Less Ads, More Data, More Tools Register for FREE

Pin to quick picksMetals Exploration Regulatory News (MTL)

Share Price Information for Metals Exploration (MTL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 5.50
Bid: 5.30
Ask: 5.70
Change: 0.05 (0.92%)
Spread: 0.40 (7.547%)
Open: 5.45
High: 5.50
Low: 5.40
Prev. Close: 5.45
MTL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Updated Mineral Resource and Ore Reserve Estimate

14 Feb 2022 07:00

RNS Number : 5072B
Metals Exploration PLC
14 February 2022
 

METALS EXPLORATION PLC

 

Updated Mineral Resource and Ore Reserve Estimate

 

Metals Exploration plc (AIM: MTL) ("Metals Exploration", the "Company" or the "Group"), a gold producer in the Philippines, today provides an updated Mineral Resource Estimate and Ore Reserves Statement at its Runruno gold project ("Runruno" or the "Project") in the Philippines.

 

Summary of Report

In association with the Company's review of its mining plan for the remaining life of mine ("LOM"), the Company commissioned Robin Rankin of GeoRes Consulting to verify the Company's updated JORC compliant Mineral Resource Estimate (the "MRE") for the Runruno project. The last MRE was independently compiled in 2011 by Mining Associates.

At present, mining rates estimated in the new MRE indicates a mine life of at least five years with possible extensions through further drilling.

Orebody domains and wireframes have been updated using information obtained from 49 new diamond drill holes and the compilation of a new structural geology model. Using updated univariate statistics and variography, a new Ordinary Kriged estimate was used to generate a 10 metres x 10 metres x 5 metres Block Model of the Mineral Resource. Table 1 below shows the breakdown of the 2021 MRE by resource category.

 

Table 1: Updated 2021 Total Mineral Resource Estimate

Main Runruno

Ore

Gold

Sulphur

Resource Category

Mt

g/t

Moz

%

Mt

Measured

12.1

1.66

0.65

1.48

0.18

Indicated

9.3

1.44

0.43

1.16

0.11

Inferred

5.1

1.14

0.19

1.03

0.05

Total

26.5

1.48

1.27

1.29

0.34

 

The new drilling generally intercepted lower grades on the Western extensions of the Runruno ore body, which is in line with the actual mining outcomes experienced. Shorter ranges were used in the variograms which better reflect the style of mineralisation. The block size used in this model was reduced to 10 metres x 10 metres x 5 metres in order to better define the thinner lode structures and reduce waste dilution within the model.

Table 2 below compares the 2021 MRE to the previous official MRE release in 2011.

 

 

Table 2 - Comparison of the 2011 and 2021 Mineral Resource Estimates

 

Main Runruno

Ore

Gold

Resource Category

Mt

g/t

Moz

2011 Resource

Measured

11.2

1.88

0.68

Indicated

7

1.64

0.37

Inferred

7.5

1.44

0.35

Total

25.7

1.69

1.39

2021 Resource

Measured

12.1

1.66

0.65

Indicated

9.3

1.44

0.43

Inferred

5.1

1.14

0.19

Total

26.5

1.48

1.27

Variance

Measured

8%

-12%

-4%

Indicated

33%

-12%

16%

Inferred

-32%

-21%

-46%

Total

3%

-12%

-9%

 

The new resource model shows an increase in tonnage but at a lower grade. The net result is an overall increase of 30,000 Measured and Indicated Resource ounces.

Updated Ore Reserve Estimate

The updated 2021 MRE was used by the Company to re-optimize the open pit and calculate a new Ore Reserves Estimate for its Runruno project. This work was carried out in-house and independently verified by Xenith Consulting, compilers of the 2020 Ore Reserve estimate. Set out below are several matters that should be considered in conjunction with the Updated Ore Reserve Estimate:

· Updated structural geology and geotechnical models were used in the pit optimisation;

· Pit optimisation was based on an average 80% recovery and US$1,750/oz gold price;

· The higher gold price drove a lower economic cut-off grade of 0.53 g/t gold vs 0.56 g/t in 2020;

· Pit designs were updated based on the optimisation results to include ramps and other accesses;

· Both in-pit and ex-pit waste dumps were redesigned and optimised;

· A new life of mine schedule was developed based on the updated pit designs;

· Updated mine economics were based on the Company's internal budgets and economic models; and

· A substantial amount of mineral resource remains uneconomic due to grade, depth and/or terrain restrictions, or a combination of these factors.

