Tribe Technology’s Autonomous Innovations set to Revolutionise mining operations. Watch the interview here.

Less Ads, More Data, More Tools Register for FREE
Sponsored Content
Sponsored Content

Pin to quick picksEDL.L Regulatory News (EDL)

  • There is currently no data for EDL

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Commencement of drilling at Rukwa

25 Jul 2011 07:00

RNS Number : 9462K
Edenville Energy PLC
25 July 2011
 

25th July 2011

 

EDENVILLE ENERGY PLC ("Edenville" or the "Company")

 

Commencement of Drilling, Rukwa Coal Project, Tanzania

 

Edenville Energy plc (AIM:EDL), the coal focused African energy exploration and development company, today announces the commencement of exploration drilling at its Rukwa coal project in South Western Tanzania.

 

Layne Drilling Tanzania has been contracted to initiate a PQ/HQ size diamond drill core campaign across the Namwele and Mkomolo Deposits of the Rukwa coalfield. Drilling commenced on the 21st July at the Mkomolo Deposit of the Coalfield where geological mapping, supported by pitting and trenching undertaken by Edenville, has defined a strike length of over 7km of the potential coal measures strata. Coal measures are those strata known to host coal seam mineralisation. Drilling will be completed on a grid pattern with north-south line spacing at 500m intervals. All holes are being drilled vertically to intersect the coal measures at successively deeper depths up to a maximum of 200m. Once the Mkomolo area drilling is completed the drill rig will move south on to the Namwele Deposit.

 

The first diamond drillhole, MK11-01, was completed to a final depth of 43m. The coal measures were intersected from 32 to 38m and included 1.80m of coal which is currently being logged and sampled. The second hole (MK11-02) is now in progress and is at a depth of 21.60m within mudstones that lie directly above the coal zone.

 

All sample analysis will be completed on whole core samples and shipped out and analysed at the coal specialist laboratory (Inspectorate Labs.) in Middleburg, South Africa. Assayed results are expected to be announced during the second half of 2011. Dr. R. Lowman, of the Wardell-Armstong Coal Division is currently on site initiating/supervising the start up and QA/QC procedures for this first phase diamond drilling programme.

 

The Rukwa Coalfield comprises the Namwele, Mkomolo and Muze Deposits where coal is visible on surface. Limited small-scale open cast mining has previously been undertaken at Namwele with production reported at 30,000 tonnes of coal over a 3 year period. This material was trucked to the Mbeya Cement Company, some 250km to the southeast of the Rukwa Coalfields. The geology of the Namwele-Mkomolo Deposits comprises a series of coal hosting Karroo aged sedimentary blocks, which are shallow dipping with a strike length totaling some 9km (trending in a northwest direction) and an average 1.5km in width.

 

Commenting today Simon Rollason, Chairman of Edenville, said; "The diamond drill programme for Rukwa is now underway with priority areas defined from our surface exploration programmes and information obtained from previous coal production. The targets are all near surface and we intend to complete a campaign of a series of shallow drill holes that will allow Edenville to start defining the resource size and quality of the in-situ coal. Our strategy at Edenville is to build low Capex producing energy projects for domestic African supply. Given Rukwa's previous production history and results from surface programme, I look forward to seeing first assayed results from drilling later in the year so we can quickly access the development options for the asset. We intend to update shareholders of the progress periodically as laboratory analysis of the drill core is returned."

Photographs of the drilling are being placed on the company website

Contact:

Edenville Energy plc

Simon Rollason - ChairmanRakesh Patel - Finance Directorwww.edenville-energy.com

 +44 (0) 20 7099 1940 

ZAI Corporate Finance Ltd

Ray Zimmerman/ Marc Cramsie

+44 (0) 20 7060 2220

Threadneedle Communications

Laurence Read/Richard Gotla

+44 (0) 20 7653 9855

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEWEELFFSEEW
Date   Source Headline
16th Aug 20237:00 amRNSAppointment of Joint Corporate Broker
15th Aug 20237:00 amRNSChange of Admission Date
3rd Aug 20235:40 pmRNSResult of AGM,Directorate Change,Director Dealings
10th Jul 20237:00 amRNSNotice of AGM
4th Jul 202311:14 amRNSHolding(s) in Company
30th Jun 20237:00 amRNSAnnual Results for the year ended 31 December 2022
22nd Jun 20232:51 pmRNSHolding(s) in Company
21st Jun 20235:43 pmRNSHolding(s) in Company
19th Jun 20235:28 pmRNSHolding(s) in Company
5th Jun 20239:30 amRNSHolding(s) in Company
2nd Jun 202311:25 amRNSHolding(s) in Company
2nd Jun 20237:00 amRNSProposed Change of Name
1st Jun 20239:05 amRNSStrategic Investment and Board Changes
24th May 202312:33 pmRNSHolding(s) in Company
23rd May 20234:01 pmRNSHolding(s) in Company
11th Apr 20237:00 amRNSRukwa Production Update
28th Mar 20239:16 amRNSRukwa Operational Update
24th Mar 20234:54 pmRNSHolding(s) in Company
9th Feb 20237:00 amRNSRukwa Operational Update
16th Dec 20229:07 amRNSHolding(s) in Company
14th Dec 20229:26 amRNSHolding(s) in Company
13th Dec 202211:38 amRNSHolding(s) in Company
13th Dec 202210:21 amRNSRejection of Unfair Dismissal Claim
7th Dec 20229:39 amRNSHolding(s) in Company
6th Dec 20227:00 amRNSPlacing to raise £0.4 million & Operational Update
9th Nov 20227:00 amRNSRukwa Operational Update & Corporate Update
13th Oct 20227:00 amRNSDirectors’ Dealings
11th Oct 20227:00 amRNSRukwa Coal Project Operational Update
29th Sep 20229:48 amRNSInterim Results
18th Aug 20225:20 pmRNSDirectors’ Dealings
16th Aug 20227:00 amRNSNew Coal Mining Agreement
4th Aug 20227:00 amRNSDirectorate Change
3rd Aug 20222:05 pmRNSSecond Price Monitoring Extn
3rd Aug 20222:00 pmRNSPrice Monitoring Extension
3rd Aug 202212:00 pmRNSCorporate Update
3rd Aug 202211:27 amRNSResult of AGM
8th Jul 20224:30 pmRNSNotice of AGM
5th Jul 20227:00 amRNSBoard Changes
30th Jun 20227:00 amRNSResults for the year ended 31 December 2021
31st May 20227:00 amRNSTermination of Coal Mining Agreement
26th May 20223:46 pmRNSHolding(s) in Company
18th May 20221:15 pmRNSOperational Update Rukwa Coal Project
4th May 20223:52 pmRNSOperational Update Rukwa Coal Project
3rd Feb 20221:20 pmRNSNew Coal Mining Agreement Signed
12th Jan 20227:00 amRNSAppointment of Broker
4th Jan 20227:00 amRNSAppointment of Interim Broker
7th Dec 20212:06 pmRNSSecond Price Monitoring Extn
7th Dec 20212:01 pmRNSPrice Monitoring Extension
7th Dec 202111:06 amRNSSecond Price Monitoring Extn
7th Dec 202111:00 amRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Track Your Investments

Register for FREE

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.