Less Ads, More Data, More Tools Register for FREE

Pin to quick picksPan African Resources Regulatory News (PAF)

Share Price Information for Pan African Resources (PAF)

Share Price is delayed by 15 minutes
Get Live Data
109.80    1.50 (1.39%)
Bid:
109.70
Ask:
109.90
Spread: 0.20 (0.182%)
Market Cap: £2.23b
PAF Live PriceLast checked at - London Stock Exchange

Intraday Pan African Resources Share Chart

Exploration Update

26 Jan 2005 07:00

Embargoed: 0700hrs, 26 January 2005 Pan African Resources Plc (the "Company") Exploration Update * Significant exploration results from Ghana including 8 metres @ 5.26 g/t Au and 7 metres @ 5.90 g/t Au. * Reverse circulation drill programme suggests a duplication of the mineralized zone at West Fair Bride prospect in Mozambique. * Acquisition of new projects being investigated. Further to its announcement on 25 November 2004, Pan African Resources Plc ispleased to update shareholders on the two drilling programmes it is currentlyengaged in at the Company's exploration projects in Ghana (the Wa Gold Project)and Mozambique (the Manica Gold Project):The Company's targets in Ghana and Mozambique could each produce a resource inexcess of 1,000,000 ounces of gold.The Wa Gold Project, Ghana.The Company is currently undertaking a 6,000 metre reverse circulation drillingprogramme at the project which is designed to further test and extend the knowngold mineralization of the Julie Prospect (current inferred resource of over300,000 ounces of gold to only a shallow depth) both along strike and at depthand to increase the quality of the resource estimate.To date 1709 metres of reverse circulation drilling have been completed on thewestern end of the Julie Prospect. Initial results from drill holes completedby the end of 2004 are now available and the following table details some ofthe more significant intersections.Drill Hole Intersection To Width Grade From (m) (Au g/t) JRC 58 2 3 1 1.65 14 15 1 1.04 40 41 1 1.31 JRC 59 2 3 1 1.69 6 7 1 3.24 13 21 8 5.26 Including 4 8.10 JRC 61 28 29 1 1.94 50 53 3 1.01 JRC 62 57 60 3 1.08 JRC 64 4 6 2 6.16 JRC 87 43 45 2 1.70 JRC 88 20 27 7 5.90 Including 3 10.30All holes were drilled at an inclination of -50 degrees.The current drill programme will also further test the potential of the highlyprospective Collette Prospect.In addition to this drill programme the Company continues to reassess all ofthe extensive work completed by Kenor SA and conduct follow up explorationprogrammes both in the licence areas and regionally. A further drill programmedesigned to test these other targets is planned for later in 2005.The Wa Gold Project is located in the Upper West Region of Ghana, approximately50 km east of the regional capital, Wa and comprises three explorationlicences, Julie, Collette and Josephine, totalling 304 square kilometres.The project is situated in an area of Birimian greenstones and granites in anacurate belt, which represents the junction between the north-south trendingLawra Belt and the north-east trending Bole-Navrongo Belt.The geological setting of the project and the range of mineralization stylesidentified to date are comparable to the major Birimian hosted gold deposits inthe south of Ghana and elsewhere in West Africa.The Manica Gold Project, Mozambique.A 2004 drill programme on the Andrada (Dot's Luck - Fair Bride) zone at WestFair Bride demonstrated that mineralization is hosted by a package of chloriteschists up to 50 metres wide. Significant intersections (previously reported)were encountered over a 660 metre strike length to depths of 120 metres belowsurface.The Company is currently funding a follow up 2000 metre reverse circulationdrill programme designed to further test the West Fair Bride area and otherdrill targets (Dot's Luck, Boa Esperanca, Vinganca and Palhada) within theexploration licence.To date some 824 metres of reverse circulation drilling have been completed andsamples submitted for assay. At this time no assay results have been received,however, interpretation of the drill hole logs suggests a duplication of thecurrent mineralization in the form of a series of stacked mineralized lenses tothe north east of the previously drilled mineralization. Results