A4 Assays Confirm Expansion Potential for T3

20 Dec 2018 07:00

RNS Number : 0884L
MOD Resources Limited
20 December 2018
 

20 December 2018

 

MOD Resources Limited

 

A4 Assays Confirm Expansion Potential for T3 Copper Project

 

Positive results from initial phase of drilling at A4 Dome support the Company's strategy to define additional sources of ore within the T3 Expansion Project which could increase production through the planned T3 processing plant. This is supported by an independent conceptual underground mining study at A4 Dome.

 

· 18 of 20 holes completed to date at >5km long A4 Dome all intersected copper

· Good widths and grades in both vein-hosted and NPF contact type mineralisation

· Potential at A4 Dome extends far outside the target area drilled to date

· Positive outcomes from preliminary conceptual underground mining study at A4 Dome

MOD Resources Limited ('MOD' or the 'Company') (ASX/LSE: MOD), the copper exploration and development company focused on the central Kalahari Copper Belt in Botswana, is pleased to report additional promising intersections from its initial drilling phase at the large A4 Dome. The >5km long A4 Dome forms part of the T3 Expansion Project held 70% by MOD and 30% by Joint Venture (JV) partner, Metal Tiger Plc (AIM: MTR), and lies only 8km from the 100% owned 60Mt T3 Copper Project (Figure 1).

Due to the large size of the A4 Dome, widely spaced drilling to date has tested less than one third of the prospective area (Figure 2). A combination of vein-hosted and NPF contact copper mineralisation was intersected in most holes with potential extending well beyond the initial 1,600m long target area.

In addition to substantial widths of disseminated and NPF contact mineralisation, forming a blanket below the A4 Dome, there are wide zones of vein-hosted mineralization at shallower depths in the dome (eg 52m @ 1.5% Cu & 14g/t Ag from 232.2m in MO-A4-003D announced 6 August 2018 and 42.9m @ 1% Cu & 19g/t Ag from 257.5m in MO-A4-008D announced 4 October 2018 and 15m @ 1.1% Cu & 16g/t Ag from 39m and 21m @ 1.1% Cu & 8g/t Ag from 59m in MO-A4-019D). Refer Figures 2 and 3 and Table 2 for significant intersections.

MOD's Managing Director, Julian Hanna, said:

"Recent drilling results from the A4 Dome, combined with the preliminary conceptual underground mining study, provide strong support to expand drilling along the dome and start developing it into a resource. If results continue to be positive, the A4 Dome has potential to provide substantial additional ore sources, which may lead to an increase in production levels through the proposed T3 process plant, only 8km from the A4 Dome."

"While the feasibility study for the T3 Copper Project is nearing completion, and represents a robust, long-life, stand-alone mining opportunity for the Company, the nearby A4 Dome keeps delivering good results. The large scale of the A4 Dome, and the potential to utilise capital and infrastructure planned at T3, has allowed us to consider modern, highly efficient underground mining techniques as a realistic option for A4 Dome."

 

Vein-hosted intersections extending 600m along the A4 Dome (west to east), include:

MO-A4-010D: 27m @ 1.1% Cu & 20g/t Ag from 394m downhole, including:

9m @ 2.1% Cu & 39g/t Ag from 412m downhole

MO-A4-008D: 42.9m @ 1% Cu & 19g/t Ag from 257.5m downhole, including:

3.4m @ 2.4% Cu & 41g/t Ag from 297m downhole (announced previously)

MO-A4-019D: 15m @ 1.1% Cu & 16g/t Ag from 39m downhole, and:

21m @ 1.1% Cu & 8g/t Ag from 59m downhole

MO-A4-003D: 52m @ 1.5% Cu & 14g/t Ag from 232.2m downhole, including:

15.5m @ 2.9% Cu & 42g/t Ag from 268.8m downhole (announced previously)

NPF contact intersections extending 1.4km along the A4 Dome (west to east), include:

MO-A4-020D: 31.5m @ 1% Cu & 10g/t Ag from 538m downhole, including

2.8m @ 4.9% Cu & 54g/t Ag from 566.7m downhole

MO-A4-003D: 31.2m @ 1.1% Cu & 11g/t Ag from 560m downhole, including:

5m @ 2.2% Cu & 22g/t Ag from 586.2m downhole (announced previously)

MO-A4-014D: 50.3m @ 0.9% Cu & 9g/t Ag from 451m downhole, including:

5.3m @ 1.9% Cu & 21g/t Ag from 496m downhole

MO-A4-012D: 26.6m @ 1.1% Cu & 11g/t Ag from 520m downhole, including:

6.6m @ 2.1% Cu & 25g/t Ag from 540m downhole

The initial phase of widely spaced drilling at A4 Dome was completed for a low all-in cost of ~A$2.5m.

