Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPower Metal Resources PLC Regulatory News (POW)

Share Price Information for Power Metal Resources PLC (POW)

Share Price is delayed by 15 minutes
Get Live Data
14.50    0.00 (0.00%)
Bid:
0.00
Ask:
0.00
Spread: 0.25 (1.754%)
Market Cap: £16.37m
POW Live PriceLast checked at - London Stock Exchange

Intraday Power Metal Resources PLC Share Chart

Molopo Farms Complex - Drilling Progress Update

16 Nov 2020 14:30

RNS Number : 4682F
Power Metal Resources PLC
16 November 2020
 

16 November 2020

Power Metal Resources PLC

("Power Metal" or the "Company")

Botswana Molopo Farms Complex - Drilling Progress Update

 

Power Metal Resources PLC (LON:POW) the AIM listed metals exploration and development company is pleased to provide a drilling update confirming completion of the first hole (KKME 1-14) at the Kalahari Key Mineral Exploration Pty Ltd ("Kalahari Key" or "KKME") Molopo Farms Complex Project (the "Project" or "MFC Project"), which is targeting prospective massive nickel sulphide and platinum-group metal ("PGM") mineralisation in Botswana.

 

HIGHLIGHTS

- The first hole (KKME 1-14) of a planned 2,505 metre four-hole programme has been completed successfully and achieved target depth of 520 metres with near 100% core recovery.

 

- The suite of rocks encountered in KKME 1-14 has successfully confirmed the proposition that the geology at the MFC Project is that of a feeder zone.

 

- About 167 metres of ultramafic rock, a potential host for PGMs and nickel, has been encountered below an altered contact around 41 metres down hole. Samples to be prepared and assay tested.

 

- Downhole geophysics to be undertaken at the end of hole to identify and clarify the conductive structures around and below the 520 metre hole depth.

 

CHIEF EXECUTIVE OFFICER UPDATE

Paul Johnson Chief Executive Officer of Power Metal Resources commented: "I am extremely pleased to report the programme has got off to a great start with successful completion of the first exploration hole KKME 1-14 down to the planned depth of 520m.

For the MFC Project we have successfully and significantly validated the geological proposition that the geology at the Project is that of a feeder zone.

We have some important work to undertake utilising the core from KKME 1-14 which includes field-based core review and sample preparation for assay testing. We are also to undertake downhole geophysics shortly to confirm the conductive structures at depth.

Whilst the analysis of the core and down hole geophysics is being carried out at KKME 1-14, and to keep the programme running efficiently, we will now move the drill rig to the second hole location where drilling is expected to commence imminently. Further details on this to follow shortly.

In summary, we are now full thrust into the MFC Project programme, and are already many steps forward from just a few weeks ago. We have validated the geological model, successfully completed our first drill hole and have core from the 520m hole which we are now examining and will be testing." 

 

DRILL PROGRAMME FURTHER INFORMATION

· The first drill hole KKME 1-14 at the MFC Project has now attained a target depth of 520m. The hole was completed safely and securely and has achieved near 100% core recovery.

 

· KKME 1-14 was sited in the Jwaneng-Makopong Shear/Feeder zone to the east of the main Molopo Farms Complex intrusion. (The next two holes are planned to intersect the same zone within the main part of the intrusion.)

 

· KKME 1-14 has successfully confirmed the geological proposition that the geology at Molopo Farm is that of a feeder zone. In addition, the hole appears to confirm the geophysical modelling, with some precision in the identification of conductors at depth.

 

· The drill core is now the subject of field-based analysis and after cutting and visual inspection, samples will be prepared for assay testing at an accredited laboratory in South Africa. In addition, thin sections of rock will be taken for petrographic analysis.

 

· The assay testing will confirm the composition of the drill core and metal content. The petrographic analysis is an in-depth investigation of the chemical and physical features of the rock which will add considerably to our geological understanding of the area.

 

· The drilling has confirmed the presence of ultramafic rocks of the Molopo Farms Complex along the Jwaneng-Makopong Shear/Feeder zone.

 

· The outcome of the drilling includes the discovery of a serpentinite intrusion into the Transvaal strata. This intrusion comprises 167 metres of ultramafic serpentinite in the drill core (the planned petrographic and chemical analysis of the core will allow a more exact lithological description).

