Mkomolo Test Pit Results

16 Dec 2014 07:00

RNS Number : 8185Z
Edenville Energy PLC
16 December 2014
 



16 December 2014

Edenville Energy plc

 

("Edenville" or the "Company")

 

 

Mkomolo Test Pit Results

 

Edenville Energy is pleased to announce positive coal quality results from the near-surface seam at Mkomolo, part of the Rukwa Coal Project, near Sumbawanga in Western Tanzania.

 

Following on from the results reported at Namwele (24 November 2014), which returned significantly better coal quality than previously attributed to the deposit, the Company is delighted to report similarly positive results from test pits excavated at Mkomolo.

 

Highlights

 

· Test Pit coal quality surpasses internal expectations

· Raw coal energy values approximately 100% higher than previously modelled

o Likely to have a material impact on project economics for both the coal mine and Power Station components of Edenville business model

· Lahmeyer India's site visit, incorporating a detailed review of infrastructure, logistics and the development timeframe, completed

· Publication of the full Power Plant Feasibility Study in Q1, 2015 remains on schedule

· "The improved coal quality will reduce the projected production costs for coal and, as a consequence, improve the economic and technical parameters of our coal to power project by reducing the cost of fuel input." - Rufus Short

 

The coal quality at Mkomolo has surpassed internal expectations, returning an average raw energy value of 15.11MJ/kg. A simple wash process (to a relative density of 1.7) increases the energy value to 24.4 MJ/kg, with a yield of approximately 45%. Sulphur washes down to an average of 3% and ash content to 19.37%, levels which sit within a manageable range for use in a coal fired Power Plant. Technical detail is reported at the end of this news release.

 

Significantly, the raw coal energy values from Namwele and Mkomolo are approximately 100% higher than previously modelled; this will have a material impact on project economics for both the coal mine and Power Station components of Edenville's business model.

 

Operational Update

 

Topographic Survey

A detailed topographic site survey of the prime mining areas at Namwele and Mkomolo along with potential sites for the location of a coal processing plant and the coal-fired Power Plant, is now complete. The survey data will be integrated into the Power Plant Feasibility Study and used to develop engineering designs for siteworks, mine plans and the accurate calculation of overburden quantities for the mining operations.

 

Power Plant Feasibility Study, Lahmeyer

The site visit by Lahmeyer India, which incorporated a detailed review of infrastructure, logistics and the development timeframe of the transmission system in Western Tanzania, is now complete.

 

The new coal quality data from Namwele and Mkomolo will be incorporated into the Power Plant Feasibility Study, with the economic model reflecting lower production costs from the coal mine and reduced fuel supply costs to the Power Station.

 

We remain on schedule for publication of the full Power Plant Feasibility Study in Q1, 2015.

 

Rufus Short, CEO of Edenville Energy commented:  "We are delighted by the results returned from our Mkomolo test pits. The confirmation of consistent high quality coal very close to surface at both Namwele and Mkomolo is outstanding news and potentially transformative for the Company and its shareholders. The improved coal quality will reduce the projected production costs for coal and, as a consequence, improve the economic and technical parameters of our coal to power project by reducing the cost of fuel input. It is worth emphasising that Edenville's Rukwa Coal Project is well advanced in terms of the costly, time-consuming technical elements needed to take a deposit into production. We have a JORC-compliant, Measured and Indicated resource of 170 million tonnes of total coal in-situ. Under the JORC code, only Resources classified as Measured or Indicated can be converted into Bankable Mine Reserves, an important consideration influencing the time and cost of project development. Both the Mkomolo and Namwele deposits also have an EIA Certificate in place, which derisks the project significantly and brings Edenville closer to the point where a Mining Licence can be issued."

 

"Our very encouraging test pit results will feed into the Power Plant Feasibility Study and the assessment of production options, and we look forward to updating shareholders with news of our progress in due course."

 

Technical detail:

 

Test pits are the optimum way to sample coal that lies close to surface, allowing a specific seam to be exposed, examined and sampled. Four test pits were excavated at Mkomolo targeting the top seam along a strike length of 2.4kms, to expose the near-surface coal. The excavation and sampling work was carried out by Edenville personnel with full quality control processes and procedures in place.

 

This near-surface coal seam has an average thickness of 1.60m and was sampled to a maximum depth from surface of 4.96 m, with an average depth from surface of 2.53m.

 

The samples from the four test pits at Mkomolo have been analysed at Alfred H Knight's ('AHK') laboratory in Scotland, UK. The first test results from Mkomolo are presented below, with the sampling analysis from Muze expected to be announced in January 2015. The results shown in Table 1 below show the combined raw coal analysis and the washed results at a Relative Density ('RD') of 1.7 for the Mkomolo test pits.

 

Table 1 - Raw Coal Analysis (Air Dried Basis)

 

Sample

Inherent Moisture (%)

Ash

(%)

Volatile

Matter (%)

Sulphur

(%)

Gross Calorific Value(Mj/Kg)

5526

3.30

50.10

17.90

1.96

13.28

5527

7.70

40.40

22.70

5.19

15.66

5528

8.00

35.00

24.30

3.87

17.53

5531

4.50

46.80

19.10

4.19

13.96

Average

5.88

43.08

21.00

3.80

15.11

 

Table 2 - Floats Basis Float and Sink Coal Analysis (Air Dried), 'Washed Coal'

 

 

Sample

Mass (g)

Yield (%)

R.D.