A4 Dome Mineralisation

Two distinct types of mineralisation at A4 Dome are vein-hosted mineralisation associated with structures in the upper part of the dome and NPF contact hosted mineralisation, which appears to form a reasonably continuous blanket below the dome.

Vein-hosted mineralisation includes a recent intersection of 15m @ 1.1% Cu & 16g/t Ag from 39m and 21m @ 1.1% Cu & 8g/t Ag from 59m in MO-A4-019D. Given the very shallow depth of this mineralisation further drilling is planned to define this potential.

NPF contact mineralisation in A4 Dome occurs as a relatively shallow dipping, 3-6m wide layer of locally high-grade chalcocite mineralisation (generally between ~1.5% and ~2.4% Cu) overlain by a 15-50m wide zone of disseminated mineralisation (generally between ~0.9% and ~1.1% Cu). The NPF contact has similarities to other sediment hosted copper deposits (eg: Zambian/DRC Copper Belt) where the increasing concentration of high grade chalcocite towards the basal contact is referred to as 'bottom-loading.'

The NPF contact is the basal part of the Kalahari Copper Belt host sequence (D'Kar Formation), which overlies a distinctive red sandstone sequence (Ngwako Pan Formation).

The NPF contact is an important regional target in the Kalahari Copper Belt as it hosts substantial deposits including the 100Mt @ 2% Cu 'Zone 5' resources held by Cupric Canyon Capital, ~125km east of A4 Dome.

Conceptual Underground Study 

A preliminary, conceptual underground mining study of the A4 Dome has been undertaken by independent international underground mining consultants Entech, with inputs from one of Australia's leading underground mining service providers Barminco, a subsidiary of global mining house Ausdrill Limited.

The study evaluated a model based on developing decline access to the NPF contact, using room-and-pillar ore extraction of higher-grade contact mineralisation and long hole open stoping of the overlying, disseminated mineralisation. Room-and-pillar mining is a relatively low cost mining technique commonly used in continuous, shallow dipping orebodies.

While the underground mining study is conceptual at this stage, the Company is very encouraged by the preliminary findings and will assess the next steps to advance the A4 Dome early in 2019.

A version of the announcement containing images is available on our website at www.modresources.com.au.

-ENDS-

For and on behalf of the Board.

 

 

Julian Hanna Mark Clements

Managing Director Executive Chairman and Company Secretary

 

 

Jane Stacey Jos Simson / Emily Fenton (UK PR & IR)

AMN Corporate Tavistock

+61 412 159 433 +44 207 920 3150

jane@amncorporate.com MOD@tavistock.co.uk

 

Subscribe at: www.modresources.com.au

 

 

Figure 1: T3 Expansion Project area showing location of A4 Dome and its proximity

to the T3 Copper Project

Please see images in the full version of the announcement at www.modresources.com.au

 

 

Figure 2: Interpreted plan of A4 Dome showing current Target Area (1600m by 800m)

and main structures targeted by drilling

Please see images in the full version of the announcement at www.modresources.com.au

 

 

Figure 3: Detailed plan of current A4 Dome Target Area showing significant intersections

in initial drilling on 200m spaced sections

Please see images in the full version of the announcement at www.modresources.com.au

 

Appendix 1

Table 1: Drill hole parameters for A4 Dome drill holes discussed or included in figures in this release

Drill Hole ID

WGS84_34S_E

WGS84_34S_N

RL (m)

EOH

Azi

Dip

COLLAR

(m)

(UTM)

