Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Share Price Information for Pan African Resources (PAF)

Share Price is delayed by 15 minutes
Get Live Data
108.30    1.90 (1.79%)
Bid:
107.10
Ask:
108.20
Spread: 1.10 (1.027%)
Market Cap: £2.20b
PAF Live PriceLast checked at - London Stock Exchange

Intraday Pan African Resources Share Chart

Operational Update

2 Mar 2018 07:00

Pan African Resources Plc - Operational Update

Pan African Resources Plc - Operational Update

PR Newswire

London, March 1

Pan African Resources PLC

(Incorporated and registered in England and Wales under Companies Act 1985 with registered number 3937466 on 25 February 2000)

AIM Code: PAF

JSE Code: PAN

ISIN: GB0004300496

(“Pan African” or the “Company”)

OPERATIONAL UPDATE

Further to the operational update released on 1 February 2018, Pan African is pleased to provide further information on progress at the Fairview 11-block Main Reef Complex (“MRC”) orebody and the Barberton Tailings Retreatment Plant (“BTRP”), as well as updated guidance on the commencement of production from the Elikhulu Tailings Retreatment Plant (“Elikhulu”).

Barberton Mines - Fairview 11-block MRC orebody grades

The average head grade for the Barberton Mines complex, which includes the Fairview, Sheba and Consort mines, has risen from an average of 8.7g/t during July to December 2017 to 11.5g/t which was recorded in the February 2018 production month. This 32% increase in head grade is predominantly as a result of mining high-grade ore at the 272 platform since January 2018. The latest on-reef development samples taken in the 272 platform, recorded an average grade of 99.2g/t (ranging from 2.2g/t to 1,320g/t) over a mineralised width of 3.36m along a strike length of 24m. This confirms that the high-grade areas of this mining block are now in production. This high-grade core of the 11-block MRC orebody is encapsulated within a 75m mineralised envelope with the remainder of the mineralisation retrieving an average grade of 10.5g/t.

Furthermore, face sampling of the on-reef development, taken of the mineralised 11-block MRC orebody at the 358 platform, resulted in an average grade of 45.7g/t over a mineralised width of 2m, confirming that the on-reef development has reached the high-grade section of this mining block. It is envisaged that the strike length of the MRC orebody on the 358 platform will be 75m with a high-grade core of 40m, extrapolated from the 272 platform above.

These platforms underpin Fairview’s high-grade production and mining flexibility, particularly for ore haulage, development waste disposal and improving the mining face availability for the next two years, during which development of the next platform below the 358 will be completed. Production from 11-block MRC orebody will be further enhanced with the completion of the sub-vertical shaft in two years’ time.

BTRP regrind mill construction update

The construction of the regrind mill is proceeding according to schedule with commissioning anticipated in the last week of April 2018. On commissioning of the regrind mill, production at the BTRP is expected to increase to approximately 21,000 ounces per annum.

Elikhulu construction update

Construction is progressing ahead of schedule with first gold expected in August 2018. Ramp up to full production of approximately 55,000 ounces per annum is expected to take no longer than two months, after which Elikhulu is estimated to produce gold at an all-in sustaining cost of production of below $650/oz, at the prevailing USD:ZAR exchange rate. In conjunction with the Evander Tailings Retreatment Plant, these two operations are expected to produce more than 70,000 ounces per annum.

Evander Mines labour consultation process

As previously announced on 27 February 2018, Evander Mines is currently in a consultation process with its labour in terms of section 189 of the South African Labour Relations Act, 66 of 1995. Further announcements will be made in due course.

Commenting on the operational update, Cobus Loots, CEO, stated:

“Pan African is focused on sustainable lower cost gold production from our asset portfolio. After a challenging period at Barberton Mines we have successfully dealt with the key underground challenges at Fairview’s 11-block and we are on track to re-establish BTRP’s production profile at approximately 21,000 ounces per annum. Mining over the past two months at the 272 platform and the development into the 358 platform confirms the geological continuity of Fairview’s 11-block high-grade orebody. These developments, along with progress at the BTRP and Elikhulu, provide Pan African with far greater certainty of high quality gold ounce production.”

The information contained in this announcement has not been reviewed or reported on by Pan African’s auditors and is the responsibility of the Directors of Pan African.

