We would love to hear your thoughts about our site and services, please take our survey here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksHelium One Regulatory News (HE1)

Share Price Information for Helium One (HE1)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.325
Bid: 1.30
Ask: 1.35
Change: 0.027 (2.04%)
Spread: 0.05 (3.846%)
Open: 1.325
High: 1.352
Low: 1.352
Prev. Close: 1.325
HE1 Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Identification of Helium Enriched Gas Shows

21 Jun 2021 07:00

RNS Number : 4753C
Helium One Global Ltd
21 June 2021
 

 

 

 

21 June 2021

 

Helium One Global Ltd

 

Identification of Helium Enriched Gas Shows in the Lake Bed Formation

 

Helium One (AIM: HE1) ("Helium One" or "the Company") is pleased to announce the presence of helium enriched gas in drilling mud (a "Gas Show") in the Lake Bed Formation while drilling Tai-1 well at the Rukwa Project (100%) in Tanzania.

Highlights:

· Helium shows identified in shallow strata from 70.5 metres

· Micro-Gas Chromatograph showing He concentrations up to 22,084ppm (2.2%) He in gas recovered from drilling mud

· Drilling operations will continue to the base of Lake Bed Formation, anticipated to be at 400 metres, before wireline logging can provide additional information

 

David Minchin, Chief Executive Officer, commented: 

"We are very excited to have identified the presence of helium in drilling mud from very shallow depth. Drilling will now continue to the base of the Lake Bed Formation at which point we will run wireline tools to obtain more detailed formation evaluation.

"Although concentrations of 2.2% He are encouraging indicators of free gas, it is important to note that a helium show is not evidence of commerciality and further evaluation is required by wireline logging to confirm any potential pay zones. It is also important to note that gas concentrations encountered in mud logging are qualitative rather than quantitative and in-situ grade may be higher or lower than what is measured.

"With over 1000 metres still to drill at Tai-1 these are early days in our exploration drilling. Early helium shows give us a great deal of optimism for the remaining programme and we look forward to providing further updates as the project develops."

 

Details

Helium One commenced exploration drilling at its flagship Rukwa Project in Tanzania at 4pm local time on Saturday 12th June. Drilling progressed slowly through soft surface sediment until conductor casing was cemented at a depth of 55 metres, allowing 24 hour 'PQ' size open hole drilling operations to commence from approximately 5pm local time on Saturday 19th June.

At approximately 6:30pm local time on Saturday 19th June, at a depth of 70.5 metres, the Helium One mud logging crew detected helium in mud at a concentration of 22,084ppm (2.2%) He. The gas show is situated at the base of a 20 metres thick shale unit and persisted at >10,000ppm (>1%) He for 4-6 meters. Readings were made on the Micro Gas Chromatograph only, which had not yet been calibrated in the field.

Drilling will continue to the Base of the Lake Bed Formation, anticipated to be at 400 metres. At this point the Company will then commence wireline logging to gain additional information on the formation reservoir characteristics and identify any potential pay zones. After logging the Lake Bed Formation, this section of the hole will be cased and drilling will continue to Basement.

Due to the poorly consolidated nature of the Lake Bed Formation encountered at Tai-1, it will not be possible to perform drill stem tests on any pay zones identified in the shallow strata in this well. This is to remove the risk of hole collapse during flow testing and ensure that Tai-1 can continue to test prospective closures at depth in the Red Sandstone and Karoo Formations.

Tai-1 is the first well in a three well programme targeting shallow structures in close proximity to the Itumbula Helium Seeps. The prospect has been chosen as our first well because of the presence of stacked targets within a well-defined structural closure. Each well is expected to take approximately one month to complete and are planned to each test a different trapping style, therefore providing information essential in de-risking our portfolio of prospects across the basin.

 

For further information please visit the Company's website: www.helium-one.com

 

Contact

Helium One Global Ltd

David Minchin, CEO

+44 20 7920 3150

Beaumont Cornish Ltd (Nominated Adviser)

James Biddle

Roland Cornish

+44 20 7628 3396

Canaccord Genuity Limited (Joint Broker)

Adam James

+44 20 7523 8000

Peterhouse Capital Limited (Joint Broker)

Lucy Williams

+44 20 7220 9792

Pello Capital (Retail Broker)

Callum Hill

+44 20 3700 2500

Tavistock (Financial PR)

Nick Elwes

+44 20 7920 3150

 

 

 

Notes to Editors

Helium One has identified a globally unique, large-scale, high-grade, primary helium project in Tanzania with the potential to become a strategic asset in resolving a supply-constrained market.

Helium One's assets are located within the rift basins on the margin of the Tanzanian Craton. Through Helium One's subsidiary companies Gogota (Tz) Limited, Stahamili (Tz) Limited and Njozi (Tz) Limited, the Company has secured 18 Prospecting Licences covering more than 4,512 km² in three distinct project areas: the Rukwa, Balangida and Eyasi projects. These are located near surface seeps with helium concentrations ranging up to 10.5% He by volume.

The Rukwa Project is located within the Rukwa Rift Basin covering 3,448km2 in south-west Tanzania. The project is considered to be an advanced exploration project and the company has identified 4 prospects and 21 leads based on historical drilling, reprocessed seismic lines, high resolution gravity survey, and surface seep analyses.