SURVEY

MO-A4-001D

630352

7643992

1112

517.85

150.00

-70.00

GPS

MO-A4-002D

629426.007

7643590.826

1108.757

685.40

150.00

-60.00

DGPS

MO-A4-003D

628852.560

7642948.809

1108.915

613.88

330.00

-60.00

DGPS

MO-A4-004D

628782.619

7643077.068

1108.750

525.58

330.00

-60.00

DGPS

MO-A4-005D

628927.899

7642810.925

1108.714

532.40

330.00

-60.00

DGPS

MO-A4-006D

628698.597

7642847.598

1109.029

604.60

330.00

-60.00

DGPS

MO-A4-007D

629047.657

7643045.875

1108.343

583.63

330.00

-60.00

DGPS

MO-A4-008D

628511.037

7642774.995

1108.876

610.55

330.00

-60.00

DGPS

MO-A4-009D

629218.454

7643149.463

1109.003

517.45

330.00

-60.00

DGPS

MO-A4-010D

628329.565

7642692.261

1108.801

604.50

330.00

-60.00

DGPS

MO-A4-011D

628145.082

7642595.951

1109.099

655.35

330.00

-60.00

DGPS

MO-A4-012D

629293.003

7643839.138

1108.702

568.45

150.00

-60.00

DGPS

MO-A4-013D

628577.992

7642641.479

1108.757

508.50

330.00

-60.00

DGPS

MO-A4-014D

629127.455

7642899.220

1108.755

520.63

330.00

-60.00

DGPS

MO-A4-015D

628436.012

7642905.780

1108.934

490.90

330.00

-60.00

DGPS

MO-A4-016D

628744.111

7643144.687

1108.793

320.02

160.00

-70.00

DGPS

MO-A4-017D

627283

7642095

1112

136.50 incomplete

330.00

-60.00

GPS

MO-A4-018D

628467.037

7643685.486

1108.973

508.73

150.00

-70.00

DGPS

MO-A4-019D

628716.066

7643179.024

1108.717

414.59

150.00

-70.00

DGPS

MO-A4-020D

628427.579

7642524.880

1108.817

583.80

330.00

-60.00

DGPS

 

 

 

Table 2: A4 Dome - Significant intersections for holes described in this announcement

(shaded intersections not previously announced)

 

HOLE_ID

SIGNIFICANT INTERSECTIONS

Style

Assay Status

MO-A4-001D*

0.7m @ 3.7% Cu & 69g/t Ag from 439.4m downhole

Vein

Complete

MO-A4-002D*

1.3m @ 1.3% Cu & 35g/t Ag from 420.7m downhole

Vein

Complete

MO-A4-003D

52m @ 1.5% Cu & 14g/t Ag from 232.2m downhole

Vein

Complete

Incl.

15.5m @ 2.9% Cu & 42g/t Ag from 268.8m downhole

Vein

and:

31.2m @ 1.1% Cu & 11g/t Ag from 560m downhole

NPF

Incl.

5m @ 2.2% Cu & 22g/t Ag from 586.2m downhole

NPF

MO-A4-004D

2.8m @ 1.7% Cu & 36g/t Ag from 247.6m downhole

Vein

Complete

and:

19.3m @ 1% Cu & 10g/t Ag from 485m downhole

NPF

Incl.

4.3m @ 2.3% Cu & 21g/t Ag from 500m downhole

NPF

MO-A4-005D

0.5m @ 2.1% Cu & 29g/t Ag from 412m downhole

Vein

Complete

and:

6.9m @ 1.7% Cu & 16g/t Ag from 471.1m downhole

NPF

Incl.

3.6m @ 2.4% Cu & 24g/t Ag from 474m downhole

NPF

MO-A4-006D

1m @ 2.2% Cu & 32g/t Ag from 158.9m downhole

Vein

Complete

and:

1.4m @ 1.5% Cu & 32g/t Ag from 194m downhole

Vein

Incl.

0.4m @ 3.1% Cu & 67g/t Ag from 195m downhole

Vein

and:

19.7m @ 0.9% Cu & 8g/t Ag from 561m downhole

NPF

Incl.

4.3m @ 1.4% Cu & 13g/t Ag from 563.7m downhole

NPF

MO-A4-007D

4m @ 1.8% Cu & 34g/t Ag from 240m downhole

Vein

Complete

and:

7.8m @ 1.2% Cu & 29g/t Ag from 327m downhole

Vein

Incl.

0.8m @ 6.2% Cu & 156g/t Ag from 334m downhole

Vein

and:

20.7m @ 0.9% Cu & 9g/t Ag from 530m downhole

NPF

Incl.

7m @ 1.3% Cu & 12g/t Ag from 530m downhole

NPF

Incl.

4m @ 1.5% Cu & 15g/t Ag from 546.7m downhole

NPF

MO-A4-008D

0.5m @ 11.2% Cu & 99g/t Ag from 165m downhole

Vein

Complete

and:

7.4m @ 1.3% Cu & 30g/t Ag from 230.6m downhole

Vein

and:

42.9m @ 1% Cu & 19g/t Ag from 257.5m downhole

Vein

Incl.

9.8m @ 1.4% Cu & 26g/t Ag from 264.8m downhole

Vein

Incl.