 

The remaining estimated ore Reserves as verified by Xenith Consulting as at February 2022 are set out in Table 3 below:

Table 3: 2022 Ore Reserve Estimate

Reserve

Ore

Gold

Category

Mt

g/t

M Oz

Proved

-

-

-

Probable

9.94

1.35

0.43

Total

9.94

1.35

0.43

Inferred included in LOM model pit

Inferred material

0.69

1.11

0.02

 

· Mining grade dilution reduced to 20% based on model reconciliations.

· Unchanged mining recovery of 85% inclusive of a 5% mining loss.

· Measured and Indicated Resource - converted to 9.94Mt of Probable Reserve.

· 0.69Mt of Inferred resource represents 6% of the total reserve.

· LOM pit design remains economic with Inferred material included at zero grade.

Reconciliation to 2020 Ore Reserve estimate

 

The 2020 Ore Reserves estimate, prepared by Xenith Consulting in April 2020, is shown in Table 4 below.

 

Table 4: 2020 Ore Reserve Estimate

Reserve

Ore

Gold

Category

Mt

g/t

M Oz

Proved

Nil

nil

nil

Probable

11.7

1.38

0.50

Total

11.7

1.38

0.50

Inferred included in LOM model pit

Inferred material

2.7

1.21

0.10

 

While overall tonnes of ore have been depleted at a rate consistent with the available tonnes as estimated in the 2020 Ore Reserve Estimate, the updated estimated grade is lower reflecting both new drill results and mining history.

 

The Company has an ongoing resource drilling programme that will provide the basis for the next updated project Ore Reserve Estimate and an exploration program to develop extensions to the existing pit and available Ore Reserves.

 

 

Darren Bowden, CEO of Metals Exploration commented:

"The results released today demonstrate a life of mine of at least five years which, given the work that we have carried out and are undertaking we are confident can be extended.

This report shows we have an excellent project and that we have built a solid foundation from which to grow."

 

 

 

This announcement contains inside information for the purposes of Article 7 of EU Regulation 596/2014, which forms part of United Kingdom domestic law by virtue of the European (Withdrawal) Act 2018. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

- END -

 

Glossary of Key Terms

 

Cut-off grade

the lowest grade value that is included in a resource statement

g/t

grams per tonne, equivalent to parts per million

grade

relative quantity or the percentage of ore mineral or metal content in an ore body

Indicated resource

that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a reasonable level of confidence

Inferred resource

that part of a Mineral Resource for which tonnage, grade and mineral content can be estimated with a low level of confidence

JORC

The Australasian Joint Ore Reserves Committee Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves 2012 (the "JORC Code" or "the Code"). The Code sets out minimum standards, recommendations and guidelines for Public Reporting in Australasia of Exploration Results, Mineral Resources and Ore Reserves

Kriging

A method of interpolation which predicts unknown values from data observed at known locations. It uses the variogram to express spatial variation, and minimises the error of predicted values that are estimated by spatial distribution of the predicted values

Measured Resource

that part of a Mineral Resource for which tonnage, densities, shape, physical characteristics, grade and mineral content can be estimated with a high level of confidence. It is based on detailed and reliable exploration, sampling and testing information gathered through appropriate techniques from locations such as outcrops, trenches, pits, workings and drill holes.

