Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHerencia Resources Regulatory News (HER)

  • There is currently no data for HER

Drilling Report

5 Oct 2007 10:52

Herencia Resources PLC05 October 2007 For immediate release 5 October 2007 Herencia Resources plc ("Herencia" or the "Company") Inferred Mineral Resource Announced for Paguanta Project 70% earn-in milestone achieved Highlights: • Inferred Resource of 2.51Mt at 4.1% Zinc, 1.3% Lead and 77g/t Silver (@ 2% Zinc cut-off) • +US$2m expended on the Project - satisfies milestone for 70% earn-in • Open Pit project development potential to be investigated by Herencia Paguanta Project The Paguanta Project, located on the northern end of the Chilean Porphyry CopperBelt, is approximately 150km east of the port of Iquique and 20 km south of anational highway. The first ever drilling at Paguanta was undertaken in late 2006 with an elevenhole diamond drill program for 1,174 metres. Eight out of ten holes drilledintersected mineralisation with four holes returning higher grade zinc, silverand lead assays. Highest individual grades of 15.75% Zn, 447ppm Ag and 5.58%lead were achieved (1m samples). A 5,889m reverse circulation ("RC") drill program was then successfullycompleted in late August 2007 with 40 out of the 50 holes intersectingmineralisation, confirming the high grade zinc, silver and lead assay resultsachieved in the earlier diamond drill program. Mineral Resource The results from both the diamond and RC drill programs together with thegeological mapping and interpretation, were then modelled by ResourceEvaluations Pty Ltd ("ResEval"), an experienced Perth-based geologicalconsultancy group. The Paguanta deposit was estimated by ResEval in a standardSurpac block model using an Inverse Distance Squared (ID(2)) interpolation. Detailed resource modelling comprised of: • Definition and modelling of envelopes representing mineralised boundaries; • Statistical and Geostatistical analysis of data • Compilation of a block model representing the mineralised envelopes; • Resource estimation and confidence categorisation. The Inferred Mineral Resource estimate for Paguanta is summarised in the tablebelow: Table 1 - Inferred Mineral Resource Estimate: Total Contained MetalZn % Tonnes Zn Pb Ag Zn Metal Pb Metal Ag Cut Off Mt % % g/t Tonnes Tonnes Moz 2 2.51 4.1 1.3 77 103,100 32,100 6.18 2.5 1.96 4.6 1.5 86 90,700 28,400 5.44 3 1.45 5.3 1.7 102 76,600 24,400 4.72 4 0.74 7.1 2.4 146 52,600 18,100 3.48 Notes: • Figures used are rounded to 1 decimal place for Zn% and Pb% and to the nearest gram for Ag g/t • Bulk Density of 3.1t/m(3) for 'vein' ore, 4.08t/m3 for +10% Zn ore grades and 2.67t/m3 for the oxide. • Block cell size 5m (N-S), 25m (E-W), 5m (vertical), sub celled to 1.25m, 6.25m and 1.25m respectively . • The mineral resource estimate complies with recommendations in the Australian Code for Reporting of Mineral Resources and Ore Reserves (2004) by the Joint Ore Reserves Committee ( JORC) of the AusIMM. • The mineral resource estimate incorporates all drilling carried out to date (1,174m of diamond and 5,889m of RC) • Assays composited to 1m interval Project Earn-in Under the terms of the Agreement in relation to the Paguanta Project, US$2million of eligible expenditure was required to be spent before mid-2008 to earna 70% stake in a joint venture company which will hold the Paguanta projectlicence. Herencia has formally advised its joint venture partners of thisexpenditure milestone being achieved and work on incorporating the joint venturecompany has commenced. 12 Month Development Program Herencia's management team are now evaluating the resource report in detail andpreparing a work program for the next 12 month period. The plans and targetsfor the next 12 months include both in-fill and step-out drilling, furthergeophysical work, upgrading the resource estimate, potentially increasingresource tonnages, a Scoping Study (to include mining and processing/metallurgical components), and the commencement of baseline environmental workon site. Commenting on the results, Executive Director Michael Bohm stated "In a 10 monthperiod, Herencia has gone from collaring our first drill hole, to announcing atwo and a half