Infill Drilling Programme Commenced and Scoping Study Update - Toral Project, Spain

Europa Metals, the European lead-zinc explorer, is pleased to announce that, further to the Company's announcement of 28 August 2018 regarding, inter alia, the successful mobilisation to site of the combination drill rig, all of the planned Phase I Reverse Circulation ("RC") drilling on its wholly owned Toral project, northern Spain, has now been completed with samples currently being sent to external laboratories for independent assay. The RC extension drilling was designed to identify new areas of mineralisation stepping out from the existing defined JORC (2012) resource area at the project. A diamond drilling programme will now commence which will target key areas situated within the existing resource area.

The objective of the Phase II diamond infill drill programme is to increase and enhance the Company's understanding and confidence in the existing resource in areas that currently contain Inferred mineralisation as defined under the JORC (2012) code. Infill drilling will ultimately seek to upgrade the existing Inferred resources to Indicated and will form a key component of a planned future full feasibility study.

Update regarding Scoping Study Progress

Following sustained work on an initial scoping study for the Toral project, being undertaken by Addison Mining Services Limited ("AMS"), the following elements have been identified and established as development options for a potential future mining operation at the Toral site:

adoption of a cut and fill method of mining in order to reduce waste and footwall dilution;decline entry followed by a raised bore production shaft (reduced shaft cost and expenditure on raised bore commenced only at a time nearer to future production);standard two-stage flotation process - depressing the zinc and floating the lead;fully mechanised utilising an appropriate level of technology for a project of Toral's size; andrequisite permitting and environmental pathways determined and/or underway.

 

The Company is now working closely with AMS to incorporate the new data from its recent JORC (2012) resource update and other workflows in order to complete the scoping study and a further update will be provided in due course.

Laurence Read, Executive Director of Europa Metals, commented:

"The planned RC drilling has now been completed and we have commenced the next phase of our drill programme at the Toral project comprising infill diamond drilling. The majority of the key elements of the proposed mine design have been assessed and completed for a potential future mining operation at Toral and new data sets are currently being inputted to enable AMS to complete its scoping study."

 

Myles Campion, Executive/Technical Director of Europa Metals, further commented:

"Progress on the scoping study to date is narrowing our focus at Toral and is providing us the incentive to proceed, ahead of schedule, with our planned Phase II work programme. Accordingly, we have decided to initiate the diamond infill drilling work and activities which will provide the first geotechnical information at Toral."

 

For further information on the Company, please visit www.europametals.com or contact:

Europa Metals Ltd

Dan Smith, Non-Executive Director and Company Secretary (Australia)

T: +61 417 978 955

Laurence Read, Executive Director (UK)

T: +44 (0)20 3289 9923

 

Strand Hanson Limited (Nominated Adviser)

Rory Murphy/Matthew Chandler

T: +44 (0)20 7409 3494

 

Turner Pope Investments (TPI) Limited (Joint Broker)

Andy Thacker

T: +44 (0)20 3621 4120

 

Peterhouse Corporate Finance Limited (Joint Broker)

Lucy Williams/Duncan Vasey/Heena Karani

T: +44 (0)20 7469 0930

 

Sasfin Capital Proprietary Limited (a member of the Sasfin group) (JSE Sponsor)

Sharon OwensT (direct): +27 11 809 7762

 

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014.

 

 

 

Toral Lead-zinc-silver project located in the region of Castila y Leon, northern Spain

 

Summary of updated JORC (2012) Inferred Mineral resource estimate announced on 20 September 2018:

 

19Mt @ 6.9% Zn Equivalent (including Pb credits) and 24g/t Ag720,000 tonnes of Zinc, 570,000 tonnes of Lead and 14 million ounces of Silver

 

Zn Price Used: US$2,500/t US$c/lb1.13

Pb Price Used: US$2,100/t US$c/lb0.95

Ag Price Used: US$17/oz

 

The resource update identified potentially economic mineralisation ranging from surface to approximately 1,100m below surface. The new block model currently extends for a strike length of 3,300m and is still open to the east along strike and also at depth where it has not yet been closed off.

 

Cut-Off Zn Eq (PbAg)%

Tonnes (Millions)

Density

Zn_Eq (Pb)%

Zn Eq (PbAg)%

Zn %

Pb %

Ag g/t

Contained Zn Tonnes (000s)

Contained Pb Tonnes (000s)

Ag Troy Oz (Millions)

Total

6.0

10

2.8

8.7

9.3

4.8

4

30

490

420

10

5.0

14

2.8

7.7

8.3

4.4

3.5

26

620

490

12

4.0

19

2.8

6.9

7.4

3.9

3.1

24

720

570

14

3.0

23

2.8

6.2

6.7

3.5

2.8

22

800

630

16

Transitional Oxide Material

4

1.8

2.4

5

5.5

2.6

2.5

25

45

44

1.4

Unweathered Fresh Rock

4

17

2.8

7

7.6

4

3.1

23

680

530

13

 