 

· The ultramafic serpentinite extended from 41m to 208m (with the top 20m highly weathered) within the drill hole. Serpentinite is a potential host rock for PGMs and nickel and therefore the rock will be subject to assay testing.

 

· The hole finished after passing through 25m of pyritic and graphitic mudstones from around 480m to 505m which could be the conductor identified from geophysical work or could overlie it.

 

· The graphitic and iron sulphide mudstones ("Mudstones") encountered towards the bottom of the hole died out with depth, while the geophysics carried out before drilling indicated an anomaly stronger with depth.

 

· Moreover, the Mudstones should be a continuous unit (at the base of the Segwagwa Group) and yet the geophysical conductor target appears to be more confined.

 

· As a result further investigation is required to confirm or eliminate the presence of other conductive structures around or below the end of hole.

 

· A down-hole geophysical probe is now being deployed into the first hole to gather additional deep-seated data to supplement the surface derived Time Domain Electromagnetic ("EM") and Natural Field Audio Magneto Telluric ("NF-AMT") geophysical modelling.

 

· The down-hole geophysics work will detect any other conductive structures for 300m around and below the drill hole. This will provide detailed and more precise data to help identify the location of any other conductive structures that should be targeted with further drilling. 

 

· Should the geophysical probe results and modelling show the presence of a significant conductor below the current end of hole, we have the option of reinstating the rig to extend or deviate the hole.

 

· Whilst analysis work is undertaken at KKME 1-14 and to ensure programme continuity we are making preparations to move the drill rig to the second drill hole location out of a planned four-hole programme at the MFC Project and further information in respect of this drill target will be provided shortly.

 

OWNERSHIP STRUCTURE - MOLOPO FARMS COMPLEX PROJECT

Power Metal currently has an 18.26% shareholding in Kalahari Key and has elected to earn in ("Earn-In") to a 40% direct interest in the MFC Project by funding US$500,000 of exploration expenditure in 2020, notably the diamond drilling of selected targets (the "Drill Programme"). On completion of the Earn-In, and on the basis of the current 18.26% shareholding in Kalahari Key, Power Metal will have an effective economic interest of 50.96% in the MFC Project.

 

THE DRILL PROGRAMME

The Drill Programme is for an initial planned 2,505m across four diamond core drill holes with planned target hole depths varying from 525m to 710m.

The Drill Programme is designed to intersect four high priority targets prospective for massive nickel sulphide mineralisation, delineated by both Time Domain Electromagnetic ("EM") and Natural Field Audio Magneto Telluric ("NF-AMT") geophysics surveys.

 

FINANCING OF THE EARN-IN

In respect of the US$500,000 Earn-in spend Power Metal has to date sent cash payments for initial expenses of US$133,641 to Kalahari Key, leaving a balance of US$366,359 (approximately £278,000) remaining.

This balancing amount is fully funded and covered by Power Metal existing working capital comprising cash and listed investments which as at 13 November 2020 was approximately £1,734,000. 

 

COMPETENT PERSON STATEMENT

The technical information contained in this disclosure has been read and approved by Mr Nick O'Reilly (MSc, DIC, MIMMM, MAusIMM, FGS), who is a qualified geologist and acts as the Competent Person under the AIM Rules - Note for Mining and Oil & Gas Companies. Mr O'Reilly is a Principal consultant working for Mining Analyst Consulting Ltd which has been retained by Power Metal Resources PLC to provide technical support.

The information contained within this announcement is considered to be inside information prior to its release, as defined in Article 7 of the Market Abuse Regulation No.596/2014 and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.

 

For further information please visit https://www.powermetalresources.com/ or contact:

Power Metal Resources plc

 

Paul Johnson (Chief Executive Officer)

+44 (0) 7766 465 617

 

 

SP Angel Corporate Finance (Nomad and Joint Broker)

 

Ewan Leggat/Charlie Bouverat

+44 (0) 20 3470 0470

 

 

SI Capital Limited (Joint Broker)

 

Nick Emerson

+44 (0) 1483 413 500

 

 

First Equity Limited (Joint Broker)

 

David Cockbill/Jason Robertson

+44 (0) 20 7330 1883

 

 

 

Notes to Editors:

Power Metal Resources plc (LON:POW) is an AIM listed metals exploration and development company seeking a large scale metal discovery.

