Brian Goodman, CEO of Golden Matrix Group Inc. explains how they stay one step ahead of their rivals. Watch the interview here.

Less Ads, More Data, More Tools Register for FREE
Sponsored Content
Sponsored Content

Pin to quick picksEDL.L Regulatory News (EDL)

  • There is currently no data for EDL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Correction: Mkomolo and Muze Test Pit Results

21 Jan 2015 12:01

RNS Number : 7606C
Edenville Energy PLC
21 January 2015
 



21 January 2015

Edenville Energy plc

 

("Edenville" or the "Company")

 

 

Correction: Mkomolo and Muze Test Pit Results

 

Correction - This announcement replaces the one released at 07:00 this morning. This announcement correctly states that, in Rufus Short's quote, "The Power Plant Feasibility Study is on course for completion in Q1 2015…" rather than in Q1 2014.

 

Please see the full amended release below.

 

 

21 January 2015

Edenville Energy plc

 

("Edenville" or the "Company")

 

 

Mkomolo and Muze Test Pit Results

 

Edenville Energy is pleased to announce the final two sets of coal quality results from the near-surface seams at Mkomolo and Muze, part of the Rukwa Coal Project, near Sumbawanga, in Western Tanzania.

 

Following the results reported at Mkomolo (16 December 2014), which returned significantly better coal quality than previously attributed to the deposit, the Company is pleased to report the final tranche of results which further confirm the presence of high quality, near surface coal across the Rukwa Coal Project.

 

 

Mkomolo

 

Previously, sample 5528 from Mkomolo (reported December 16, 2014) was taken across a visually distinctive, near surface coal seam. A second sample (5529) was taken across the same coal horizon but also included an upper layer of weathered coal and carbonaceous mudstone previously excluded from testing.

 

This second test was designed to determine the effect of bulk extraction of the entire coal horizon as opposed to extraction of a visually defined coal seam.

 

The results, which include the weathered coal and carbonaceous mudstone, are very positive; the combined sample returned an energy value of 14.56MJ/kg across a 2.31m horizon, which includes the 1.1m of 17.53MJ/kg coal previously reported for sample 5528.

 

These sample results illustrate that coal measures which include weathered material could contain sufficient energy value to add tonnage, without significant reduction in calorific value, to the near surface coal seams with the potential to improve project economics.

 

Detailed samples analysis is reported at the end of this news release.

 

Muze

 

A single sample was taken at Muze, through a coal seam with a thickness of 1.66m, exposed in a stream cutting at surface.

 

The Muze coal sample gave a raw energy value of 15.26MJ/kg, 50% higher than previous estimates for the deposit as a whole. A simple wash process, to a Relative Density of 1.7, increased the energy value to 22.13MJ/kg, with a yield of 55%.

 

Mirroring the situation at Mkomolo and Namwele, the results from Muze indicate the uppermost seam is of a quality sufficient to supply coal to a coal-fired power plant, with improved project economics due to increased energy value.

 

The sulphur content in this sample was high, at approximately 7% raw value. However, this was known to be a high-sulphur pocket and the sample location was selected due to its ease of access and existing outcrop. The average sulphur level from drilling work in the 2013 Resource Report indicated average levels of sulphur below 3% and we consider this to be more representative of the Muze deposit as a whole.

 

 

Full analysis is reported at the end of this news release.

 

Rufus Short, CEO of Edenville Energy commented: "This latest set of results concludes the current test work programme. We are very pleased with the results from the test pit samples at our Rukwa deposit and consider the values in all pits to both confirm commercial grade coal near to surface and to indicate significant upside potential for the deposit as a whole.

 

This round of testwork confirms the near-surface coal seams have a specification which is better than that originally reported in the 2013 Resource Report. Additionally, the higher than expected calorific values returned from the weathered coal at Mkomolo indicate increased tonnage of useable coal and an improved quality of the resource's calorific values.

 

The test pit results are now being reviewed alongside the assessment of the production options in the context of the Power Plant Feasibility Study being undertaken by Lahmeyer India. The Power Plant Feasibility Study is on course for completion in Q1 2015 and we look forward to updating shareholders with news in due course.

 

Technical detail:

 

Test pits are the optimum way to sample coal that lies close to surface, allowing a specific seam to be exposed, examined and sampled. Four test pits were excavated at Mkomolo targeting the top seam along a strike length of 2.4kms, to expose the near-surface coal. One test pit was excavated in Muze deposit. The excavation and sampling work was carried out by Edenville personnel with full quality control processes and procedures in place.

 

 

The remaining sample from the four test pits at Mkomolo and the one test pit at Muze have been analysed at Alfred H Knight's ('AHK') laboratory in Scotland, UK.

 

 

 

 

Table 1 - Raw Coal Analysis (Air Dried Basis)

Mkomolo

 

Sample

Inherent Moisture (%)

Ash

(%)

Volatile

Matter (%)

Sulphur

(%)

Gross Calorific Value(Mj/Kg)

5528 Mkomolo From Nov 214 - Sample Width 1.09

8.00

35.00

24.30

3.87

17.53

5529 Mkomolo - Sample Width 2.31

8.30

39.70

23.00

2.69

14.56

 

 

 

 

Muze

 

Sample

Inherent Moisture (%)

Ash

(%)

Volatile

Matter (%)

Sulphur

(%)

Gross Calorific Value(Mj/Kg)

5530 Muze

Sample Width 1.66

8.60

38.10

25.90

6.94

15.26

 

 

Table 2 - Floats Basis Float and Sink Coal Analysis (Air Dried), 'Washed Coal'

 

Mkomolo

 

Sample

Mass (g)

