Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Share Price Information for Pan African Resources (PAF)

Share Price is delayed by 15 minutes
Get Live Data
107.70    -0.60 (-0.55%)
Bid:
107.60
Ask:
107.90
Spread: 0.30 (0.279%)
Market Cap: £2.18b
PAF Live PriceLast checked at - London Stock Exchange

Intraday Pan African Resources Share Chart

Operational Update

2 Mar 2018 07:00

Pan African Resources Plc - Operational Update

Pan African Resources Plc - Operational Update

PR Newswire

London, March 1

Pan African Resources PLC

(Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000)

AIM Code: PAF

JSE Code: PAN

ISIN: GB0004300496

(“Pan African” or the “Company”)

OPERATIONAL UPDATE

Further to the operational update released on 1 February 2018, Pan African is pleased to provide further information on progress at the Fairview 11-block Main Reef Complex (“MRC”) orebody and the Barberton Tailings Retreatment Plant (“BTRP”), as well as updated guidance on the commencement of production from the Elikhulu Tailings Retreatment Plant (“Elikhulu”).

Barberton Mines - Fairview 11-block MRC orebody grades

The average head grade for the Barberton Mines complex, which includes the Fairview, Sheba and Consort mines, has risen from an average of 8.7g/t during July to December 2017 to 11.5g/t which was recorded in the February 2018 production month. This 32% increase in head grade is predominantly as a result of mining high-grade ore at the 272 platform since January 2018. The latest on-reef development samples taken in the 272 platform, recorded an average grade of 99.2g/t (ranging from 2.2g/t to 1,320g/t) over a mineralised width of 3.36m along a strike length of 24m. This confirms that the high-grade areas of this mining block are now in production. This high-grade core of the 11-block MRC orebody is encapsulated within a 75m mineralised envelope with the remainder of the mineralisation retrieving an average grade of 10.5g/t.

Furthermore, face sampling of the on-reef development, taken of the mineralised 11-block MRC orebody at the 358 platform, resulted in an average grade of 45.7g/t over a mineralised width of 2m, confirming that the on-reef development has reached the high-grade section of this mining block. It is envisaged that the strike length of the MRC orebody on the 358 platform will be 75m with a high-grade core of 40m, extrapolated from the 272 platform above.

These platforms underpin Fairview’s high-grade production and mining flexibility, particularly for ore haulage, development waste disposal and improving the mining face availability for the next two years, during which development of the next platform below the 358 will be completed. Production from 11-block MRC orebody will be further enhanced with the completion of the sub-vertical shaft in two years’ time.

BTRP regrind mill construction update

The construction of the regrind mill is proceeding according to schedule with commissioning anticipated in the last week of April 2018. On commissioning of the regrind mill, production at the BTRP is expected to increase to approximately 21,000 ounces per annum.

Elikhulu construction update

Construction is progressing ahead of schedule with first gold expected in August 2018. Ramp up to full production of approximately 55,000 ounces per annum is expected to take no longer than two months, after which Elikhulu is estimated to produce gold at an all-in sustaining cost of production of below $650/oz, at the prevailing USD:ZAR exchange rate. In conjunction with the Evander Tailings Retreatment Plant, these two operations are expected to produce more than 70,000 ounces per annum.

Evander Mines labour consultation process

As previously announced on 27 February 2018, Evander Mines is currently in a consultation process with its labour in terms of section 189 of the South African Labour Relations Act, 66 of 1995. Further announcements will be made in due course.

Commenting on the operational update, Cobus Loots, CEO, stated:

“Pan African is focused on sustainable lower cost gold production from our asset portfolio. After a challenging period at Barberton Mines we have successfully dealt with the key underground challenges at Fairview’s 11-block and we are on track to re-establish BTRP’s production profile at approximately 21,000 ounces per annum. Mining over the past two months at the 272 platform and the development into the 358 platform confirms the geological continuity of Fairview’s 11-block high-grade orebody. These developments, along with progress at the BTRP and Elikhulu, provide Pan African with far greater certainty of high quality gold ounce production.”

The information contained in this announcement has not been reviewed or reported on by Pan African’s auditors and is the responsibility of the Directors of Pan African.