The Company has a global portfolio of project interests including precious metal exploration in North America and Australia together with base metal exploration in Africa. Project interests range from early stage greenfield exploration to later stage prospects currently subject to drill programmes.

The Board and its team of advisors have expertise in project generation, exploration and development and have identified an opportunity to utilise the Company's position to become a leader in the London market for investors wishing to gain exposure to proactive global metals exploration.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLEALFKFEFEFFA
Date   Source Headline
20th Jun 20197:00 amRNSBotswana Conference Presentation - Kalahari Key
19th Jun 20192:00 pmRNSInvestment and Option Agreement with Katoro Gold
19th Jun 20192:00 pmRNSUpdate re African Battery Metals Agreement
13th Jun 201910:51 amRNSDirector/PCA Dealings
12th Jun 20196:18 pmRNSDirector Dealing
12th Jun 201912:55 pmRNSDirector Dealing
11th Jun 20199:39 amRNSInterim Results
7th Jun 20199:11 amRNSKisinka Project - 7 km Copper Anomaly Identified
21st May 20199:22 amRNSHaneti Nickel project - Exploration Update
20th May 201911:43 amRNSCameroon Cobalt-Nickel Project Update
17th May 20197:00 amRNSKisinka Project Update
15th May 20192:30 pmRNSInvestment and Option Agreement with Katoro Gold
13th May 20197:00 amRNSAcquisition and Earn-in Agreement
7th May 201911:32 amRNSResult of AGM
2nd May 20197:00 amRNSKisinka Project - Operational Update
12th Apr 20199:56 amRNSKisinka Copper-Cobalt Project Update
3rd Apr 20192:22 pmRNSDirector/PDMR Shareholding
3rd Apr 20197:00 amRNSCameroon Cobalt-Nickel Project Update
1st Apr 20197:13 amRNSPosting of documents to shareholders
29th Mar 20197:00 amRNSAudited Results for the Year Ended 30 Sept 2018
28th Mar 20194:40 pmRNSSecond Price Monitoring Extn
28th Mar 20194:35 pmRNSPrice Monitoring Extension
15th Mar 201910:00 amRNSInvestment and Option Agreement with Katoro Gold
15th Mar 201910:00 amRNSInvestment and Option Agreement
11th Mar 20192:00 pmRNSKisinka Copper-Cobalt Project Update
7th Mar 201911:05 amRNSSecond Price Monitoring Extn
7th Mar 201911:00 amRNSPrice Monitoring Extension
6th Mar 20197:00 amRNSBusiness Update - Strategic and Operational Plan
28th Feb 20198:30 amRNSTotal Voting Rights
27th Feb 201910:48 amRNSHolding(s) in Company
18th Feb 20194:41 pmRNSSecond Price Monitoring Extn
18th Feb 20194:35 pmRNSPrice Monitoring Extension
18th Feb 20197:31 amRNSRestoration of Trading
18th Feb 20197:30 amRNSRestoration - African Battery Metals Plc
15th Feb 20191:18 pmRNSResult of GM, Director Dealing & Suspension Update
29th Jan 20197:00 amRNSNotice of General Meeting
28th Jan 201912:40 pmRNSConditional Refinancing & Business update
11th Dec 20184:25 pmRNSStatement re. Suspension
11th Dec 20184:00 pmRNSSuspension - African Battery Metals Plc
14th Nov 20187:00 amRNSUpdate on Exploration Activities
16th Oct 20187:00 amRNSUpdate on Ivory Coast Project
31st Aug 20187:00 amRNSTotal Voting Rights
30th Aug 20187:00 amRNSUpdate
28th Aug 20181:00 pmRNSResult of General Meeting
10th Aug 201811:17 amRNSIssue of Equity
8th Aug 20187:00 amRNSAcquisitions, Issue of Equity and Corporate Update
20th Jun 20187:00 amRNSInterim Results
5th Jun 20187:00 amRNSUpdate
1st Jun 201811:05 amRNSSecond Price Monitoring Extn
1st Jun 201811:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.