Inherent Moisture (%)

Ash

(%)

Volatile

Matter (%)

Sulphur

(%)

Gross Calorific Value (Mj/Kg)

5526

3922.5

29.75

F1.70

2.89

25.00

27.63

2.28

23.04

5527

7304.0

52.76

F1.70

5.59

17.34

35.75

4.25

25.14

5528

8995.7

65.80

F1.70

7.21

15.52

32.66

2.84

25.33

5531

3811.8

31.49

F1.70

2.73

26.53

26.77

2.60

22.45

Average

6008.5

44.95

F1.70

5.30

19.37

31.85

3.14

24.44

 

 

Note that the improved coal quality applies to the near surface seam which was exposed across its width and sampled. The original quality data, reported in the SMS Resource Report (March 2013) applies to the entire coal measures sequence that comprises 'bar code coal' that can include barren shales and sandstone between the coal sequences.

 

Mkomolo Block FB5, from which the samples were taken, lies at the southern end of the Mkomolo deposit and sampling was conducted over a 2.4km strike. The entire Mkomolo deposit is over 8.5km in length. Whilst localised variations in quality may exist over the 8.5km, previous test work that coal quality suggests the coal is reasonably consistent in the Mkomolo deposit. We therefore expect coal to the north of the test pits to demonstrate similar quality characteristics to the test pit results.

 

Qualified Person Review

 

Mark J. Pryor, Pr.Sc.Nat. has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as defined by the AIM Rules and National Instrument 43-101 Standards of Disclosure for Mineral Projects.

 

Enquiries:

 

Edenville Energy plc

+44 (0)20 7653 9850

Sally Schofield - Chairman

 

Cantor Fitzgerald Europe (Nominated Adviser and Broker)

+44 (0) 207 894 7000

Stewart Dickson / Jeremy Stephenson

 

Newgate Threadneedle (Financial PR)

+44 (0) 207 653 9850

Roddy Watt / Edward Treadwell

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCLLFFRFTLELIS
Date   Source Headline
8th Jul 20157:00 amRNSRecent Meetings in Tanzania
2nd Jul 20153:05 pmRNSExercise of Warrants
1st Jul 201510:07 amRNSSubmission of Mining Licence
1st Jul 20157:00 amRNSExercise of Warrants
23rd Jun 201512:00 pmRNSResult of AGM
23rd Jun 20157:00 amRNSMining Licence Application
9th Jun 20157:00 amRNSExercise of Warrants
3rd Jun 20157:00 amRNSBoard Reorganisation
29th May 20154:28 pmRNSNotice of AGM
27th May 20157:01 amRNSProject Update
27th May 20157:00 amRNSFull Year Results
12th May 20157:01 amRNSExploration Programme and Project Update
12th May 20157:01 amRNSTermination of Darwin Facility
23rd Apr 20157:00 amRNSCompletion of £250,000 Placing
15th Apr 20157:00 amRNSProject and Company Update
2nd Mar 20157:00 amRNSPOWER PLANT FEASIBILITY STUDY
21st Jan 201512:01 pmRNSCorrection: Mkomolo and Muze Test Pit Results
21st Jan 20157:00 amRNSMkomolo and Muze Test Pit Results
16th Dec 20147:00 amRNSMkomolo Test Pit Results
1st Dec 20147:00 amRNSStrategy Update
24th Nov 20147:00 amRNSNamwele Test Pit Results
18th Nov 20144:40 pmRNSHolding(s) in Company
11th Nov 20147:00 amRNSDirectorate Change
10th Nov 20147:00 amRNSHolding(s) in Company
5th Nov 20147:00 amRNSFeasibility Study and Working Capital Placing
19th Sep 20147:00 amRNSInterim Results
1st Jul 20147:00 amRNSEnvironmental Impact Assessment Certificate
27th Jun 201411:10 amRNSResult of AGM
19th Jun 20147:00 amRNSPlacing & Issue of Equity
17th Jun 20144:40 pmRNSSecond Price Monitoring Extn
17th Jun 20144:35 pmRNSPrice Monitoring Extension
11th Jun 20147:00 amRNSExpression of Interest signed
4th Jun 20149:00 amRNSNotice of AGM
3rd Jun 20147:00 amRNSResults for the Year Ended 31 December 2013
3rd Apr 201410:30 amRNSEdenville at UK Ivestor Show
26th Mar 20147:00 amRNSOperational Update
24th Jan 20145:31 pmRNSHolding(s) in Company
24th Jan 201411:31 amRNSTR-1 Disclosure Form
22nd Jan 201410:40 amRNSHolding(s) in Company
21st Jan 20144:35 pmRNSPrice Monitoring Extension
21st Jan 20142:27 pmRNSTR-1 Disclosure Form
20th Jan 20145:32 pmRNSHolding(s) in Company
20th Jan 20141:05 pmRNSHolding(s) in Company
17th Jan 20147:00 amRNSChange of Adviser
17th Jan 20147:00 amRNSCompletion of £1 million Placing
16th Jan 20144:40 pmRNSSecond Price Monitoring Extn
16th Jan 20144:35 pmRNSPrice Monitoring Extension
3rd Jan 20149:43 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9th Dec 20133:27 pmRNSTR-1 Notification of Major Interest in Shares
3rd Dec 201311:08 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.