Pin to quick picksGoldstone Resources Regulatory News (GRL)

  • This share is currently suspended. It was suspended at a price of 2.15

Share Price Information for Goldstone Resources (GRL)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 2.15
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.00 (0.00%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 2.15
GRL Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Results of Akrokerri pit definition drilling

9 Nov 2017 07:00

RNS Number : 9895V
Goldstone Resources Ltd
09 November 2017
 

9 November 2017

 

GOLDSTONE RESOURCES LIMITED

("GoldStone" or the "Company")

 

Results of Akrokerri pit definition drilling

 

GoldStone Resources Limited (AIM: GRL) announces that it has successfully completed its pit definition Reverse Circulation ("RC") drilling programme in the Southern part of the 2012 JORC compliant resource area within the 100% owned Akrokerri licence, with results continuing to confirm the expected gold content.

 

The RC drilling programme consisted of 26 holes for a total of 1,470 metres at the Akrokerri project. The programme, which is the first part of the Akrokerri open pit project, identified as AK01 North and AK01 South, confirmed the results of the historical drilling and recent trenching to further support the economic potential of the project.

 

The preliminary assessment of the RC drilling programme shows that 22 of the 26 holes intersected the mineralised zone with economic values and mining widths for the target zone - Table 1 below shows the results of the intervals that will be used for the Pit design. The four sub-economic holes (AKRC022, 23, 24 and 26) are situated at the southern end of the proposed southern pit (see Figure 1). All of the assays were undertaken by the ALS Laboratory in Kumasi, Ghana.

 

The results from two of the RC infill drillholes exceeded expectations, with AKRC018 returning 2.22g/t over 30 metre drill length between intervals 41 metres and 71 metres at a vertical depth below surface of 27 metres to 48 metres and AKRC012 returning 3.78g/t over 12 metres drill length between intervals 22 metres and 34 metres at a vertical depth below surface of 15 metres to 23 metres. In addition, hole AKRC017 delivered one of the best results on the Akrokerri licence to date, with 12.4g/t over a 1 metre length between intervals 20 metres and 21 metres at a vertical depth below surface of 13 metres.

 

Based on these assays from this RC drilling programme, the arithmetic average of the grades is 1.8 g/t over 10.5 metres drilling width (approximately 7 metres true width) within the mineralised zone of the two proposed pits (sample cut-off 0.5g/t). The continuous strike length over these two proposed pits is approximately 1,500 metres, compared to the approximately 700 metres strike length of the existing Homase pit which was mined by Ashanti Goldfields between 2002 and 2003 and produced 52,452 oz gold at an average grade of 2.85g/t.

 

A grade distribution analysis indicates a relatively disseminated pattern, no nugget effect is expected. Therefore, the grade forecast is expected to be close to the mine grade.

 

A detailed spatial analysis including an estimation of mineable resources is currently being undertaken using MicroMine software and metallurgical tests are on-going.

 

This programme has indicated that the mineralisation may split towards the South. If this is confirmed by 3D analysis, a sub- parallel second zone may be available for mining within the proposed pit.

 

Bill Trew, Chairman, commented: "We are very pleased that this programme continues to confirm our expectations of the Akrokerri deposit. We are narrowing the gaps in past drilling and improving the confidence in the resource as required in order to move towards the earliest possible development of a mine. These results are encouraging, in particular the two infill drillholes that exceeded our expectations and the extent of the near surface oxidised, mineralisation zone. We look forward to keeping you updated as we seek to move the project forward."

 

 

Table 1: 2017 RC pit definition drilling programme - Results of significant intersections that will be used for the Pit Design on AK01 North and AK01 South

 

Hole ID

Depth from (metres)

Depth to (metres)

Sample Id

g/t

Approximate True Vertical Depth (metres)