9.1m @ 1.5% Cu & 31g/t Ag from 281.9m downhole

Vein

Incl.

3.4m @ 2.4% Cu & 41g/t Ag from 297m downhole

Vein

and:

4.6m @ 1% Cu & 10g/t Ag from 369.4m downhole

Vein 

and:

15m @ 0.9% Cu & 8g/t Ag from 570m downhole

NPF 

MO-A4-009D

4.5m @ 1% Cu & 8g/t Ag from 237m downhole

Vein

Complete

Incl.

0.6m @ 3.8% Cu & 49g/t Ag from 240.9m downhole

Vein

and:

2m @ 1% Cu & 17g/t Ag from 433m downhole

Vein

and:

2.6m @ 1.1% Cu & 10g/t Ag from 452.5m downhole

Vein

and:

19.7m @ 1% Cu & 10g/t Ag from 467m downhole

NPF

Incl.

5.7m @ 1.2% Cu & 12g/t Ag from 481m downhole

NPF

MO-A4-010D

27m @ 1.1% Cu & 20g/t Ag from 394m downhole

Vein

Complete

Incl.

9m @ 2.1% Cu & 39g/t Ag from 412m downhole

Vein

and:

25m @ 0.9% Cu & 8g/t Ag from 564m downhole

NPF

Incl.

4m @ 1.7% Cu & 18g/t Ag from 585m downhole

NPF

 

HOLE_ID

SIGNIFICANT INTERSECTIONS

Style

Assay Status

MO-A4-011D

4.5m @ 1.2% Cu & 4g/t Ag from 185.8m downhole

Vein

Complete

and:

4.4m @ 1.9% Cu & 17g/t Ag from 627.6m downhole

NPF

MO-A4-012D

26.6m @ 1.1% Cu & 11g/t Ag from 520m downhole

NPF

Complete

incl:

6.6m @ 2.1% Cu & 25g/t Ag from 540m downhole

NPF

MO-A4-013D

31.4m @ 0.9% Cu & 8g/t Ag from 463.7m downhole

NPF

Complete

incl:

4.7m @ 1.6% Cu & 16g/t Ag from 490.4m downhole

NPF

MO-A4-014D

50.3m @ 0.9% Cu & 9g/t Ag from 451m downhole

NPF

Complete

incl:

5.3m @ 1.9% Cu & 21g/t Ag from 496m downhole

NPF

MO-A4-015D

8m @ 1.3% Cu & 23g/t Ag from 245m downhole

Vein

Complete

and:

21m @ 0.9% Cu & 8g/t Ag from 454m downhole

NPF

Incl:

4m @ 1.3% Cu & 12g/t Ag from 471m downhole

NPF

MO-A4-018D*

11.1m @ 0.6% Cu & 6g/t Ag from 481m downhole

NPF

Complete

MO-A4-019D*

15m @ 1.1% Cu & 16g/t Ag from 39m downhole

Vein

Partial

and:

21m @ 1.1% Cu & 8g/t Ag from 59m downhole

Vein

MO-A4-020D

9.9m @ 0.8% Cu & 7g/t Ag from 505.1m downhole

Vein

Complete

and:

31.5m @ 1% Cu & 10g/t Ag from 538m downhole

NPF

Incl:

2.8m @ 4.9% Cu & 54g/t Ag from 566.7m downhole

NPF

 

NOTES:

MO-A4-001D and MO-A4-002D: Both holes lifted and missed target

MO-A4-016D: Lifted and terminated before target

MO-A4-017D: Incomplete - shallow hole to be deepened to test target

MO-A4-018D: Low grade intersection on edge of target area

MO-A4-019D: Hole intersected shallow veins and stopped above NPF contact

 

 

About MOD Resources

 

MOD Resources Ltd (ASX/LSE: MOD) is a dual listed Australian copper company with a goal of becoming a substantial copper producer. After discovering copper in the first drill hole in March 2016, MOD is now under four months away from completion of a Feasibility Study for its 100% owned 60Mt T3 Copper Project in the central Kalahari Copper Belt, Botswana. The in-country operating company for the T3 Copper Project is Tshukudu Metals Botswana (Pty) Ltd (MOD 100%).

