Brian Goodman, CEO of Golden Matrix Group Inc. explains how they stay one step ahead of their rivals. Watch the interview here.

Less Ads, More Data, More Tools Register for FREE
Sponsored Content
Sponsored Content

Pin to quick picksEDL.L Regulatory News (EDL)

  • There is currently no data for EDL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Commencement of drilling at Rukwa

25 Jul 2011 07:00

RNS Number : 9462K
Edenville Energy PLC
25 July 2011
 

25th July 2011

 

EDENVILLE ENERGY PLC ("Edenville" or the "Company")

 

Commencement of Drilling, Rukwa Coal Project, Tanzania

 

Edenville Energy plc (AIM:EDL), the coal focused African energy exploration and development company, today announces the commencement of exploration drilling at its Rukwa coal project in South Western Tanzania.

 

Layne Drilling Tanzania has been contracted to initiate a PQ/HQ size diamond drill core campaign across the Namwele and Mkomolo Deposits of the Rukwa coalfield. Drilling commenced on the 21st July at the Mkomolo Deposit of the Coalfield where geological mapping, supported by pitting and trenching undertaken by Edenville, has defined a strike length of over 7km of the potential coal measures strata. Coal measures are those strata known to host coal seam mineralisation. Drilling will be completed on a grid pattern with north-south line spacing at 500m intervals. All holes are being drilled vertically to intersect the coal measures at successively deeper depths up to a maximum of 200m. Once the Mkomolo area drilling is completed the drill rig will move south on to the Namwele Deposit.

 

The first diamond drillhole, MK11-01, was completed to a final depth of 43m. The coal measures were intersected from 32 to 38m and included 1.80m of coal which is currently being logged and sampled. The second hole (MK11-02) is now in progress and is at a depth of 21.60m within mudstones that lie directly above the coal zone.

 

All sample analysis will be completed on whole core samples and shipped out and analysed at the coal specialist laboratory (Inspectorate Labs.) in Middleburg, South Africa. Assayed results are expected to be announced during the second half of 2011. Dr. R. Lowman, of the Wardell-Armstong Coal Division is currently on site initiating/supervising the start up and QA/QC procedures for this first phase diamond drilling programme.

 

The Rukwa Coalfield comprises the Namwele, Mkomolo and Muze Deposits where coal is visible on surface. Limited small-scale open cast mining has previously been undertaken at Namwele with production reported at 30,000 tonnes of coal over a 3 year period. This material was trucked to the Mbeya Cement Company, some 250km to the southeast of the Rukwa Coalfields. The geology of the Namwele-Mkomolo Deposits comprises a series of coal hosting Karroo aged sedimentary blocks, which are shallow dipping with a strike length totaling some 9km (trending in a northwest direction) and an average 1.5km in width.

 

Commenting today Simon Rollason, Chairman of Edenville, said; "The diamond drill programme for Rukwa is now underway with priority areas defined from our surface exploration programmes and information obtained from previous coal production. The targets are all near surface and we intend to complete a campaign of a series of shallow drill holes that will allow Edenville to start defining the resource size and quality of the in-situ coal. Our strategy at Edenville is to build low Capex producing energy projects for domestic African supply. Given Rukwa's previous production history and results from surface programme, I look forward to seeing first assayed results from drilling later in the year so we can quickly access the development options for the asset. We intend to update shareholders of the progress periodically as laboratory analysis of the drill core is returned."

Photographs of the drilling are being placed on the company website

Contact:

Edenville Energy plc

Simon Rollason - ChairmanRakesh Patel - Finance Directorwww.edenville-energy.com

 +44 (0) 20 7099 1940 

ZAI Corporate Finance Ltd

Ray Zimmerman/ Marc Cramsie

+44 (0) 20 7060 2220

Threadneedle Communications

Laurence Read/Richard Gotla

+44 (0) 20 7653 9855

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEWEELFFSEEW
Date   Source Headline
8th Jul 20157:00 amRNSRecent Meetings in Tanzania
2nd Jul 20153:05 pmRNSExercise of Warrants
1st Jul 201510:07 amRNSSubmission of Mining Licence
1st Jul 20157:00 amRNSExercise of Warrants
23rd Jun 201512:00 pmRNSResult of AGM
23rd Jun 20157:00 amRNSMining Licence Application
9th Jun 20157:00 amRNSExercise of Warrants
3rd Jun 20157:00 amRNSBoard Reorganisation
29th May 20154:28 pmRNSNotice of AGM
27th May 20157:01 amRNSProject Update
27th May 20157:00 amRNSFull Year Results
12th May 20157:01 amRNSExploration Programme and Project Update
12th May 20157:01 amRNSTermination of Darwin Facility
23rd Apr 20157:00 amRNSCompletion of £250,000 Placing
15th Apr 20157:00 amRNSProject and Company Update
2nd Mar 20157:00 amRNSPOWER PLANT FEASIBILITY STUDY
21st Jan 201512:01 pmRNSCorrection: Mkomolo and Muze Test Pit Results
21st Jan 20157:00 amRNSMkomolo and Muze Test Pit Results
16th Dec 20147:00 amRNSMkomolo Test Pit Results
1st Dec 20147:00 amRNSStrategy Update
24th Nov 20147:00 amRNSNamwele Test Pit Results
18th Nov 20144:40 pmRNSHolding(s) in Company
11th Nov 20147:00 amRNSDirectorate Change
10th Nov 20147:00 amRNSHolding(s) in Company
5th Nov 20147:00 amRNSFeasibility Study and Working Capital Placing
19th Sep 20147:00 amRNSInterim Results
1st Jul 20147:00 amRNSEnvironmental Impact Assessment Certificate
27th Jun 201411:10 amRNSResult of AGM
19th Jun 20147:00 amRNSPlacing & Issue of Equity
17th Jun 20144:40 pmRNSSecond Price Monitoring Extn
17th Jun 20144:35 pmRNSPrice Monitoring Extension
11th Jun 20147:00 amRNSExpression of Interest signed
4th Jun 20149:00 amRNSNotice of AGM
3rd Jun 20147:00 amRNSResults for the Year Ended 31 December 2013
3rd Apr 201410:30 amRNSEdenville at UK Ivestor Show
26th Mar 20147:00 amRNSOperational Update
24th Jan 20145:31 pmRNSHolding(s) in Company
24th Jan 201411:31 amRNSTR-1 Disclosure Form
22nd Jan 201410:40 amRNSHolding(s) in Company
21st Jan 20144:35 pmRNSPrice Monitoring Extension
21st Jan 20142:27 pmRNSTR-1 Disclosure Form
20th Jan 20145:32 pmRNSHolding(s) in Company
20th Jan 20141:05 pmRNSHolding(s) in Company
17th Jan 20147:00 amRNSChange of Adviser
17th Jan 20147:00 amRNSCompletion of £1 million Placing
16th Jan 20144:40 pmRNSSecond Price Monitoring Extn
16th Jan 20144:35 pmRNSPrice Monitoring Extension
3rd Jan 20149:43 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES
9th Dec 20133:27 pmRNSTR-1 Notification of Major Interest in Shares
3rd Dec 201311:08 amRNSTR-1: NOTIFICATION OF MAJOR INTEREST IN SHARES

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Free Investment Tools

Register for FREE

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.