Less Ads, More Data, More Tools Register for FREE

Pin to quick picksEDL.L Regulatory News (EDL)

  • There is currently no data for EDL

Exploration Programme and Project Update

12 May 2015 07:01

RNS Number : 8464M
Edenville Energy PLC
12 May 2015
 

12 May 2015

Edenville Energy plc

("Edenville" or the "Company")

Exploration Programme and Project Update

Following the announcement of successful raising of funds on 23 April 2015, the next stage of Edenville's relatively low-cost, high value exploration programme will begin shortly. The primary aim of the programme is to better define extensions to Edenville's Rukwa Coal Project, already known to host 171 million tonnes of Measured and Indicated coal, sufficient to support a 120MW power station over the life of the project. 

Edenville's recently announced Power Plant Feasibility Study (see announcement dated 2 March 2015) outlined the potential to scale up the Power Station beyond 120MW (Phase 1) as the power demand increases over time, and this exploration work will delineate prime targets for the future expansion of the coal resource. 

The exploration programme builds on the results from the 2014 ground magnetic survey, conducted across Namwele, Mkomolo and Muze; the three deposit areas which comprise Edenville's Rukwa Coal Project. The 2014 work programme tested the possibility of additional areas of near-surface coal within the larger Mkomolo basin and better defined the edges of the coal-bearing basins which are overlain by recent alluvial sediments and not exposed at surface.

The majority of the 2014 magnetic survey data was good quality, although a small portion of the NE grid needs some additional survey work to further define structures.

The processed data set revealed the following:

1) The western edge of the Mkomolo basin is further west than originally mapped. The basin maybe larger than originally thought and has the potential to contain a larger area of coal measures. 

2) The Namwele basin is well defined but further lines will be placed to the west and east of the existing grid in order to confirm the western fault contact and throw, to give a better understanding of where additional coal measures may lie.

3) At Muze the western limit of coal measures is well defined; further magnetic surveying to define the southern and northern portions of the Muze Basin will assist in the planning of any future drilling programme targeting the historical 60 million tonnes of coal resource.

In summary, this exploration programme is a relatively low-cost exercise which is expected to generate significant information relating to the potential for additional coal, west of the existing Measured and Indicated Coal Resource of 160 million tonnes at Namwele and Mkomolo and extensions to the Muze deposit, currently host to a 11 million tonnes Measured and Indicated Coal Resource.

Project Update:

The Mining Licence application requires several areas to be defined and presented as part of the application process. These areas include a Mine Plan, CSR Policy, a Procurement Plan and an Employment Plan. 

With regard to the Mine Plan, pit shells have been generated by Sound Mining Systems (SMS), our Johannesburg based mining specialist consultants, for a range of mining options and the selection of appropriate outlines for mining is in progress. Stage Designs will then be completed to feed into the Mining Licence application. 

The Employment Plan, CSR Policy and Procurement Plan are being developed in parallel with the Mine Plan and will be refined to match the final mining option, once finalised.

We continue to work closely with Tansheq, our Environmental Management and Mining Services consultants based in Dar es Salaam, and continue to make good progress compiling the key components of the Mining Licence application, ready for submission later in Q2 2015.

Rufus Short, CEO of Edenville plc commented, "We are pleased to be embarking on the next stage of our exploration programme which is expected to better delineate our already substantial coal resource. The Mining Licence application process is on schedule and we look forward to submitting the application before the end of June. "

Qualified Person Review

Mark J. Pryor, Pr.Sc.Nat. has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as defined by the AIM Rules and National Instrument 43-101 Standards of Disclosure for Mineral Projects.

 

Contact

 

Edenville Energy Plc

Rufus Short - CEO

+44 (0) 20 7652 9788

Cantor Fitzgerald Europe

(Nominated Advisor and Corporate Broker)

Stewart Dickson

Jeremy Stephenson

 

+44 (0) 20 7894 7000

IFC Advisory

(Financial PR and IR)

Tim Metcalfe

Graham Herring

+44 (0) 20 3053 8671

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCABMMTMBTBTFA
Date   Source Headline
20th Dec 20167:00 amRNSBulk Sampling Results for Namwele
14th Dec 20167:00 amRNSRukwa Coal to Power Project Update
5th Dec 20167:00 amRNSAdditional Bulk Sampling Results
15th Nov 20167:00 amRNSBulk Sampling Results
3rd Nov 20163:50 pmRNSExercise of Warrants
2nd Nov 20161:53 pmRNSHolding(s) in Company
2nd Nov 20167:00 amRNSDirectorate Change
1st Nov 20167:00 amRNSResource Technical Assessment and Project Update
19th Oct 20163:15 pmRNSIssue of Equity
29th Sep 20167:00 amRNSPlacing to raise £500,000
27th Sep 20167:00 amRNSBulk Sampling Update
21st Sep 20167:00 amRNSUpdated Financial Model
16th Sep 20167:00 amRNSInterim Results for the Six Months to 30 June 2016
1st Sep 20167:00 amRNSNew Investor Presentation
31st Aug 20164:05 pmRNSTotal Voting Rights
30th Aug 201611:19 amRNSResult of General Meeting
24th Aug 20167:00 amRNSAppointment of Chairman
18th Aug 20167:00 amRNSInvestor Evening
15th Aug 20167:00 amRNSAnnouncement by Tanzanian MEM
12th Aug 20167:00 amRNSShare Capital Reorganisation
22nd Jul 20167:00 amRNSMEM and Tanesco Site Visit
13th Jul 20167:00 amRNSRukwa Coal to Power Project Update
14th Jun 20167:00 amRNS£432,500 Subscription
3rd Jun 201612:40 pmRNSResult of AGM
27th May 20167:00 amRNSPower Project Update
25th May 20167:00 amRNSChange of Adviser
18th May 20167:00 amRNSProject Update
11th May 20162:30 pmRNSNotice of AGM
10th May 20167:00 amRNSFull Year Results
27th Apr 20167:00 amRNSProject and Licence Update
8th Apr 20167:00 amRNSResignation of Director
31st Mar 20167:00 amRNSProject Update
3rd Mar 20167:00 amRNSFormal Grant of Mining Licence
2nd Mar 20167:00 amRNS£400,000 Subscription
24th Feb 201610:00 amRNSGranting of Mining Licence
8th Feb 20167:00 amRNSProject Update
11th Jan 20167:00 amRNSRukwa Coal to Power Project update
2nd Dec 20157:00 amRNSCompletion of £250,000 Placing
1st Dec 20157:00 amRNSCollaboration Agreement with EPC Contractor
1st Oct 20157:00 amRNSMining Licence Application Update
23rd Sep 20157:00 amRNSInterim Results
23rd Sep 20157:00 amRNSMining Licence Update
8th Sep 20157:00 amRNSCoal to Power Project Update
27th Aug 20157:01 amRNSExploration Update
26th Aug 201512:50 pmRNSExercise of Warrants
3rd Aug 20157:00 amRNSCompletion of £250,000 Placing
28th Jul 20157:00 amRNSProject Update
21st Jul 201510:30 amRNSCorrection: Exercise of Warrants
16th Jul 201510:14 amRNSExercise of Warrants
15th Jul 20157:00 amRNSPower Plant Feasibility Review Process

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.