17AKRC001

17

18

Q 1319

1.12

11.4

18

19

Q 1320

0.56

12.1

19

20

Q 1321

0.84

12.7

17AKRC002

46

47

Q 1404

0.64

30.8

47

48

Q 1405

2.76

31.5

48

49

Q 1406

2.07

32.2

49

50

Q 1407

2.36

32.8

50

51

Q 1408

2.11

33.5

51

52

Q 1409

1.66

34.2

17AKRC003

31

32

Q 1453

0.94

20.8

32

33

Q 1454

1.16

21.4

33

34

Q 1455

2.00

22.1

34

35

Q 1456

1.52

22.8

17AKRC004

39

40

Q 1515

1.02

26.1

40

41

Q 1517

1.36

26.8

41

42

Q 1518

0.88

27.5

42

43

Q 1519

0.58

28.1

43

44

Q 1520

0.72

28.8

17AKRC005

64

65

Q 1601

2.14

42.9

65

66

Q 1602

1.86

43.6

66

67

Q 1603

1.26

44.2

67

68

Q 1604

1.34

44.9

17AKRC006

10

11

Q 1617

1.15

6.7

11

12

Q 1618

1.05

7.4

12

13

Q 1619

2.09

8.0

13

14

Q 1620

1.70

8.7

14

15

Q 1621

4.70

9.4

15

16

Q 1622

0.75

10.1

16

17

Q 1623

1.13

10.7

17

18

Q 1624

0.30

11.4

18

19

Q 1625

0.51

12.1

19

20

Q 1626

0.55

12.7

20

21

Q 1628

3.21

13.4

21

22

Q 1629

1.62

14.1

22

23

Q 1630

1.21

14.7

17AKRC007

13

14

Q 1678

2.58

8.7

14

15

Q 1679

1.85

9.4

15

16

Q 1680

1.25

10.1

16

17

Q 1681

1.30

10.7

17

18

Q 1682

0.97

11.4

18

19

Q 1683

3.58

12.1

19

20

Q 1684

0.86

12.7

20

21

Q 1686

0.75

13.4

21

22

Q 1687

0.57

14.1

22

23

Q 1688

0.76

14.7

23

24

Q 1689

1.31

15.4

24

25

Q 1690

0.82

16.1

25

26

Q 1691

0.99

16.8

26

27

Q 1692

2.29

17.4

27

28

Q 1693

1.85

18.1

28

29

Q 1694

1.20

18.8

17AKRC008

39

40

Q 1761

1.78

26.1

40

41

Q 1763

2.19

26.8

41

42

Q 1764

1.53

27.5

42

43

Q 1765

1.85

28.1

43

44

Q 1766

1.54

28.8

44

45

Q 1767

2.05

29.5

45

46

Q 1768

1.81

30.2

46

47

Q 1769

1.12

30.8

47

48

Q 1770

0.87

31.5

48

49

Q 1771

0.46

32.2

49

50

Q 1772

0.47

32.8

50

51

Q 1773

0.13

33.5

51

52

Q 1774

1.73

34.2

52

53

Q 1775

2.03

34.8

53

54

Q 1776

1.14

35.5

54

55

Q 1777

0.74

36.2

17AKRC009

6

7

Q 1807

0.60

4.0

7

8

Q 1808

0.37

4.7

8

9

Q 1809

0.82

5.4

9

10

Q 1810

1.09

6.0

17AKRC010

20

21

Q 1876

1.06

13.4

21

22

Q 1877

0.79

14.1

22

23

Q 1878

0.49

14.7

23

24

Q 1879

0.50

15.4

17AKRC011

18

19

Q 1941

0.79

12.1

19

20

Q 1942

2.73

12.7

20

21

Q 1944

0.66

13.4

21

22

Q 1945

0.70

14.1

17AKRC012

22

23

Q 1984

0.98

14.7

23

24

Q 1985

1.01

15.4

24

25

Q 1986

0.70

16.1

25

26

Q 1987

7.11

16.8

26

27

Q 1988

5.16

17.4

27

28

Q 1989

4.03

18.1

28

29

Q 1990

5.20

18.8

29

30

Q 1991

4.88

19.4

30

31

Q 1992

4.25

20.1

31

32

Q 1993

7.80

20.8

32

33

Q 1994

3.74

21.4

33

34

Q 1995

0.51

22.1

17AKRC013

9

10

Q 1124

0.55

6.0

10

11

Q 1125

2.43

6.7

11

12

Q 1126

1.74

7.4

12

13

Q 1127

0.95

8.0

13

14

Q 1128

1.87

8.7

14

15

Q 1129

0.75

9.4

15

16

Q 1130

0.80

10.1

16

17

Q 1131

0.80

10.7

17AKRC014

33

34

Q 1202

0.79

22.1

34

35

Q 1203

2.27

22.8

35

36

Q 1204

6.22

23.5

36

37

Q 1205

1.40

24.1

17AKRC015

7

8

Q 1254

1.24

4.7

8

9

Q 1255

2.42

5.4

9

10

Q 1256

3.56

6.0

10

11

Q 1257

1.04

6.7

11

12

Q 1258

0.72

7.4

12

13

Q 1259

0.67

8.0

13

14

Q 1260

0.43

8.7

14

15

Q 1261

0.70

9.4

15

16

Q 1262

1.09

10.1

16