Total cost of discovery of T3 and delineation of the maiden resource was an exceptionally low US$1.7 million, equivalent to only US$0.22 cents/lb copper contained within the resource. After a number of resource upgrades, the total resource now comprises 60Mt @ 0.98% Cu and 13.9 g/t Ag containing ~590.3 Kt copper and 26.9 Moz silver. Results of the Pre-feasibility Study, announced on 31 January 2018 suggest a robust, long life, open pit mining and processing operation at T3 with 9 year Base Case for 2.5Mtpa production, pre-tax NPV A$370m, IRR of 39% and payback within 2.7 years. Since the announcement of the PFS, there has been a 20% increase to the Base Case process plant throughput to 3Mtpa, with allowance for staged future expansion.

In parallel with the development of the T3 Copper Project, a major exploration program is underway across a combination of 100% owned and JV licenses covering more than 11,700km2 in this under-explored region, to explore for additional resources that could be processed through the planned T3 process plant and potentially add significant value to the expanded project. JV Exploration Assets are operated by Tshukudu Exploration (Pty) Ltd, which is a wholly owned subsidiary of UK incorporated joint venture company, Metal Capital Exploration Limited, owned 70% by MOD and 30% by AIM-listed Metal Tiger Plc (AIM: MTR).

MOD's state of the art exploration techniques have developed the Company's understanding of the unique 'dome' style geology in the region. Drilling at multiple high priority exploration targets, supported by airborne electromagnetics has already proved successful in discovering encouraging copper mineralisation within the 5km long A4 Dome and the ~12km long A1 Dome which lie only 8kms and 20kms from the T3 Copper Project respectively.

There are two styles of mineralisation being tested by drilling in the domes around the T3 Copper Project; shallower high-grade vein hosted mineralisation and deeper sediment contact hosted mineralisation known as the NPF contact. NPF contact mineralisation is an important target as this contact hosts most of the substantial copper deposits located east of MOD's licences, including the ~100Mt @ 2% Cu 'Zone 5' resource planned to be mined underground by Cupric Canyon Capital.

MOD has an option to acquire MTR's interests in any new JV resource which progresses to a scoping study within three years from 15 November 2018, as well as an option to acquire all the remaining JV assets at the end of the three year period.

Competent Person's Statement

The information in this announcement that relates to Geological Data and the T3 Mineral Resource described in this release is reviewed and approved by Mr Bradley Ackroyd, BSc (Hons), Manager Mine Geology for MOD Resources Ltd. Mr Ackroyd is a registered member of the Australian Institute of Geoscientists and has reviewed the technical information in this report. Mr Ackroyd has sufficient experience, which is relevant to the style of mineralisation and type of deposit under consideration and the activity, which it is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. Mr Ackroyd consents to the inclusion in this announcement of the matters based on information in the form and context in which it appears.

No New Information

To the extent that this announcement contains references to prior exploration results and Mineral Resource estimates, which have been cross referenced to previous market announcements made by the Company, unless explicitly stated, no new information is contained. The Company confirms that it is not aware of any new information or data that materially affects the information included in the relevant market announcements and, in the case of estimates of Mineral Resources that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed.

Exploration Targets and Results

This announcement refers to Exploration Targets as defined under Sections 18 and 19 of the 2012 JORC Code. The Exploration Targets quantity and quality referred to in this announcement are conceptual in nature. There has been insufficient exploration at Exploration Targets, which include the NPF contact, A4 Dome and the T3 Expansion Project, mentioned in this announcement to define a Mineral Resource and it is uncertain if further exploration will result in the Exploration Targets being delineated as a Mineral Resource.

Forward Looking Statements and Disclaimers

This announcement includes forward-looking statements that are only predictions and are subject to risks, uncertainties and assumptions, which are outside the control of MOD Resources Limited.

Examples of forward looking statements included in this announcement are: 'Recent drilling results from the A4 Dome, combined with the preliminary conceptual underground mining study, provide strong support to expand drilling along the dome and start developing it into a resource. If results continue to be positive, the A4 Dome has potential to provide substantial additional ore sources, which may lead to an increase in production levels through the proposed T3 process plant, only 8km from the A4 Dome.' and 'While the feasibility study for the T3 Copper Project is nearing completion, and represents a robust, long-life, stand-alone mining opportunity for the Company, the nearby A4 Dome keeps delivering good results. The large scale of the A4 Dome, and the potential to utilise capital and infrastructure planned at T3, has allowed us to consider modern, highly efficient underground mining techniques as a realistic option for A4 Dome.' and 'Two distinct types of mineralisation at A4 Dome are vein-hosted mineralisation associated with structures in the upper part of the dome and NPF contact hosted mineralisation, which appears to form a reasonably continuous blanket below the dome.' and 'Vein-hosted mineralisation includes a recent intersection of 15m @ 1.1% Cu & 16g/t Ag from 39m and 21m @ 1.1% Cu & 8g/t Ag from 59m in MO-A4-019D. Given the very shallow depth of this mineralisation further drilling is planned to define this potential.' and 'While the underground mining study is conceptual the Company is very encouraged by the preliminary findings and will assess the next steps to advance the A4 Dome early in 2019.'