Johannesburg

2 March 2018

Contact information
Corporate OfficeThe Firs Office Building1st Floor, Office 101Cnr. Cradock and Biermann AvenuesRosebank, JohannesburgSouth AfricaOffice: + 27 (0) 11 243 2900Facsimile: + 27 (0) 11 880 1240Registered OfficeSuite 31Second Floor107 CheapsideLondonEC2V 6DNUnited KingdomOffice: + 44 (0) 207 796 8644Facsimile: + 44 (0) 207 796 8645
Cobus Loots Pan African Resources PLCChief Executive Officer Office: + 27 (0) 11 243 2900Deon LouwPan African Resources PLCFinancial DirectorOffice: + 27 (0) 11 243 2900
Phil DexterSt James's Corporate Services LimitedCompany SecretaryOffice: + 44 (0) 207 796 8644John Prior / Paul GillamNumis Securities LimitedNominated Adviser, Joint BrokerOffice: +44 (0) 20 7260 1000
Sholto SimpsonOne CapitalJSE SponsorOffice: + 27 (0) 11 550 5009Ross Allister / James BavisterPeel Hunt LLPJoint BrokerOffice: +44 (0) 207 418 8900
Jeffrey Couch/Neil Haycock/Thomas RiderBMO Capital Markets LimitedJoint BrokerOffice: +44 (0) 207 236 1010Bobby Morse/Chris JuddBuchanan CommunicationsPublic & Investor Relations UKOffice: + 44 (0) 207 466 5000
Julian GwillimAprio Strategic CommunicationsPublic & Investor Relations SAOffice: +27 (0)11 880 0037 www.panafricanresources.com
Date   Source Headline
21st Feb 20087:00 amPRNInteirm Results & Directorship Change
20th Feb 20087:00 amPRNStatement re Earn-in Agreement
29th Jan 20087:00 amPRNManica Gold Project, Mozambique - Drilling Update
18th Jan 200812:32 pmPRNResult of AGM
20th Dec 20077:00 amPRNFinal Results For the period ended 30 June 2007
27th Nov 20077:00 amPRNDrilling Update
19th Nov 20077:00 amPRNDrilling Update - Manica Project, Mozambique
29th Oct 20076:00 amPRNStatement re Corporate Presentation
8th Oct 20077:00 amPRNDirectorate Change
21st Sep 20077:01 amRNSCorporate Presentation
19th Sep 20077:01 amRNSIssue of Equity
11th Sep 200712:09 pmRNSCorporate Presentation
10th Sep 200710:17 amRNSResource Upgrade
7th Sep 20072:03 pmRNSHolding(s) in Company
30th Aug 200712:43 pmRNSIssue of Shares
20th Aug 20074:51 pmRNSAIM Rule 26
31st Jul 20072:29 pmRNSRe-Admission to Trading
31st Jul 20078:00 amRNSCancel - Pan African Res
27th Jul 20074:11 pmRNSResults of EGM
27th Jul 20077:01 amRNSNotification of Voting Rights
17th Jul 20077:00 amRNSDirector/PDMR Shareholding
11th Jul 200710:26 amRNSSchedule 1 - Pan African
28th Jun 20077:04 amRNSAcquisition
26th Jun 20077:02 amRNSBarberton Update
24th May 20077:15 amRNSInterim Results
11th May 20074:17 pmRNSIssue of Shares
27th Dec 20067:01 amRNSInterim Results
22nd Dec 20069:34 amRNSTotal Voting Rights
20th Dec 20068:39 amRNSSuspension-Pan African
20th Dec 20067:30 amRNSProposed Acquisition
14th Nov 20067:02 amRNSManica: independent valuation
2nd Oct 20068:36 amRNSManica metallurgical results
27th Jul 200612:15 pmRNSResult of AGM
30th Jun 20061:37 pmRNSFinal Results
20th Jun 20067:00 amRNSManica Resource Upgade
17th May 200612:23 pmRNSProject Update
20th Apr 20069:35 amRNSManica Drill Results -Replace
20th Apr 20068:44 amRNSManica Drill Results
7th Apr 20064:55 pmRNSHolding(s) in Company
5th Apr 20067:01 amRNSPan African raises GBP 1.7m
13th Mar 20067:01 amRNSNew CAR Exploration Licences
6th Mar 20067:02 amRNSCAR Project Update
2nd Feb 200612:04 pmRNSVerification of 1Moz Resource
26th Jan 20068:57 amRNSUpdate of Exploration Results
12th Jan 20067:01 amRNSDrilling Programme Commences
9th Jan 20069:18 amRNSAcquisition Manica Project
23rd Dec 20057:01 amRNSInterim Results
22nd Dec 200512:54 pmRNSPrivate Placing
22nd Dec 200512:50 pmRNSChange of Adviser
10th Nov 20057:00 amRNSCAR Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.