Mineral Resource

a concentration or occurrence of material of intrinsic economic interest in or on the Earth's crust in such form, quality and quantity that there are reasonable prospects for eventual economic extraction. The location, quantity, grade, geological characteristics and continuity of a Mineral Resource are known, estimated or interpreted from specific geological evidence and knowledge. Mineral Resources are sub-divided, in order of increasing geological confidence, into Inferred, Indicated and Measured categories

Mt

million tonnes

oz

troy ounce (= 31.103477 grams)

Probable Reserve

the economically mineable part of an indicated, and in some circumstances, a Measured Mineral Resource. The confidence in the Modifying Factors applying to a Probable Mineral Reserve is lower than that applying to a Proven Mineral Reserve

Proven Reserve

is the highest confidence level of the economically mineable part of a Measured Mineral Resource

Reserve

the economically mineable part of a Measured and/or Indicated Mineral Resource

 

 

 

 

For further information please visit or contact:

 

Metals Exploration PLC

 

Via Tavistock Communications Limited

+44 (0) 207 920 3150

Nominated & Financial Adviser:

STRAND HANSON LIMITED

James Spinney, James Dance, Rob Patrick

+44 (0) 207 409 3494

Financial Adviser & Broker:

HANNAM & PARTNERS

Matt Hasson, Franck Nganou

+44 (0) 207 907 8500

Public Relations:

TAVISTOCK COMMUNICATIONS LIMITED

Jos Simson, Nick Elwes, Oliver Lamb

+44 (0) 207 920 3150

 

 

Web: www.metalsexploration.com

Twitter: @MTLexploration

LinkedIn: Metals Exploration

 

 

Competent Person's Statement

The information contained in this release that relates to the 2021 gold Mineral Resource Estimate is based on information compiled by Mr Vyron Leal of Metals Exploration and reviewed by Mr Robin Rankin, who is a Member of The Australasian Institute of Mining and Metallurgy and the Australian Institute of Geoscientists. Mr Rankin is a full-time employee of GeoRes Consulting. Mr Rankin has sufficient experience that is relevant to the style of mineralisation and type of deposit described in the release to qualify as a Competent Person as defined by the JORC Code, 2012 Edition. Mr Rankin consents to the inclusion of this information in the form and context in which it appears in this release.

 

The Ore Reserve Statement was compiled by Paola Tuyor of Metals Exploration and reviewed and verified by Grant Walker of Xenith Consulting. Mr Walker is a Member of The Australasian Institute of Mining and Metallurgy and is a Competent Person as defined by the JORC Code, 2012 Edition, having five years' experience that is relevant to the style of mineralisation and type of deposit described in the Report.

 

Mr Darren Bowden, a director of the Company, a Member of the Australasian Institute of Mining and Metallurgy and who has been involved in the mining industry for more than 25 years, has compiled, read and approved the technical disclosure in this regulatory announcement in accordance with the AIM Rules - Note for Mining and Oil & Gas Companies.

 

Forward Looking Statements

Certain statements relating to the estimated or expected future production, operating results, cash flows and costs and financial condition of Metals Explorations, planned work at the Company's projects and the expected results of such work contained herein are forward-looking statementswhich are based on current expectations, estimates and projections about the potential returns of the Group, industry and markets in which the Group operates in, the Directors' beliefs and assumptions made by the Directors. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by words such as the following: "expects", "plans", "anticipates", "forecasts", "believes", "intends", "estimates", "projects", "assumes", "potential" or variations of such words and similar expressions. Forward-looking statements also include reference to events or conditions that will, would, may, could or should occur. Information concerning exploration results and mineral reserve and resource estimates may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed.

 

 

 

These statements are not guarantees of future performance or the ability to identify and consummate investments and involve certain risks, uncertainties and assumptions that are difficult to predict, qualify or quantify. Among the factors that could cause actual results or projections to differ materially include, without limitation: uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from logistical, technical or other factors; the possibility that results of work will not fulfil projections/expectations and realize the perceived potential of the Company's projects; uncertainties involved in the interpretation of drilling results and other tests and the estimation of gold reserves and resources; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of environmental issues at the Company's projects; the possibility of cost overruns or unanticipated expenses in work programs; the need to obtain permits and comply with environmental laws and regulations and other government requirements; fluctuations in the price of gold and other risks and uncertainties.