17

Q 1263

0.38

10.7

17

18

Q 1264

2.20

11.4

18

19

Q 1265

2.01

12.1

19

20

Q 1266

0.60

12.7

17AKRC016

46

47

S 1154

1.71

30.8

47

48

S 1155

1.19

31.5

48

49

S 1156

1.86

32.2

49

50

S 1157

2.88

32.8

17AKRC017

1

2

S 1160

0.53

0.7

2

3

S 1161

1.18

1.3

3

4

S 1162

1.72

2.0

4

5

S 1163

1.52

2.7

5

6

S 1164

1.71

3.4

6

7

S 1165

2.00

4.0

7

8

S 1166

1.39

4.7

8

9

S 1167

0.73

5.4

9

10

S 1168

1.19

6.0

10

11

S 1169

1.61

6.7

11

12

S 1170

1.82

7.4

12

13

S 1171

2.04

8.0

13

14

S 1172

3.04

8.7

14

15

S 1173

2.54

9.4

15

16

S 1174

5.05

10.1

16

17

S 1175

3.66

10.7

17

18

S 1176

1.37

11.4

18

19

S 1177

1.44

12.1

19

20

S 1178

1.51

12.7

20

21

S 1180

12.40

13.4

21

22

S 1181

6.92

14.1

22

23

S 1182

0.75

14.7

23

24

S 1183

0.61

15.4

24

25

S 1184

0.25

16.1

25

26

S 1185

0.28

16.8

26

27

S 1186

0.56

17.4

27

28

S 1187

0.34

18.1

28

29

S 1188

2.65

18.8

29

30

S 1189

4.58

19.4

30

31

S 1190

1.13

20.1

31

32

S 1191

0.63

20.8

17AKRC018

41

42

S 1246

2.78

27.5

42

43

S 1247

4.93

28.1

43

44

S 1248

4.56

28.8

44

45

S 1249

2.55

29.5

45

46

S 1250

1.41

30.2

46

47

S 1251

0.95

30.8

47

48

S 1252

0.45

31.5

48

49

S 1253

0.11

32.2

49

50

S 1254

0.06

32.8

50

51

S 1255

0.49

33.5

51

52

S 1256

5.97

34.2

52

53

S 1257

4.36

34.8

53

54

S 1258

3.52

35.5

54

55

S 1259

0.46

36.2

55

56

S 1260

1.08

36.9

56

57

S 1261

1.59

37.5

57

58

S 1262

1.23

38.2

58

59

S 1263

1.78

38.9

59

60

S 1264

1.56

39.5

60

61

S 1266

1.23

40.2

61

62

S 1267

0.39

40.9

62

63

S 1268

0.67

41.5

63

64

S 1269

2.05

42.2

64

65

S 1270

3.92

42.9

65

66

S 1271

4.64

43.6

66

67

S 1272

6.77

44.2

67

68

S 1273

4.24

44.9

68

69

S 1274

1.07

45.6

69

70

S 1275

1.12

46.2

70

71

S 1276

0.66

46.9

17AKRC019

21

22

S 1300

3.43

14.1

22

23

S 1301

5.96

14.7

23

24

S 1302

4.09

15.4

24

25

S 1303

4.24

16.1

25

26

S 1304

5.32

16.8

26

27

S 1305

0.65

17.4

27

28

S 1306

0.61

18.1

17AKRC020

31

32

S 1398

0.72

20.8

32

33

S 1399

0.71

21.4

33

34

S 1400

2.75

22.1

34

35

S 1401

3.20

22.8

17AKRC021

15

16

S 1430

1.09

10.1

16

17

S 1431

1.00

10.7

17

18

S 1432

0.28

11.4

18

19

S 1433

1.52

12.1

19

20

S 1434

1.11

12.7

20

21

S 1436

0.64

13.4

21

22

S 1437

0.72

14.1

17AKRC025

14

15

S 1667

2.28

9.4

15

16

S 1668

0.03

10.1

16

17

S 1669

0.09

10.7

17

18

S 1670

1.22

11.4

18

19

S 1671

0.61

12.1

 

 

 

Figure 1. 2017 RC Pit Definition Drill Holes to the UTM (Universal Transverse Mercator) Co-ordinate System on the Akrokerri Licence

 

http://www.rns-pdf.londonstockexchange.com/rns/9895V_-2017-11-8.pdf

 

 

Information in this announcement has been complied and reviewed by Klaus Kappenschneider, an independent geologist with 30 years experience in gold mining, exploration and resource estimation. Klaus is a member of the Association of Professional Geoscientist of Ontario (APGO), is a Competent Person (JORC, SAMREC, PEMREC) and a Qualified Person (NI 43- 101) and accordingly, is a qualified person as required under the AIM Rules.