Actual values, results, interpretations or events may be materially different to those expressed or implied in this announcement. Given these uncertainties, recipients are cautioned not to place reliance on forward-looking statements in the announcement as they speak only at the date of issue of this announcement. Subject to any continuing obligations under applicable law and ASX Listing Rules, MOD Resources Limited does not undertake any obligation to update or revise any information or any of the forward-looking statements in this announcement or any changes in events, conditions or circumstances on which any such forward-looking statement is based.

This announcement has been prepared by MOD Resources Limited. The document contains background information about MOD Resources Limited current at the date of this announcement. The announcement is in summary form and does not purport to be all-inclusive or complete. Recipients should conduct their own investigations and perform their own analysis in order to satisfy themselves as to the accuracy and completeness of the information, statements and opinions contained in this announcement.

The announcement is for information purposes only. Neither this announcement nor information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction.

The announcement may not be distributed in any jurisdiction except in accordance with legal requirements applicable in such jurisdiction. Recipients should inform themselves of the restrictions that apply to their own jurisdiction as a failure to do so may result in a violation of securities laws in such jurisdiction.

This announcement does not constitute investment advice and has been prepared without taking into account the recipient's investment objectives, financial circumstances or particular needs and the opinions and recommendations in this announcement are not intended to represent recommendations of particular investments to particular persons.

Recipients should seek professional advice when deciding if an investment is appropriate. All securities transactions involve risks, which include (among others) the risk of adverse or unanticipated market, financial or political developments.

To the fullest extent of the law, MOD Resources Limited, its officers, employees, agents and advisers do not make any representation or warranty, express or implied, as to the currency, accuracy, reliability or completeness of any information, statements, opinion, estimates, forecasts or other representations contained in this announcement. No responsibility for any errors or omissions from the announcement arising out of negligence or otherwise is accepted.

 

 

JORC Code, 2012 Edition

Table 1 Reporting Exploration Results from Botswana Copper/Silver Project

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections)

 

Criteria

JORC Code explanation

Commentary

Sampling techniques

· Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc.). These examples should not be taken as limiting the broad meaning of sampling.

· Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

· Aspects of the determination of mineralisation that are Material to the Public Report.

· In cases where 'industry standard' work has been done this would be relatively simple (e.g. 'reverse circulation drilling was used to obtain 1m samples from which 3kg was pulverised to produce a 30g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.

 

· Drill core from A4 diamond core holes described in this announcement has been sampled in 1m intervals or as appropriate to align with the geological contacts

· All samples are geologically logged by a suitably qualified geologist on site

· Samples will be submitted to ALS Laboratories in Johannesburg

Drilling techniques

· Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc.).

· The diamond drilling referred to in this release was either drilled by HQ diameter drill core or NQ diameter drill core

 

Drill sample recovery

· Method of recording and assessing core and chip sample recoveries and results assessed.

· Measures taken to maximise sample recovery and ensure representative nature of the samples.

· Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

· Diamond drilling recorded recovery. Core recovery was good

 

 

 

 

 

 

 

 

 

Logging

· Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

· Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc.) photography.

· The total length and percentage of the relevant intersections logged.

· During the core logging geologists follow MOD's standard operating procedure for RC and Diamond logging processes. The metre interval (from and to) is recorded and the data below is described within the drill logs:

Ø Major rock unit (colour, grain size, texture)

Ø Weathering

Ø Alteration (style and intensity)

Ø Mineralisation (type of mineralisation, origin of mineralisation, estimation of % sulphides/oxides)

Ø Veining (type, style, origin, intensity)

· Data is originally recorded on paper (hard copies) and then transferred to Excel logging sheets

· Logging is semi quantitative based on visual estimation

· For diamond drilling the geological logging process documents lithological and structural information as well as geotechnical data such as RQD, recovery and specific gravity measurements

Sub-sampling techniques and sample preparation

· If core, whether cut or sawn and whether quarter, half or all core taken.

· If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

· For all sample types, the nature, quality and appropriateness of the sample preparation technique.

· Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

· Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

· Whether sample sizes are appropriate to the grain size of the material being sampled.