Johannesburg

2 March 2018

Contact information
Corporate OfficeThe Firs Office Building1st Floor, Office 101Cnr. Cradock and Biermann AvenuesRosebank, JohannesburgSouth AfricaOffice: + 27 (0) 11 243 2900Facsimile: + 27 (0) 11 880 1240Registered OfficeSuite 31Second Floor107 CheapsideLondonEC2V 6DNUnited KingdomOffice: + 44 (0) 207 796 8644Facsimile: + 44 (0) 207 796 8645
Cobus Loots Pan African Resources PLCChief Executive Officer Office: + 27 (0) 11 243 2900Deon LouwPan African Resources PLCFinancial DirectorOffice: + 27 (0) 11 243 2900
Phil DexterSt James's Corporate Services LimitedCompany SecretaryOffice: + 44 (0) 207 796 8644John Prior / Paul GillamNumis Securities LimitedNominated Adviser, Joint BrokerOffice: +44 (0) 20 7260 1000
Sholto SimpsonOne CapitalJSE SponsorOffice: + 27 (0) 11 550 5009Ross Allister / James BavisterPeel Hunt LLPJoint BrokerOffice: +44 (0) 207 418 8900
Jeffrey Couch/Neil Haycock/Thomas RiderBMO Capital Markets LimitedJoint BrokerOffice: +44 (0) 207 236 1010Bobby Morse/Chris JuddBuchanan CommunicationsPublic & Investor Relations UKOffice: + 44 (0) 207 466 5000
Julian GwillimAprio Strategic CommunicationsPublic & Investor Relations SAOffice: +27 (0)11 880 0037 www.panafricanresources.com
Date   Source Headline
5th Jun 20269:00 amPRNDirector/PDMR Shareholding
2nd Jun 20264:15 pmPRNHolding(s) in Company
1st Jun 20267:00 amPRNOperational Update ahead of year ending 30 June 2026
22nd May 20269:00 amPRNCapital Reduction
15th May 20261:00 pmPRNDirector/PDMR Shareholding
8th May 202610:30 amPRNUpdate on proposed acquisition of  Emmerson Resources
28th Apr 20263:30 pmPRNCapital Reduction Court Approval
20th Apr 20263:45 pmPRNDirector/PDMR Shareholding
10th Apr 202611:30 amPRNHolding(s) in Company
26th Mar 20261:30 pmPRNResults of General Meeting & Salient Dates
23rd Mar 20269:00 amPRNDirector/PDMR Shareholding
20th Mar 20261:15 pmPRNHolding(s) in Company
17th Mar 20269:00 amRNSDirector/PDMR Shareholding
17th Mar 20269:00 amPRNDirector/PDMR Shareholding
9th Mar 20267:00 amPRNPan African to acquire Emmerson Resources
25th Feb 20267:00 amPRNHolding(s) in Company
18th Feb 20267:00 amPRNUnaudited Condensed Consolidated Interim Financial Results for the six months ended December 2025
17th Feb 20267:00 amPRNProposed Capital Reduction & Notice of General Meeting
11th Feb 20267:00 amPRNGroup Trading Statement for the six months ended 31 December 2025 (current reporting period)
26th Jan 20267:00 amPRNOperational Update for the half-year ended December 2025 (H1FY26) & Proposed Initiation of Interim Dividend
9th Jan 20263:00 pmPRNHolding(s) in Company
22nd Dec 20258:00 amRNSDelay in Share Capital Reduction
22nd Dec 20258:00 amPRNDelay in Share Capital Reduction
8th Dec 202510:00 amPRNApplication for Admission
1st Dec 20253:30 pmPRNTotal Voting Rights and Issued Share Capital
27th Nov 20257:00 amPRNCompletion of Feasibility Study on Soweto Cluster Tailings Storage Facilities
20th Nov 20253:30 pmPRNResults of Annual General Meeting and Salient Dividend Dates
28th Oct 20257:00 amPRNNotice of Annual General Meeting
24th Oct 20258:00 amRNSReadmission - Pan African Resources Plc
24th Oct 20257:00 amPRNAdmission to trading on the Main Market
21st Oct 20256:00 pmRNSPan African Resources
21st Oct 202512:30 pmPRNPublication of Prospectus
21st Oct 20257:00 amPRNDirector's dealings in securities
9th Oct 202511:00 amPRNDirector/PDMR Shareholding
2nd Oct 20254:00 pmPRNHolding(s) in Company
25th Sep 20251:30 pmPRNDirector/PDMR Shareholding
25th Sep 20257:00 amPRNHolding(s) in Company
25th Sep 20257:00 amPRNHolding(s) in Company
23rd Sep 20252:30 pmPRNIntention to move from AIM to London Main Market
17th Sep 202512:15 pmPRNHolding(s) in Company
15th Sep 20254:42 pmPRNHolding(s) in Company
15th Sep 20253:30 pmPRNDirectors dealings in securities
10th Sep 20257:00 amPRNSummarised Audited Results for the year ended 30 June 2025
9th Sep 20254:15 pmPRNHolding(s) in Company
8th Sep 20257:00 amPRNIntention to move from AIM to London Main Market
4th Sep 20258:00 amPRNGroup Trading Statement for the year ended 30 June 2025 (current reporting period)
3rd Sep 20254:15 pmPRNHolding(s) in Company
3rd Sep 20253:44 pmPRNHolding(s) in Company
22nd Jul 20254:15 pmPRNHolding(s) in Company
10th Jul 20258:00 amPRNTransaction in Own Shares

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.