GreenRoc now on the EU radar after presentation on Amitsoq at the Greenland Business Mission. Watch the interview here.

Less Ads, More Data, More Tools Register for FREE
Sponsored Content
Sponsored Content

Pin to quick picksEDL.L Regulatory News (EDL)

  • There is currently no data for EDL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Commencement of drilling at Rukwa

25 Jul 2011 07:00

RNS Number : 9462K
Edenville Energy PLC
25 July 2011
 

25th July 2011

 

EDENVILLE ENERGY PLC ("Edenville" or the "Company")

 

Commencement of Drilling, Rukwa Coal Project, Tanzania

 

Edenville Energy plc (AIM:EDL), the coal focused African energy exploration and development company, today announces the commencement of exploration drilling at its Rukwa coal project in South Western Tanzania.

 

Layne Drilling Tanzania has been contracted to initiate a PQ/HQ size diamond drill core campaign across the Namwele and Mkomolo Deposits of the Rukwa coalfield. Drilling commenced on the 21st July at the Mkomolo Deposit of the Coalfield where geological mapping, supported by pitting and trenching undertaken by Edenville, has defined a strike length of over 7km of the potential coal measures strata. Coal measures are those strata known to host coal seam mineralisation. Drilling will be completed on a grid pattern with north-south line spacing at 500m intervals. All holes are being drilled vertically to intersect the coal measures at successively deeper depths up to a maximum of 200m. Once the Mkomolo area drilling is completed the drill rig will move south on to the Namwele Deposit.

 

The first diamond drillhole, MK11-01, was completed to a final depth of 43m. The coal measures were intersected from 32 to 38m and included 1.80m of coal which is currently being logged and sampled. The second hole (MK11-02) is now in progress and is at a depth of 21.60m within mudstones that lie directly above the coal zone.

 

All sample analysis will be completed on whole core samples and shipped out and analysed at the coal specialist laboratory (Inspectorate Labs.) in Middleburg, South Africa. Assayed results are expected to be announced during the second half of 2011. Dr. R. Lowman, of the Wardell-Armstong Coal Division is currently on site initiating/supervising the start up and QA/QC procedures for this first phase diamond drilling programme.

 

The Rukwa Coalfield comprises the Namwele, Mkomolo and Muze Deposits where coal is visible on surface. Limited small-scale open cast mining has previously been undertaken at Namwele with production reported at 30,000 tonnes of coal over a 3 year period. This material was trucked to the Mbeya Cement Company, some 250km to the southeast of the Rukwa Coalfields. The geology of the Namwele-Mkomolo Deposits comprises a series of coal hosting Karroo aged sedimentary blocks, which are shallow dipping with a strike length totaling some 9km (trending in a northwest direction) and an average 1.5km in width.

 

Commenting today Simon Rollason, Chairman of Edenville, said; "The diamond drill programme for Rukwa is now underway with priority areas defined from our surface exploration programmes and information obtained from previous coal production. The targets are all near surface and we intend to complete a campaign of a series of shallow drill holes that will allow Edenville to start defining the resource size and quality of the in-situ coal. Our strategy at Edenville is to build low Capex producing energy projects for domestic African supply. Given Rukwa's previous production history and results from surface programme, I look forward to seeing first assayed results from drilling later in the year so we can quickly access the development options for the asset. We intend to update shareholders of the progress periodically as laboratory analysis of the drill core is returned."

Photographs of the drilling are being placed on the company website

Contact:

Edenville Energy plc

Simon Rollason - ChairmanRakesh Patel - Finance Directorwww.edenville-energy.com

 +44 (0) 20 7099 1940 

ZAI Corporate Finance Ltd

Ray Zimmerman/ Marc Cramsie

+44 (0) 20 7060 2220

Threadneedle Communications

Laurence Read/Richard Gotla

+44 (0) 20 7653 9855

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEWEELFFSEEW
Date   Source Headline
26th Nov 20137:00 amRNSEdenville Energy Strategy Update
22nd Oct 201311:49 amRNSGrant of Options
26th Sep 20138:43 amRNSHolding(s) in Company
24th Sep 20139:20 amRNSHolding(s) in Company
20th Sep 20137:01 amRNSHalf Yearly Report
20th Sep 20137:00 amRNSDirectorate Change
17th Sep 20138:00 amRNSDraw Down of Funds & Issue of Equity for drawdown
11th Sep 20137:00 amRNSEngagement of RAFCOGROUP & EIA Update
9th Sep 20137:00 amRNSRukwa Coal Project Scoping Study Results
30th May 201311:40 amRNSResult of AGM
7th May 20137:00 amRNSFinal Results
29th Apr 20138:57 amRNSHolding(s) in Company
22nd Apr 20138:23 amRNSDraw Down of Funds and Issue of Equity
22nd Apr 20137:00 amRNSOperational update
28th Mar 201311:51 amRNSHolding(s) in Company
27th Mar 20137:00 amRNS£5 million Financing Facility Agreed
26th Mar 20137:00 amRNSUpdated mineral resource estimate
19th Mar 20132:40 pmRNSHolding(s) in Company
7th Mar 20133:34 pmRNSHolding(s) in Company
5th Mar 20137:00 amRNSDirectorate Change
18th Feb 20137:00 amRNSAppointment of Non-Executive Director
13th Feb 20134:04 pmRNSHolding(s) in Company
21st Jan 20134:45 pmRNSHolding(s) in Company
15th Jan 201312:33 pmRNSHolding(s) in Company
10th Jan 20137:00 amRNSPositive drill results from the Muze deposit
27th Dec 20124:11 pmRNSHolding(s) in Company
26th Nov 20121:59 pmRNSHolding(s) in Company
21st Nov 20122:00 pmRNSHolding(s) in Company
16th Nov 20122:46 pmRNSExercise of Warrants
29th Oct 201212:04 pmRNSHolding(s) in Company
16th Oct 20124:01 pmRNSHolding(s) in Company
10th Oct 20129:08 amRNSHolding(s) in Company
8th Oct 20127:00 amRNSMkomolo Drill Results
2nd Oct 20127:00 amRNSChange of Adviser
19th Sep 20123:45 pmRNSHolding(s) in Company
17th Sep 20124:53 pmRNSHalf Yearly Report
28th Aug 20127:00 amRNSPositive Drill Results from the Rukwa Coal Project
20th Aug 20127:00 amRNSOption Exercised on Rukwa Coalfield Project
17th Aug 20124:53 pmRNSHolding(s) in Company
13th Aug 20129:45 amRNSInitial Mkomolo 2012 Drill Results
31st Jul 20127:00 amRNSRukwa Coalfield Update
12th Jul 20125:19 pmRNSHolding(s) in Company
4th Jul 201210:55 amRNSHolding(s) in Company
3rd Jul 20123:49 pmRNSHolding(s) in Company
3rd Jul 20127:00 amRNSNamwele Drilling Results
2nd Jul 20121:59 pmRNSHolding(s) in Company
27th Jun 20125:30 pmRNSHolding(s) in Company
27th Jun 201212:13 pmRNSResult of AGM
19th Jun 20122:30 pmRNSHolding(s) in Company
18th Jun 20123:57 pmRNSMuze Project Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Make Better Investment Decisions

Register for FREE

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.