· All NQ diameter core samples for the drill hole intersections will be taken as half core samples. HQ diameter drill core samples will be taken as quarter core samples

· MOD takes photos of all core samples on site

· MOD has implemented an industry-standard QA/QC program. Drill core is logged, split by sawing and sampled at site. Samples are prepped at the ALS sample-prep lab onsite, bagged, labelled, sealed and shipped to ALS laboratories in Johannesburg, SA.

· At the onsite prep-lab the split for analysis is milled to achieve a fineness of 90% less than 106 µm (or a fineness of 80 % passing 75 µm. Prep QC: At least one out of every 10 samples of every batch is screened at 75µm or 106µm, whichever is applicable, to check that 80% of the material passes. The % loss for samples screened should be

· Field duplicates, blanks and standards are inserted at a ratio of 1:10. ALS also has its own internal QA/QC control to ensure assay quality

Quality of assay data and laboratory tests

· The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

· For geophysical tools, spectrometers, handheld XRF instruments, etc., the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

· Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have been established.

 

· Field duplicates, blanks and standards are inserted at a ratio of 1:10 on site

· Analysis for Cu and Ag by HF-HNO3-HClO4 acid digestion, HCl leach and ICP-AES. ME-ICP61 as well as Nonsulfide Cu by sulfuric acid leach and AAS: Cu-AA05 is standard.

· Results will be reported as down hole widths

 

 

Verification of sampling and assaying

· The verification of significant intersections by either independent or alternative company personnel.

· The use of twinned holes.

· Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic protocols).

· Discuss any adjustment to assay data.

· 15-20% QA/QC checks are inserted in the sample stream, as lab standards, blanks and duplicates

Location of data points

· Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

· Specification of the grid system used.

· Quality and adequacy of topographic control.

· The collar coordinates of the drill hole were taken by handheld GPS and later by DGPS and is reflected in Table 1 - Appendix 1

· Down hole surveys will be done on all diamond holes

Data spacing and distribution

· Data spacing for reporting of Exploration Results.

· Whether the data spacing, and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

· Whether sample compositing has been applied.

· Samples of drill core for assaying are taken throughout at a maximum of 1m intervals

Orientation of data in relation to geological structure

· Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

· If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

· Drilling planned at right angles to known strike and at best practical angle to intersect the target mineralisation at approximately right angles

Sample security

· The measures taken to ensure sample security.

· Pulps are tagged, logged and transported to ALS laboratory in Johannesburg.

Audits or reviews

· The results of any audits or reviews of sampling techniques and data.

· MOD's sampling procedure is done according to standard industry practice

 

 

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria

JORC Code explanation

Commentary

Mineral tenement and land tenure status

· Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

· The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

· PL190/2008 is a granted Prospecting Licence held by 100% by Metal Capital Limited which is owned 70% MOD Resources Ltd and 30% Metal Tiger Plc.

· It has recently been extended by the Minister of Mineral, Water and Energy until 30th September 2020.

Exploration done by other parties

· Acknowledgment and appraisal of exploration by other parties.

· Previous exploration in the A4 Dome area by other parties was confined to airborne magnetics and widely spaced soil sampling (Discovery Metals)

Geology

· Deposit type, geological setting and style of mineralisation.

 

 

 

 

· The visible copper mineralisation intersected in drill holes on PL190/2008 is interpreted to be a Proterozoic or early Palaeozoic age vein related sediment-hosted occurrence similar to other known deposits and mines in the central Kalahari Copper Belt

Drill hole Information

· A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

o easting and northing of the drill hole collar

o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar

o dip and azimuth of the hole

o down hole length and interception depth

o hole length.

· If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.

· Information relating to the diamond drill holes described in this announcement are listed in Table 1 and 2 - Appendix 1 of the release

· All diamond drill holes are surveyed

· There is no material change to this drill hole information

Data aggregation methods

· In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (e.g. cutting of high-grades) and cut-off grades are usually Material and should be stated.

· Where aggregate intercepts incorporate short lengths of high-grade results and longer lengths of low-grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

· The assumptions used for any reporting of metal equivalent values should be clearly stated.

· Significant copper and silver intersections will be compiled and reported by MOD when assay results are received from the laboratory

Relationship between mineralisation widths and intercept lengths

· These relationships are particularly important in the reporting of Exploration Results.

· If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

· If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (e.g. 'down hole length, true width not known').

