Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Share Price Information for Pan African Resources (PAF)

Share Price is delayed by 15 minutes
Get Live Data
108.10    -0.20 (-0.18%)
Bid:
108.10
Ask:
108.30
Spread: 0.20 (0.185%)
Market Cap: £2.19b
PAF Live PriceLast checked at - London Stock Exchange

Intraday Pan African Resources Share Chart

Manica Drill Results -Replace

20 Apr 2006 09:35

Pan African Resources PLC20 April 2006 The following amends the Manica Drill Results announcement released on 20thApril 2006 at 8:44am, under RNS number 7173B. The figure stating the Manicaverified resource should read 1.056Moz and not 1.56Moz as previously stated. 20th April 2006 Pan African Resources plc ("Pan African" or "the Company") DRILL RESULTS - MANICA GOLD PROJECT IN MOZAMBIQUE Pan African Resources plc (AIM: PAF), the African based exploration company,reports the results of a recent drilling programme completed at the Manicaproject in Mozambique. The drilling programme was undertaken to provide samples for metallurgical testwork as part of the ongoing pre-feasibly study at the Fair Bride gold prospect.A near-surface in situ resource of 852,747oz (8.47mt @ 3.13g/t) has beenindependently verified at the Fair Bride prospect with a total independentlyverified resource at Manica of 1.056Moz. The following composite intersections are highlighted, widths reported are asintersected in borehole; 19.32m @ 5.02g/t (borehole MDD001, from 66.05m - 85.37m), 17.67m @ 6.56g/t (borehole MDD002, from 98.50 - 116.17m), 12.57m @ 1.17g/t (borehole MDD003, from 105.72 - 118.29) and 9.40m @ 2.55 g/t (Borehole MDD004, from 80.65 - 90.05m). The individual results from the four boreholes drilled are tabulated below.Borehole MDD2 also intersected a previously unknown reef grading 4.88g/t over awidth of 4.09m. The metallurgical testwork is ongoing and it is expected that results will becompleted by the end of Q3 2006. Jan Nelson, CEO of Pan African commented; "The results from the infill drillinghave exceeded our expectations and will allow us to upgrade the surface tonear-surface resource at Fair Bride. We are finalising the results from therecently completed dipole-dipole geophysical survey which will form the basisfor future exploration activity at Manica. I look forward to reporting theresults of that survey in the next few weeks. The Company is gearing up for alarge exploration programme to assess Manica's potential to host a multi-millionounce gold deposit. To date we have only explored 12% of the mineralizedstrike-length, we will now turn our attention to the 88% that is unexplored." Borehole number From To Width (m) Grade (g/ Borehole number From To Width (m) Grade (g/ t) t) MDD001 66.05 67.05 1.00 10.90 MDD002 93.70 94.50 0.80
Date   Source Headline
13th Oct 20057:00 amRNSResource Upgrade
5th Oct 20057:00 amRNSJoint Venture - CAR
26th Jul 20056:00 amPRNDirectorate Change
30th Jun 20056:00 amPRNInterim Results
29th Apr 20056:00 amPRNResult of AGM
31st Mar 20056:00 amPRNFinal Results
9th Mar 20057:00 amPRNExploration Update
31st Jan 20052:26 pmRNSHolding(s) in Company
26th Jan 20057:00 amPRNExploration Update
7th Jan 20054:07 pmRNSHolding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.