SRK Consulting have reported a 'Best Estimate' Un-risked Prospective Resource of 138 Bcf (2U/P50) for the Company's Rukwa Project, meaning that the project has potentially strategic global implications with the ability to significantly resolve helium supply/demand issues.

All Helium One's licences are held on a 100% equity basis and are in close proximity to the required infrastructure.

Helium One is listed on the AIM market of the London Stock Exchange with the ticker of HE1 and on the OTCQB in the United States with the ticker HOGLF.

 

Technical Glossary

Gas Chromatograph - A piece of analytical equipment that uses a carrier gas to separate the chemical components of a sample mixture to determine how much helium and other gasses are present

Mass Spectrometer - A piece of analytical equipment that is used to measure the mass-to-charge ratio of ions in a sample. The results are presented as a mass spectrum from which gas composition is calculated

Faulted Three Way Dip Closure - A domal structural trap faulted along a single side

Stacked Targets - A target with multiple reservoir intervals that can be tested with a single vertical well

Helium Show - Elevated amounts of helium detected in mud logging on micro gas-chromatograph or mass spectrometer

Pay Zone - A zone identified in wireline logging as a gas saturated reservoir supported by strong helium shows in mud logging

Drill Stem Test - flow testing using inflatable packers to isolate a prospective reservoir horizon and attempt to flow helium to surface

Itumbula Helium Seeps - Location where helium macro seeps have been identified at up to 10.6%He at surface

 

Technical Sign off

Lorna Blaisse, the Principal Geologist of the Company, who has over 15 years of relevant experience in the Oil and Gas Industry, has approved the information contained in this announcement. Lorna Blaisse is a fellow of the Geological Society of London and a member of Petroleum Exploration Society of Great Britain.

 

 

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCFFFIFRLIIFIL
Date   Source Headline
10th Apr 20247:00 amRNSRukwa Project update
22nd Mar 20247:00 amRNSBlocklisting Six Monthly Return
7th Mar 20247:01 amRNSForward Operational Update
7th Mar 20247:00 amRNSUnaudited Interim Results
7th Feb 20247:12 amRNSCompany raises £4.7m via a company led placing
5th Feb 20247:00 amRNSItumbula West-1 well flows helium(4.7%) to surface
26th Jan 20241:18 pmRNSHolding(s) in Company
25th Jan 20247:00 amRNSItumbula West-1 well has successfully reached TD
10th Jan 202410:59 amRNSHolding(s) in Company
8th Jan 20247:00 amRNSItumbula West-1 Commencement of Drilling
4th Jan 202412:14 pmRNSHolding(s) in Company
3rd Jan 20244:33 pmRNSHolding(s) in Company
3rd Jan 202410:30 amRNSHolding(s) in Company
3rd Jan 202410:27 amRNSHolding(s) in Company
2nd Jan 20242:51 pmRNSHolding(s) in Company
2nd Jan 20247:00 amRNSHolding(s) in Company
28th Dec 202311:56 amRNSHolding(s) in Company
27th Dec 20231:20 pmRNSHolding(s) in Company
27th Dec 20231:20 pmRNSHolding(s) in Company
22nd Dec 202312:49 pmRNSCorrection and TVR
21st Dec 20237:00 amRNSResult of Placing and Subscription Offer
20th Dec 20235:28 pmRNSProposed Placing of a minimum of £5.8 million
14th Dec 202312:35 pmRNSResult of AGM
14th Dec 20237:00 amRNSAnnual General Meeting update
5th Dec 20237:00 amRNSCompany update
30th Nov 20237:00 amRNSTotal Voting Rights
20th Nov 20237:00 amRNSTai-3 well results
15th Nov 20237:01 amRNSNotice of Annual General Meeting
15th Nov 20237:00 amRNSAudited Results for the year ended 30 June 2023
15th Nov 20237:00 amRNSOperational update
10th Nov 20237:00 amRNSOperational update
7th Nov 20237:00 amRNSTai-3 well successfully reached TD
31st Oct 20231:26 pmRNSTotal Voting Rights
30th Oct 20237:00 amRNSOperational update
16th Oct 20237:00 amRNSDrilling restarted on Tai-3 well
5th Oct 20239:19 amRNSOperational update
25th Sep 20237:33 amRNSTai-3 Commencement of Drilling
19th Sep 20237:00 amRNSBoard Appointment and Block Admission Application
12th Sep 20237:00 amRNSExercise of Options and Issue of Equity
7th Sep 20237:00 amRNSResult of Placing, Subscription and Retail Offer
31st Aug 20237:00 amRNSOperational Update – Appointment of Drill Crew
14th Aug 20237:00 amRNSOperational Update
11th Aug 20237:00 amRNSInvestor Presentation
7th Aug 20237:00 amRNSExercise of Options and Issue of Equity
4th Aug 20237:00 amRNSBoard Restructure
1st Aug 20237:00 amRNSAppointment of New Chairman & Board Changes
18th Jul 20237:00 amRNSExercise of Warrants and Issue of Equity
11th Jul 20237:00 amRNSExercise of Warrants and Issue of Equity
10th Jul 20237:00 amRNSOperational Update
7th Jul 20237:30 amRNSDrilling Rig update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.