Competent Person's statement

 

The updated Toral inferred resource estimate was prepared by Mr J.N. Hogg, MSc. MAIG Principal Geologist for AMS, an independent Competent Person within the meaning of the JORC (2012) code and a qualified person under the AIM guidance note for mining and oil & gas companies. The updated inferred resource estimate was aided by Mr R. J. Siddle, MSc, MAIG Senior Resource Geologist for AMS, under the guidance of the competent person. Mr Hogg has reviewed and verified the technical information that forms the basis of, and has been used in the preparation of, the updated mineral resource estimate and this announcement, including all analytical data, diamond drill hole logs, QA/QC data, density measurements, and sampling, diamond drilling and analytical techniques. Mr Hogg consents to the inclusion in this announcement of the matters based on the information, in the form and context in which it appears. Mr Hogg has also reviewed and approved the technical information in his capacity as a qualified person under the AIM Rules for Companies.

 

Additionally, Mr Hogg confirms that the entity is not aware of any new information or data that materially affects the information contained within the Company's previous announcements referred to herein.

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCMMMGGVDMGRZG
Date   Source Headline
30th Jul 20147:00 amRNSQuarterly Activities and Cashflow Report
11th Jun 20147:00 amRNSIndependent US$33m Mineral Asset Valuation Report
11th Jun 20147:00 amRNSASX and JSE Trading Resumes
13th May 20147:00 amRNSChange of Registered Office
8th May 20147:00 amRNSAAI Second Payment Update
2nd May 201412:30 pmRNSThe Moonlight Project - BFS Updates
29th Apr 20148:13 amRNSUpdated Mineral Resource estimate
28th Apr 20147:00 amRNSQuarterly Activities and Cashflow Report
28th Mar 201412:00 pmRNSUS$500,000 First Payment Received from AAI
18th Mar 201410:00 amRNSFinal Investment Agreement Signed with AAI
13th Mar 20142:00 pmRNSHalf Yearly Report
19th Feb 20141:00 pmRNSManaging Director Appointed
19th Feb 20141:00 pmRNSAAI Staggered Payment Agreement
11th Feb 20147:00 amRNSQuarterly Activities and Cashflow Report (Amended)
31st Jan 20147:00 amRNSQuarterly Activities and Cashflow Report
15th Jan 20147:00 amRNSAnvwar Asian Investment ("AAI") Payment Schedule
8th Jan 20147:00 amRNSExpiry of Options
19th Dec 20137:00 amRNSIssue of Equity
29th Nov 201310:06 amRNSAGM Statement
29th Nov 20137:00 amRNSAAI Due Diligence Concluded
25th Nov 20131:39 pmRNSSubstantial Shareholder Notice
21st Nov 20137:00 amRNSIssue of Equity
31st Oct 20137:00 amRNSQuarterly Activities and Cashflow Report
29th Oct 20137:00 amRNSNotice of AGM
9th Oct 20138:03 amRNSIssue of Equity
9th Oct 20138:01 amRNSCleansing Notice
2nd Oct 20133:00 pmRNSReplacement-Private Placing
2nd Oct 20139:40 amRNSPrivate Placing
1st Oct 20137:00 amRNSFinal Results
26th Sep 20132:00 pmRNSHolding(s) in Company
23rd Sep 20134:43 pmRNSUS$13.5m Investment Agreement with Anvwar
13th Sep 20131:00 pmRNSHolding(s) in Company
6th Sep 20137:00 amRNSCancellation of Share Options
5th Sep 20137:00 amRNSStatement re Share Price Movement
30th Jul 20133:22 pmRNSQuarterly Activities and Cashflow Report
30th Apr 20137:00 amRNSQuarterly Activities and Cashflow Report
3rd Apr 201312:30 pmRNSDirector/PDMR Shareholding
12th Mar 201312:00 pmRNSHalf Yearly Report
27th Feb 20137:00 amRNSProcess Engineering Agreement Signed With Danieli
8th Feb 20137:00 amRNSInfrastructure & Beneficiation Route Presentation
31st Jan 20139:00 amRNSQuarterly Activities and Cashflow Report
19th Dec 20128:01 amRNSDirector/PDMR Shareholding
19th Dec 20127:00 amRNSOperational Summary 2012
14th Dec 20127:00 amRNSIssue of Equity
30th Nov 20128:30 amRNSAGM Statement
27th Nov 20127:00 amRNSIssue of Equity
31st Oct 20127:00 amRNSQuarterly Activities and cash flow report
30th Oct 20127:00 amRNSNotice of AGM and Explanatory Memorandum
27th Sep 20127:00 amRNSFinal Results
26th Sep 20127:00 amRNSAeromagnetic Survey

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.