Yield (%)

Relative Density

Inherent Moisture (%)

Ash

(%)

Volatile

Matter (%)

Sulphur

(%)

Gross Calorific Value (Mj/Kg)

5528 Mkomolo From Nov 2014 - Sample Width 1.09

8995.7

65.80

1.7

7.21

15.52

32.66

2.84

25.33

5529 Mkomolo - Sample Width 2.31

6346.2

52.30

F1.70

4.50

18.00

32.70

2.42

24.07

 

Muze

 

Sample

Mass (g)

Yield (%)

Relative Density

Inherent Moisture (%)

Ash

(%)

Volatile

Matter (%)

Sulphur

(%)

Gross Calorific Value (Mj/Kg)

5530 Muze - Sample Width 1.66

7576.0

55.90

F1.70

5.10

23.20

32.40

5.87

22.13

 

Note that the improved coal quality applies to the top near surface seam which was exposed across its width and sampled. The original quality data, reported in the SMS Resource Report (March 2013) applies to the entire coal measures sequence that comprises 'bar code coal' that can include barren shales and sandstone between the coal sequences.

 

Mkomolo Block FB5, from which the samples were taken, lies at the southern end of the Mkomolo deposit and sampling was conducted over a 2.4km strike. The entire Mkomolo deposit is over 8.5km in length. Whilst localised variations in quality may exist over the 8.5km, previous test work that coal quality suggests the coal is reasonably consistent in the Mkomolo deposit. We therefore expect coal to the north of the test pits to demonstrate similar quality characteristics to the test pit results.

 

Qualified Person Review

 

Mark J. Pryor, Pr.Sc.Nat. has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as defined by the AIM Rules and National Instrument 43-101 Standards of Disclosure for Mineral Projects.

 

Enquiries:

 

Edenville Energy plc

+44 (0)20 7653 9850

Sally Schofield - Chairman

 

Cantor Fitzgerald Europe (Nominated Adviser and Broker)

+44 (0) 207 894 7000

Stewart Dickson / Jeremy Stephenson

 

Newgate Threadneedle (Financial PR)

+44 (0) 207 653 9850

Roddy Watt / Edward Treadwell

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCFFLFLEFFEBBK
Date   Source Headline
1st Dec 20217:00 amRNSRukwa Update
5th Nov 20217:00 amRNSRukwa Update
28th Oct 20212:56 pmRNSHolding(s) in Company
6th Oct 20217:00 amRNSRukwa Update
28th Sep 20217:00 amRNSInterim Results
25th Aug 20217:00 amRNSAppointment of Non-executive Director
24th Aug 20217:00 amRNSRukwa Update
30th Jul 20212:59 pmRNSResult of AGM
5th Jul 202110:10 amRNSPosting of Annual Report and Notice of AGM
29th Jun 202111:01 amRNSAnnual Results for the year ended 31 December 2020
24th Jun 20217:00 amRNSOperational Update
22nd Jun 20217:00 amRNSFinal Payment to Lind
16th Jun 20217:00 amRNSHolding(s) in Company
7th Jun 20217:00 amRNSHolding(s) in Company
27th May 202110:15 amRNSDirector/PDMR Shareholding
25th May 20211:04 pmRNSResult of General Meeting
10th May 20217:00 amRNSPosting of Circular
5th May 20217:00 amRNSNew Strategic Investor and Proposed Placing
6th Apr 20217:00 amRNSChange of Adviser
12th Mar 20219:31 amRNSHolding(s) in Company
8th Mar 202111:59 amRNSHolding(s) in Company
3rd Mar 20217:00 amRNSTanzania Update
16th Feb 20214:41 pmRNSSecond Price Monitoring Extn
16th Feb 20214:36 pmRNSPrice Monitoring Extension
1st Feb 20214:36 pmRNSTotal Voting Rights
26th Jan 20216:04 pmRNSHolding(s) in Company
25th Jan 20215:52 pmRNSHolding(s) in Company
25th Jan 20214:41 pmRNSSecond Price Monitoring Extn
25th Jan 20214:37 pmRNSPrice Monitoring Extension
22nd Jan 20217:00 amRNSHolding(s) in Company
21st Jan 20216:00 pmRNSHolding(s) in Company
21st Jan 20218:30 amRNSHolding(s) in Company
15th Jan 20214:40 pmRNSSecond Price Monitoring Extn
15th Jan 20214:36 pmRNSPrice Monitoring Extension
15th Jan 20212:06 pmRNSSecond Price Monitoring Extn
15th Jan 20212:00 pmRNSPrice Monitoring Extension
15th Jan 202111:05 amRNSSecond Price Monitoring Extn
15th Jan 202111:00 amRNSPrice Monitoring Extension
15th Jan 20219:05 amRNSSecond Price Monitoring Extn
15th Jan 20219:00 amRNSPrice Monitoring Extension
15th Jan 20217:00 amRNSAgreement with Lind Partners and £900,000 Placing
5th Jan 202111:00 amRNSResult of AGM
11th Dec 20204:31 pmRNSProposed Share Capital Reorganisation & AGM Notice
27th Nov 20207:00 amRNSOperational and Corporate Update
30th Oct 20207:00 amRNSInterim Results
27th Oct 20204:41 pmRNSSecond Price Monitoring Extn
27th Oct 20204:35 pmRNSPrice Monitoring Extension
20th Oct 20205:55 pmRNSHolding(s) in Company
6th Oct 20204:39 pmRNSCorporate Update
30th Sep 20207:00 amRNSAnnual Results for the year ended 31 December 2019

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Make Better Investment Decisions

Register for FREE

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.