 

The Company expressly disclaims any obligation or undertaking to disseminate any updates or revisions to any forward looking statements contained herein to reflect any change in the Group's expectations with regard thereto or any change in events, conditions or circumstances on which any such statements are based unless required to do so by applicable law or the AIM Rules.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
DRLFZGMZKFLGZZM
Date   Source Headline
5th Apr 20242:00 pmRNSExercise of Options, PDMR Dealing and TVR
27th Mar 20247:00 amRNSUpdate on Debt Facilities
18th Mar 20247:00 amRNSAppointment of Chairman
5th Feb 202412:01 pmRNSInvestor Presentation
24th Jan 20247:00 amRNSQuarterly Update to 31 December 2023
12th Jan 20247:00 amRNSAcquisition of Prospective Philippine Exploration
14th Dec 20232:00 pmRNSExercise of Options and Total Voting Rights
11th Dec 20237:00 amRNSReceipt of Awards
1st Dec 20237:00 amRNSAppointment of New Auditor
17th Oct 20237:00 amRNSQuarterly Update To 30 September 2023
27th Sep 20237:00 amRNSInterim Results
18th Sep 20237:00 amRNSDirector Resignation
20th Jul 20237:00 amRNSQuarterly Update to 30 June 2023
19th Jun 20234:45 pmRNSResult of AGM
22nd May 20234:30 pmRNSPosting of Annual Report and Notice of AGM
16th May 20237:00 amRNSFinal Results for the Year Ended 31 December 2022
9th May 202310:51 amRNSMine Site Incident
28th Apr 20237:00 amRNSQuarterly update to 31 March 2023
31st Jan 202311:05 amRNSSecond Price Monitoring Extn
31st Jan 202311:00 amRNSPrice Monitoring Extension
31st Jan 20237:00 amRNSQuarterly Update to 31 December 2022
9th Nov 20227:00 amRNSReceipt of Presidential Award
14th Oct 20227:00 amRNSQuarterly Update to 30 September 2022
14th Sep 20227:00 amRNSInterim Results
29th Jul 20228:56 amRNSReduction of Capital Effective
21st Jul 20227:00 amRNSUpdate on Reduction of Capital
20th Jul 20227:00 amRNSQuarterly Update to 30 June 2022
17th Jun 20223:26 pmRNSResult of AGM
16th May 20227:01 amRNSProposed Capital Reorganisation & Notice of AGM
16th May 20227:00 amRNSFinal Results for the Year Ended 31 December 2021
5th May 20227:00 amRNSAppointment of Non-Executive Director
25th Apr 20227:00 amRNSQuarterly update to 31 March 2022
14th Feb 20227:00 amRNSUpdated Mineral Resource and Ore Reserve Estimate
11th Feb 20227:00 amRNSInvestor Presentation
21st Jan 20227:00 amRNSQuarterly update to 31 December 2021
18th Oct 20217:00 amRNSQuarterly Update to 30 September 2021
20th Sep 20217:00 amRNSInterim Results for Six Months Ended 30 June 2021
1st Sep 20217:00 amRNSDirectorate Changes
27th Jul 202111:05 amRNSSecond Price Monitoring Extn
27th Jul 202111:00 amRNSPrice Monitoring Extension
27th Jul 20217:00 amRNSQUARTERLY UPDATE TO 30 JUNE 2021
1st Jul 20214:51 pmRNSHolding(s) in Company
30th Jun 20214:44 pmRNSResult of AGM
17th Jun 20212:00 pmRNSAnnual General Meeting Arrangements
7th Jun 202112:46 pmRNSPosting of Annual Report and Notice of AGM
25th May 20217:00 amRNSInvestor Presentation
21st May 20217:00 amRNSFinal Results for the year ended 31 December 2020
18th May 20217:00 amRNSUpdated Website, Presentation & Broker Research
17th May 20212:06 pmRNSSecond Price Monitoring Extn
17th May 20212:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.