million tonne Inferred Mineral Resource at the Paguanta Project. This is a significant milestone, one that provides a solid base to build on,aimed at a potential open pit mining operation at Paguanta. The managementteam are now focussed on the work required to realise that potential. I thankour personnel and shareholders for their efforts and support and look forward toa successful period ahead." Mr J Sinclair (MAusIMM) Exploration Manager (Chile) for Herencia and Mr J Clark(Consulting Geologist for ResEval) and Mr P Payne (Principal Geologist forResEval) contracted by Herencia, compiled the technical aspects of this reportrelating to the Paguanta Project. Mr Sinclair and Mr Payne have sufficientexperience that is relevant to the style of mineralisation and type of depositunder consideration and to the activity that is being reported on to qualify asa Competent Person as defined in the 2004 Edition of the Australasian Code forReporting of Mineral Resources and Ore Reserves. Mr Sinclair, Mr Clark and MrPayne consent to the inclusion in the report of the matters in the form andcontext in which it appears Mr J Sinclair, Exploration Manager (Chile) for Herencia, has reviewed theinformation contained in this announcement. Mr. Sinclair has 13 yearsexperience in the resources sector and is a qualified person within thedefinition of the AIM guidelines. Further background details on the Company and the Paguanta Project can be found at: www.herenciaresources.com Contact: MICHAEL BOHM HERENCIA RESOURCES PLC +61 8 9221 7466 DAVID YOUNGMAN WH IRELAND LIMITED +44 161 832 2174 This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
23rd Aug 20118:02 amRNSHigh Grade Drill Assay Rslts Continue at Patricia
4th Aug 201111:15 amRNSMore high grade results at Paguanta
20th Jul 20119:19 amRNSDrilling to recommence at Paguanta
8th Jul 20112:18 pmRNSProject Update
4th Jul 20118:07 amRNSUpdate on Project Activity
24th Jun 20117:50 amRNSIssue of Equity
15th Jun 201111:00 amRNSMore Copper and Silver at Doris
14th Jun 20117:00 amRNSProject Update
9th Jun 20113:17 pmRNSResult of AGM
31st May 201111:00 amRNSNew Copper-Gold Project Agreement Signed
27th May 20114:53 pmRNSHolding(s) in Company - Replacement
27th May 20112:45 pmRNSHolding(s) in Company
27th May 20117:00 amRNSProject Update
18th May 20119:55 amRNSProject Update
9th May 201110:53 amRNSProject Update
19th Apr 201110:58 amRNSFinal Results
18th Apr 201110:46 amRNSProject Update
11th Mar 20117:00 amRNSDrilling Commences at Paguanta
28th Feb 20111:34 pmRNSDrilling Update
3rd Feb 20114:12 pmRNSNew Copper-Gold Project Opportunity
31st Jan 201112:18 pmRNSTotal Voting Rights
18th Jan 201112:23 pmRNSDirector/PDMR Shareholding
12th Jan 201112:48 pmRNSDirector/PDMR Shareholding
31st Dec 20107:56 amRNSTotal Voting Rights
23rd Dec 201010:48 amRNSPaguanta Project Update
22nd Dec 20103:31 pmRNSIssue of Equity
1st Dec 20108:31 amRNSIssue of Equity
25th Nov 20108:52 amRNSProject Update - Doris Geophysical Survey
22nd Nov 201011:07 amRNSProject Update
19th Nov 20103:41 pmRNSHolding(s) in Company
16th Nov 20108:03 amRNSHolding(s) in Company
10th Nov 20102:20 pmRNSPaguanta Project Update
29th Oct 20103:33 pmRNSTotal Voting Rights
27th Oct 20102:08 pmRNSMore High Grade Copper and Silver Assays at Doris
12th Oct 201012:33 pmRNSIssue of Options
8th Oct 201011:45 amRNSHolding(s) in Company
7th Oct 20109:38 amRNSMining Inventory Upgraded for Paguanta Project
4th Oct 20109:22 amRNSHolding(s) in Company
1st Oct 20109:42 amRNSDirectors Dealings/Issue of Equity
22nd Sep 201011:51 amRNSHolding(s) in Company
22nd Sep 201010:18 amRNSDirectorate Change
17th Sep 20108:03 amRNS2010 Mineral Resource Update for Paguanta Project
10th Sep 20109:07 amRNSHigh Copper and Silver Grades Confirmed at 'Doris'
9th Sep 20103:56 pmRNSHalf Yearly Report
12th Aug 20109:10 amRNSHigh Grade Surface Copper and Silver at Paguanta
2nd Aug 20108:30 amRNSFinal Results from Drilling Program at Paguanta
23rd Jun 20103:37 pmRNSResult of AGM
23rd Jun 20107:41 amRNSContinued High Grade Intercepts
18th Jun 201010:42 amRNSDMS test work to commence on Paguanta Ore
25th May 20107:48 amRNSFurther extension to Cathedral vein at Paguanta

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.