Edenville Energy plc (AIM:EDL), the Company developing an integrated coal to power project in western Tanzania, is pleased to announce the second set of results the Company has received from SGS Laboratories in relation to the recent bulk sampling programme carried out on the Mkomolo and Namwele deposits and detailed in the Company's announcement on 27 September 2016.

 

These results cover seam MK1 and follow the results of the sampling of seam MK2 announced on 15 November 2016.

 

Key Points:

 

· Results from seam MK1 confirm coal as suitable for the provision of power plant feed;

 

· Only moderate, or in certain cases, no washing will be required for the MK1 seam coal to be used in the combustion process in a coal fired thermal power plant;

 

· Where washing is required, high yields of approximately 60% are confirmed as achievable to produce a high quality power plant feed product;

 

· The results from the sampling and wash tests of MK1 further support and validate the results from MK2 and the recently constructed financial model and Resource Technical Assessment;

 

· Applying an increased wash to seam MK1, results in a product above 20MJ/kg which offers scope for supply into the local and regional markets; and

 

· The Company is working with potential local customers assessing the options to establish mining operations in 2017.

 

 

Rufus Short, CEO of Edenville, commented: "The two seams opened up so far in South Mkomolo have demonstrated very good values and wash yields for coal ideally suited for the proposed power plant. Assuming the yields can be translated into production, this will have a significant positive impact on the economics of the project. This was very near surface coal and once through the weathered zones the potential for even better qualities is there. We have also received interest for our coal from other power projects planned in East Africa and are in discussions with these groups on pricing and supply. We are confident our Rukwa coal can be used in a variety of power plants including the planned facility at Rukwa.

 

"Additionally the seams also contain significant quantities of higher energy value coal above 20MJ/kg, suitable for sale into local and regional industrial applications and we are in advanced discussions with potential customers to open up production in 2017.

 

"We now have a Phase 1, 10 year mining plan which opens up the northern area of Mkomolo and can produce multiple product streams to provide both power plant feedstock and coal for industrial applications. I very much hope to be able to update shareholders soon on all of these areas."

 

Technical Details

 

The results from seam MK1 confirm both that the recent results in MK2 can be generally replicated in different seams and that the coal is well suited for use in thermal power generation. As previously stated in the Company's announcement of 15 November 2016 this data will form a crucial part of the process going forward to design and construct a coal fired power plant at the Rukwa project site.

 

Thus any washing of the coal to provide power plant feed would primarily be to a point where moderate and low cost treatment of the coal would produce a fuel that is optimum for the combustion process and maximise the tonnage available.

 

Subsequent to the wash results, the Company can now confirm the suitability of this coal to provide a sustained and reliable fuel supply to a power plant project. Combined with the recent analysis carried out on available coal resources, the Company can now provide a high degree of validation around the coal deposit at Rukwa which directly feeds into the power plant design process.

 

Again similar to the behaviour when washed of MK2, the MK1 bulk sample produced results which indicate only moderate washing would be needed to produce a coal suitable for use in the power generation process. Recoveries again exceeded our expectations in the mid-range material, particularly between 14 and 17MJ/kg. Additionally, economically viable yields for coal with an energy value above 20MJ/kg indicate a large proportion of this type of coal has the potential to be sold into the market for local industrial usage.

 

The sample from MK1 included a significant proportion of friable and weathered material, distinguishable from the main seam below. This was included in the test work in order to determine its suitability in the combustion process. This material generally demonstrated lower energy values and would probably not be used as power plant feedstock. When this coal is mined commercially there is the likelihood that a large proportion of the weathered material can be separated by selective mining, rather than needing to be washed out subsequent to mining, thus reducing the overall washing cost. As the seam deepens, this weathered material is expected to reduce.

 

Sample MK1 which lies in the southern end of the Mkomolo deposit produced raw unwashed values as shown in Table 1.

 

Table 1 Raw Coal

 

Inherent Moisture

Ash

Volatile Matter

Fixed Carbon

Calorific Value

Total Sulphur

%

%

%

%

MJ/kg

%

4.0

54.4

19.3

22.3

10.3

3.2

 

 

Applying a moderate or partial wash to the raw coal based on a density of 2.2 the following product was obtained as shown in Table 2. The yield from this wash or "de-stoning" was high at 60%.

 

Table 2 Washed Coal for Power Plant

 

Inherent Moisture

Ash

Volatile Matter

Fixed Carbon

Calorific Value

Total Sulphur

%

%

%

%

MJ/kg

%

4.6

38.3

24.8

32.4

16.1

3.3

 

The resultant product is considered suitable for the combustion process and typical of many coals used in power generation worldwide.

 

All values have been calculated on an air dried basis.

