sales to Related Party
27th Jun 201712:56 pmRNSResult of AGM
26th Jun 20177:00 amRNSMEX-109 Well Hook-up and Flow Testing
7th Jun 20177:00 amRNSBanking Arrangements with a Related Party Bank
6th Jun 201712:31 pmRNSAnnual Report and Notice of Annual General Meeting
23rd May 20177:00 amRNSMEX-109 Well Initial Testing Results
28th Apr 20177:00 amRNSFinal Results
4th Apr 20177:00 amRNSUkraine Update
11th Jan 201712:07 pmRNSSecond Price Monitoring Extn
11th Jan 201712:02 pmRNSPrice Monitoring Extension
4th Jan 20177:00 amRNSUkraine Update
26th Sep 20167:00 amRNS2016 Interim Results
28th Jul 20162:56 pmRNSSpud of MEX-109 Well, Ukraine
5th Jul 20167:00 amRNSAcquisition and Bank Security Arrangements
30th Jun 20162:09 pmRNSResult of AGM
8th Jun 20167:00 amRNSAnnual Report and Notice of AGM
1st Jun 20167:00 amRNS2015 Audited Results
6th May 201611:16 amRNSDirectorate Changes
21st Apr 20162:48 pmRNSUkraine Update
29th Feb 20162:49 pmRNSUpdate on Banking Arrangements with Unex Bank
12th Jan 20167:00 amRNSUkraine Update
15th Dec 20152:48 pmRNSSV-6 Well
28th Sep 20157:00 amRNS2015 Interim Results
3rd Aug 20154:40 pmRNSSecond Price Monitoring Extn
3rd Aug 20154:35 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.