 

For further information, please contact:

 

GoldStone Resources Limited

Bill Trew / Emma Priestley

Tel: +44 (0)20 7830 9650

Strand Hanson Limited

Richard Tulloch / James Bellman

Tel: +44 (0)20 7409 3494

SI Capital Limited

Nick Emerson

Tel: +44 (0)1483 413 500

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR").

 

- END -

 

About GoldStone Resources Limited

 

GoldStone Resources Limited (AIM: GRL) is an AIM quoted exploration company with projects in Ghana, Senegal, and Gabon that range from grassroots to advanced exploration.

 

The Company is focused on developing the Homase-Akrokerri project in south-western Ghana, which hosts an existing 602,000 oz gold JORC Code compliant resource at an average grade of 1.77g/t, along strike from the Obuasi Gold Mine, one of the World's major gold mines with a total historical and current resource in excess of 70 million ounces of gold. It is the Company's intention to build a portfolio of high-quality gold projects in Ghana, with a particular focus on the highly prospective Ashanti Gold Belt.

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLFSUEEAFWSEFF
Date   Source Headline
11th Apr 20242:30 pmRNSPosting of Circular and Notice of AGM
10th Apr 20245:30 pmRNSDirector and Senior Management Fee Conversions
10th Apr 20244:30 pmRNSInterim Results
10th Apr 20244:20 pmRNSFinal Results
10th Apr 20247:00 amRNSConditional Fundraising and Notice of AGM
2nd Apr 20247:00 amRNSDirectorate Change and Corporate Update
1st Mar 20247:00 amRNSCorporate Update
3rd Jan 20247:00 amRNSGold Loan & Corporate Update
16th Nov 20237:00 amRNSGold Loan Update, Issue of Formal Default Notice
13th Nov 20237:00 amRNSFurther Gold Loan Update
31st Oct 20237:00 amRNSCorporate Update
2nd Oct 20237:59 amRNSGold Loan Update
2nd Oct 20237:00 amRNSGold Loan Update
19th Sep 20237:00 amRNSCorporate and Operational Update
3rd Jul 20237:30 amRNSSuspension - GOLDSTONE RESOURCES LIMITED
27th Jun 20235:15 pmRNSUpdate on 2022 Annual Report and Accounts
31st May 20237:00 amRNSOperational Update
5th Apr 20237:00 amRNSExploration Update
31st Jan 20237:00 amRNSFee Conversions
27th Jan 20238:00 amRNSIssue of £2,400,000 Convertible Loan Note
30th Dec 20227:00 amRNSOperational Update
12th Oct 20222:15 pmRNSDirector Fee Conversions
30th Sep 20229:30 amRNSInterim Results
30th Sep 20227:00 amRNSGold Loan Update
27th Sep 20227:00 amRNSUpdate on Diamond Drilling at Akrokeri, Ghana
30th Aug 20227:00 amRNSStart of Drill Programme at Akrokeri Gold Mine
24th Aug 20222:05 pmRNSResult of AGM
8th Aug 20227:00 amRNSNotice of AGM
13th Jul 20222:00 pmRNSConversion of Loan
8th Jul 20227:00 amRNSExercise of Warrants and Issue of Shares
30th Jun 20227:00 amRNSFinal Results
29th Jun 20227:30 amRNSRestoration - Goldstone Resources Limited
29th Jun 20227:00 amRNSRestoration of Trading
23rd Jun 20227:00 amRNSExercise of Warrants and Issue of Shares
10th Jun 20222:30 pmRNSStatement re. Suspension
10th Jun 202210:06 amRNSSuspension - Goldstone Resources Limited
25th Mar 202211:06 amRNSSecond Price Monitoring Extn
25th Mar 202211:00 amRNSPrice Monitoring Extension
25th Mar 20229:05 amRNSSecond Price Monitoring Extn
25th Mar 20229:00 amRNSPrice Monitoring Extension
25th Mar 20227:00 amRNSOperational and Exploration Update
17th Jan 20227:00 amRNSShipment and Loan Repayment Update
4th Jan 20227:00 amRNSUpdate re Gold Loan and Operations
2nd Dec 20217:00 amRNSIssue of Export Permit
30th Nov 20217:00 amRNSGold Production and Gold Loan Update
11th Nov 20217:00 amRNSPlacing to raise £1m
1st Nov 20212:30 pmRNSOperational Update and Loan Payment Extension
30th Sep 20217:00 amRNSInterim Results
27th Sep 20217:00 amRNSExercise of Warrants
20th Sep 202111:30 amRNSExtension of Gold Loan

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.