 

The MK1 seam, along with seam MK2, contains significant quantities of higher energy value coal above 20MJ/kg that could be utilised in local and regional industrial applications. Additionally we have also identified large areas to the north in Mkomolo that contain high value coal that could be sold to markets other than the Rukwa Coal to Power project. The material constitutes part of a Phase 1, 10 year mining plan that can provide a multiple product stream for both power plant and commercial sales. The Company is working with potential customers assessing the options to establish mining operations in 2017.

 

 

Qualified Person Review

 

Mark J. Pryor, Pr.Sc.Nat. has reviewed and approved the technical information contained within this announcement in his capacity as a Qualified Person, as defined by the AIM Rules and National Instrument 43-101 Standards of Disclosure for Mineral Projects.

 

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

 

 

For further information please contact:

 

 

 

Edenville Energy Plc

Jeff Malaihollo - Chairman

Rufus Short - CEO

+44 (0) 20 7652 9788

 

Northland Capital Partners Limited

(Nominated Adviser)

Gerry Beaney

David Hignell

 

 

+44 (0) 20 3861 6625

 

Optiva Securities Limited

(Broker)

Jeremy King

Graeme Dickson

 

 

+44 (0) 20 3137 1902

IFC Advisory

(Financial PR and IR)

Tim Metcalfe

Graham Herring

Heather Armstrong

Miles Nolan

+44 (0) 20 3053 8671

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDAKBDBOBDDQBK
Date   Source Headline
5th Jun 20097:00 amRNSOption Agreement completion
1st Jun 20097:00 amRNSDirectorate Change
13th Mar 20097:00 amRNSOption Agreement and Issue of Equity
23rd Jan 20094:23 pmRNSResult of EGM/Change of Name
16th Jan 20092:14 pmRNSHolding(s) in Company
31st Dec 200812:34 pmRNSChange of Name
16th Dec 200810:07 amRNSHolding(s) in Company
11th Dec 200810:30 amRNSChange of Adviser
9th Dec 20087:30 amRNSIssue of Equity
3rd Nov 200810:02 amRNSTotal Voting Rights
3rd Nov 20089:57 amRNSChange of Registered Office
3rd Nov 20089:55 amRNSDirectorate Changes
3rd Nov 20089:49 amRNSDisposal and Related Party Transaction
15th Oct 20083:30 pmRNSHolding(s) in Company
7th Oct 20083:45 pmRNSIssue of Equity
30th Sep 20082:30 pmRNSResults of AGM and EGM and Financing Update
30th Sep 20082:30 pmRNSRestoration - TV Commerce Holdings plc
30th Sep 20087:00 amRNSHalf-yearly Report
11th Sep 20087:30 amRNSNotice of EGM
8th Sep 20081:45 pmRNSReport and Accounts 2007
8th Sep 20089:30 amRNSAIM Rule 26 Website
5th Sep 20083:50 pmRNSStatement re. Suspension and
5th Sep 20083:50 pmRNSFinal Results
26th Jun 20082:45 pmRNSStatement re. Suspension
26th Jun 20082:45 pmRNSSuspension - TV Commerce Hold
18th Apr 20087:00 amRNSRestoration- TV Commerce Hldg
18th Apr 20087:00 amRNSChange of Adviser
17th Mar 20087:00 amRNSSuspension - TV Commerce Hldg
12th Mar 20083:00 pmRNSCapital Reduction
29th Jan 20087:00 amRNSRestoration - TV Commerce
29th Jan 20087:00 amRNSInterim Results
24th Jan 20085:18 pmRNSCapital Reduction
1st Oct 20077:30 amRNSSuspension -TV Commerce Hldgs
20th Aug 20079:15 amRNSAIM Rule 26
29th Jun 200711:46 amRNSFinal Results
18th Apr 200710:55 amRNSDirector/PDMR Shareholding
5th Mar 20074:51 pmRNSChange of registered address
28th Feb 20076:16 pmRNSTrading Statement
22nd Dec 200610:16 amRNSTotal Voting Rights
24th Nov 20067:59 amRNSTrading Statement
21st Sep 20067:01 amRNSInterim Results
4th May 200610:25 amRNSDirector/PDMR Shareholding
13th Apr 20067:00 amRNSDirectorate Change
21st Mar 20067:01 amRNSFinal Results
10th Mar 200610:59 amRNSOfcom grants Play2Win licence
24th Feb 20067:00 amRNSNotice of Results
12th Jan 20062:29 pmRNSChange of Adviser
1st Dec 20057:01 amRNSTV adverts for Santa Calling
7th Nov 20057:01 amRNSPsychic TV expands to the US
11th Oct 20057:00 amRNSTrading Statement

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.