 

· True widths are estimated and are subject to confirmation by further drilling

· Down hole widths are used throughout

 

Diagrams

· Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

· Figure 1: Geological plan showing T3 Expansion Project area and proximity of A4 Dome to the T3 Copper Project

· Figures 2 and 3 showing interpretation of main structural elements of A4 Dome and location of drill holes and significant intersections reported to date

Balanced reporting

· Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high-grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

· The accompanying document is considered to be a balanced report with a suitable cautionary note

 

 

 

Other substantive exploration data

· Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.

· All substantive data is reported

 

 

 

 

 

Further work

· The nature and scale of planned further work (tests for lateral, depth extensions or large-scale step-out drilling).

· Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

· Any further work on A4 Dome and PL190/2008 will be dependent on results from ongoing drill programs at A4 Dome and across the T3 Expansion Project.

 

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLFKKDQABDKABB
Date   Source Headline
23rd Oct 201910:09 amRNSSuccessful Implementation of Scheme of Arrangement
23rd Oct 201910:01 amRNSCancellation of Unlisted Options
11th Oct 201910:47 amRNSAppendix 3B
11th Oct 201910:43 amRNSSection 708A Notice
9th Oct 201911:10 amRNSSuspension from Official Quotation
9th Oct 20199:39 amRNSScheme of Arrangement Becomes Effective
9th Oct 20197:30 amRNSSuspension - MOD Resources Limited
8th Oct 20197:00 amRNSCourt Approves Scheme
4th Oct 20197:00 amRNSCancellation of Performance Rights
2nd Oct 20191:15 pmRNSChange in substantial holding
2nd Oct 20199:01 amRNSResolutions of General Meeting and Scheme Meeting
2nd Oct 20197:00 amRNSChange in substantial holding
1st Oct 201911:30 amRNSChange in substantial holding
1st Oct 20197:38 amRNSResults of Scheme Meeting
1st Oct 20197:36 amRNSResults of General Meeting
1st Oct 20197:35 amRNSUpdate on Issue of Equity and TVR and Capital
27th Sep 201911:11 amRNSBecoming a substantial holder
25th Sep 201910:59 amRNSCash-settled Equity Swap
25th Sep 20197:19 amRNSUpdate on Cash Elections from MOD shareholders
24th Sep 20198:16 amRNSDisclosure of Cash-settled Equity Swap
20th Sep 20199:15 amRNSChange in substantial holding
18th Sep 20198:59 amRNSChange in substantial holding from SFR
18th Sep 20198:57 amRNSChange in substantial holding
18th Sep 20198:56 amRNSChange in substantial holding
16th Sep 201911:23 amRNSSection 708A Notice and Appendix 3B
12th Sep 20197:37 amRNSForm 604
12th Sep 20197:34 amRNSForm 604
12th Sep 20197:32 amRNSForm 604
6th Sep 20197:35 amRNSLetter to Shareholders - Scheme Booklet
4th Sep 20197:32 amRNSAfrica Down Under Conference Presentation
4th Sep 20197:30 amRNSHalf-Year Report
4th Sep 20197:24 amRNSReplacement on Issue of Equity and TVR and Capital
2nd Sep 20197:00 amRNSUpdate on Issue of Equity and TVR and Capital
29th Aug 201911:17 amRNSDespatch of Scheme Booklet
27th Aug 20197:00 amRNST3 Mine ESIA Progresses to Public Review
22nd Aug 20199:10 amRNSForm 604
22nd Aug 20199:07 amRNSForm 604
22nd Aug 20199:06 amRNSNotice of General Meeting and Proxy Form
22nd Aug 20199:03 amRNSRegistration of Scheme Booklet
21st Aug 20197:00 amRNSUpdate on the Proposed Sandfire Transaction
1st Aug 20198:45 amRNSUpdate on Issue of Equity and TVR and Capital
30th Jul 20197:01 amRNSQuarterly Cashflow Report
30th Jul 20197:00 amRNSQuarterly Activities Report
19th Jul 20198:27 amRNSSection 708A Notice & Appendix 3B
16th Jul 201910:14 amRNSForm 603 - Becoming a substantial holder from MUFG
16th Jul 201910:07 amRNSForm 603 - Becoming a substantial holder from MS
1st Jul 20197:00 amRNSUpdate on Issue of Equity and TVR and Capital
28th Jun 20197:00 amRNSAppendix 3Y
28th Jun 20197:00 amRNSForm 603 - Becoming a substantial holder from SFR
25th Jun 20197:01 amRNSSandfire to Acquire MOD - Investor Presentation

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.