Regal, the AIM-listed oil and gas exploration and production group (symbol: RPT), announces a further update on its drilling and production operations in the Ukraine.

MEX-106 WELL

A wireline tubing cutter is currently awaiting import approval to begin operations to remove the small remaining 3m section of the "fish", following the successful retrieval of the main section last month. This will then enable the T-sand and D-sand abrasive perforation and test programme to resume in February 2010, with the aim of adding production from these horizons to the existing flow in this well, which is currently producing from the B-sands only. 

SV-58 WELL

Equipment is currently being mobilised, including 6,200m of coiled-tubing, for deployment to access and enable perforation, using the abrasive perforating technique, of the remaining 75m of target reservoir in the B-sands during February 2010.

SV-61 WELL

A 5m sandstone core was successfully recovered from the T-sands at an interval depth of 5,961m - 5,966m. On re-entering the well, difficulties were encountered preventing further progress. Given that the well was close to its planned target depth, a decision was taken to suspend the 6" hole section and to prioritise activities to accelerate the commencement of B-sand gas production, and consequently cashflow. Horizons deeper than the cored T-sand section in SV-61 will be tested in the nearby SV-66 well. Once that testing has been completed, an operational and economic assessment will then be made to determine what, if any, remedial action may be taken to further test the T-sand and D-sand sequences in SV-61.

Following the success of the recent trial abrasive perforation operation in SV-58, the presence of the rig on SV-61 allows Regal to capitalise on this success. The rig's pumping and liquid handling systems are already in place to immediately enable the installation of multiple abrasive perforation stations, which will each provide three access points to the main B-sand target reservoirs. This approach does not require mobilisation of an additional coiled-tubing unit and its associated equipment, and consequently will enable SV-58 and SV-61 to be perforated, using the abrasive perforation technique, in parallel. This should also enable production from SV-61 to commence ahead of plan. 

SV-66 WELL 

The well is at a depth of 4,721m and is progressing to the planned intermediate 12 1/4" hole depth of 4,894m, at which stage the 9 5/8" casing will be run immediately above the B-sand reservoir targets, before proceeding on to the B, T and D-sands. 

PRODUCTION 

The current total daily field production rates are 2,166 boepd (291,040 m3/d of gas and 72.2 m3/d of condensate), reflecting a slightly improved performance from SV-58 as its production has stabilised following the successful abrasive perforation trial. The earlier than planned cessation of drilling in the SV-61 6" hole section, in conjunction with the parallel abrasive perforation operations planned in both SV-58 and SV-61, should result in an improvement in production rates in the near future. 

For further information, please contact: 

Regal Petroleum plc Tel: 020 7408 9500 David J Greer, CEO 

Strand Hanson Limited Tel: 020 7409 3494 Simon Raggett / Rory Murphy 

Mirabaud Securities Tel: 020 7878 3362Peter Krens / Pav Sanghera 

Citigate Dewe Rogerson Tel: 020 7638 9571Media Enquiries: Martin JacksonAnalyst Enquires: Emma Woollaston

Ronan McElroy, PhD Geology, SPE, Chief Technologist of Regal Petroleum plc, has reviewed and approved the technical information contained within this press release in his capacity as a qualified person, as required under the AIM Rules.

Definitions:

boepd barrels of oil equivalent per daym metresm3/d cubic metres per day" inch

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFMGMMFLRGGZZ
Date   Source Headline
1st Apr 20081:51 pmRNSEgypt Update
27th Mar 20089:04 amRNSHolding(s) in Company
25th Mar 20082:40 pmRNSHolding(s) in Company
19th Mar 20085:46 pmRNSHolding(s) in Company
14th Mar 200811:40 amRNSHolding(s) in Company
6th Mar 20081:40 pmRNSDirectorate Change
4th Mar 200811:56 amRNSDirector/PDMR Shareholding
3rd Mar 20084:06 pmRNSHolding(s) in Company
27th Feb 20083:19 pmRNSUkraine Update
27th Feb 200810:30 amRNSHolding in Company
27th Feb 200810:21 amRNSTotal Voting Rights
27th Feb 20087:01 amRNSDirector/PDMR Shareholding
19th Feb 200810:51 amRNSResult of EGM
19th Feb 20089:44 amRNSUkraine Update
14th Feb 200811:16 amRNSDirector's Share Purchase
11th Feb 20082:31 pmRNSDrilling Update
8th Feb 200810:02 amRNSDirector's Share Purchase
7th Feb 20084:40 pmRNSSecond Price Monitoring Extn
7th Feb 20084:35 pmRNSPrice Monitoring Extension
7th Feb 200810:05 amRNSDirector's Share Purchase
6th Feb 20087:01 amRNSShare Options & Subscriptions
24th Jan 20087:01 amRNSConditional Placing
22nd Jan 200812:15 pmRNSHolding(s) in Company
18th Jan 20087:01 amRNSWell Test Result
28th Dec 20072:47 pmRNSRomania Well Update
24th Dec 20077:01 amRNSHolding(s) in Company
21st Dec 20077:02 amRNSWell Update
21st Dec 20077:01 amRNSLiberia Disposal
21st Dec 20077:01 amRNSDisposal
13th Dec 20077:01 amRNSWell Update
7th Dec 20074:35 pmRNSPrice Monitoring Extension
5th Dec 200711:03 amRNSHolding(s) in Company
26th Nov 20077:01 amRNSTermination of MOU
23rd Nov 20071:12 pmRNSERB-B-1X well
22nd Nov 20074:40 pmRNSSecond Price Monitoring Extn
22nd Nov 20074:35 pmRNSPrice Monitoring Extension
22nd Nov 20074:03 pmRNSBoard Changes
21st Nov 20074:14 pmRNSSuceava Well Spud
21st Nov 20077:01 amRNSUkraine Update
30th Oct 200711:11 amRNSHolding(s) in Company
29th Oct 20074:13 pmRNSGas Discovery in Romania
22nd Oct 200710:30 amRNSHolding(s) in Company
17th Oct 20073:37 pmRNSHolding(s) in Company
17th Oct 20078:49 amRNSRomanian Operations Update
10th Oct 20077:01 amRNSEgypt Exploration Update
8th Oct 20077:00 amRNSUkraine Update
27th Sep 20077:01 amRNSInterim Results
24th Sep 20077:02 amRNSEgyptian Discovery
19th Sep 200712:21 pmRNSIFRS
14th Sep 20077:00 amRNSUkraine Partial Divestment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.