will bereported as received.The Manica Project is situated at Manica, Mozambique on the east end of theOdzi-Mutare-Manica Greenstone Belt. The belt is part of the Archean ZimbabweShield and has produced more than 80 tonnes of gold to date. Manica is situatedon the Beira-Harare Corridor between Mozambique and Zimbabwe, with excellentinfrastructure, rail, power and communications.The project area comprises a large exploration licence covering the 10kilometre Mutambarico shear zone and the 7 kilometre Andrada zone of bandediron formations. Both zones contain several old mines and workings.The Manica Project is managed by Pangea Exploration with whom the Company has a"right of first refusal" for all Pangea generated African gold projects. PangeaExploration has an enviable reputation for discovering and developing mineralresource projectsNew ProjectsThe Company is currently assessing a number of opportunities to add one or moresignificant gold projects to its existing portfolio following its policy tobecome a major African based gold exploration and development company.Shareholders will be updated at the appropriate time.Roger Craddock, Managing Director, commented,"These results confirm the attractiveness of our prospects in Ghana where wehave seen some significant intersections of high grade mineralization. Our nextstep will be to process results from Mozambique and further results from Ghanabefore we are able to better determine the increase in our assets but I am mostencouraged by what we have seen so far. Furthermore we are currentlyinvestigating a number of interesting gold projects with a view to adding themto our existing portfolio." -Ends- For further information please contact,Roger CraddockManaging Director, Pan African Resources PlcTel. 07785 364 291Ben SimonsHansard CommunicationsTel. 020 7245 1100END
Date   Source Headline
21st Feb 20087:00 amPRNInteirm Results & Directorship Change
20th Feb 20087:00 amPRNStatement re Earn-in Agreement
29th Jan 20087:00 amPRNManica Gold Project, Mozambique - Drilling Update
18th Jan 200812:32 pmPRNResult of AGM
20th Dec 20077:00 amPRNFinal Results For the period ended 30 June 2007
27th Nov 20077:00 amPRNDrilling Update
19th Nov 20077:00 amPRNDrilling Update - Manica Project, Mozambique
29th Oct 20076:00 amPRNStatement re Corporate Presentation
8th Oct 20077:00 amPRNDirectorate Change
21st Sep 20077:01 amRNSCorporate Presentation
19th Sep 20077:01 amRNSIssue of Equity
11th Sep 200712:09 pmRNSCorporate Presentation
10th Sep 200710:17 amRNSResource Upgrade
7th Sep 20072:03 pmRNSHolding(s) in Company
30th Aug 200712:43 pmRNSIssue of Shares
20th Aug 20074:51 pmRNSAIM Rule 26
31st Jul 20072:29 pmRNSRe-Admission to Trading
31st Jul 20078:00 amRNSCancel - Pan African Res
27th Jul 20074:11 pmRNSResults of EGM
27th Jul 20077:01 amRNSNotification of Voting Rights
17th Jul 20077:00 amRNSDirector/PDMR Shareholding
11th Jul 200710:26 amRNSSchedule 1 - Pan African
28th Jun 20077:04 amRNSAcquisition
26th Jun 20077:02 amRNSBarberton Update
24th May 20077:15 amRNSInterim Results
11th May 20074:17 pmRNSIssue of Shares
27th Dec 20067:01 amRNSInterim Results
22nd Dec 20069:34 amRNSTotal Voting Rights
20th Dec 20068:39 amRNSSuspension-Pan African
20th Dec 20067:30 amRNSProposed Acquisition
14th Nov 20067:02 amRNSManica: independent valuation
2nd Oct 20068:36 amRNSManica metallurgical results
27th Jul 200612:15 pmRNSResult of AGM
30th Jun 20061:37 pmRNSFinal Results
20th Jun 20067:00 amRNSManica Resource Upgade
17th May 200612:23 pmRNSProject Update
20th Apr 20069:35 amRNSManica Drill Results -Replace
20th Apr 20068:44 amRNSManica Drill Results
7th Apr 20064:55 pmRNSHolding(s) in Company
5th Apr 20067:01 amRNSPan African raises GBP 1.7m
13th Mar 20067:01 amRNSNew CAR Exploration Licences
6th Mar 20067:02 amRNSCAR Project Update
2nd Feb 200612:04 pmRNSVerification of 1Moz Resource
26th Jan 20068:57 amRNSUpdate of Exploration Results
12th Jan 20067:01 amRNSDrilling Programme Commences
9th Jan 20069:18 amRNSAcquisition Manica Project
23rd Dec 20057:01 amRNSInterim Results
22nd Dec 200512:54 pmRNSPrivate Placing
22nd Dec 200512:50 pmRNSChange of Adviser
10th Nov 20057:00 amRNSCAR Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.