Less Ads, More Data, More Tools Register for FREE

Pin to quick picksECHO.L Regulatory News (ECHO)

  • There is currently no data for ECHO

Statement re Ksar Hadada

21 Sep 2006 15:59

Independent Resources PLC21 September 2006 Additional data leads to re-appraisal of planned Tunisian drilling strategy AIM-quoted Independent Resources plc ("IRG" or "the Company") is pleased toannounce it has acquired additional seismic and geological data from itspromising Ksar Hadada oil and gas licence in Tunisia. As a result, it has decided to delay the start of drilling which - as announcedin its interim results for the period ended 31 March 2006 - was originallyscheduled for the current quarter, pending a reappraisal of the most appropriatedrilling strategy. The new data has been supplied by Tunisia's state oil company EntrepriseTunisienne d'Activites Petrolieres (ETAP). IRG holds a 40% stake in theexploration permit. IRG Chairman Grayson Nash said: "While it is disappointing that we cannot startas early as we would like with our planned well, we are delighted to havereceived new information that is providing a clearer picture of existing andpossible new prospects at Ksar Hadada. We are looking forward to re-appraisingthe best way forward, and hope to agree a new timetable without too much delay.We believe we have a highly prospective licence area and we are especially keen,in the current global environment of high drilling costs, to optimise anydrilling campaign." For further information contact: Stephen Staley, Managing Director, Independent Resources plc: 01332 865 253 07771 838 753Allan Piper, First City Financial Public Relations: 020 7436 7486 Background details follow: The Ksar Hadada block covers an area of around 7,000 km(2), and contains ageological target that has proved very prospective in neighbouring Libya andAlgeria where several large oil & gas discoveries have been made (e.g. HassiMessaoud, Amal, Elephant, and Rhourd El Baguel.) The main prospect of interestremains the Sidi Toui structure. The production sharing contract (PSC) has a four-year exploration period fromApril 2004 and two possible extensions of three years each. The licensees areresponsible for 100% of costs during the exploration phase. All work commitmentsfor the first four years have already been met. The acreage was first explored in the 1950s, using the poor technology availableat that time. The Sidi Toui-1 well discovered oil and some oil stained coreswere recovered. A limited test programme was conducted on the oil leg. The SidiToui-2 appraisal well was dry. Subsequent seismic data showed both wells werepoorly located, having been sited using surface mapping and gravity data as wasprevalent in the 1950s. Recognising that this major structure had not been properly explored was thebasis for applying for the permit. In 2004 Petroceltic and its carried partnersdrilled the Sidi Toui-3 appraisal well but the Chinese rig was subject toscheduling problems and was available for a much shorter time than was planned.The well contacted few fractures and was only tested for a very short periodwithout the benefit of nitrogen lifting equipment to help stimulate the well.The well was suspended after a tiny amount of fluids had been produced duringthe very brief test. Before acquiring this additional data from ETAP, IRG had undertaken an intensivepost mortem with Blackwatch Petroleum Services and concluded that Sidi Toui- 3appraisal well was worth re-entering and re-testing. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
9th Jun 20107:00 amRNSHalf Yearly Report
26th May 201011:22 amRNSHolding(s) in Company
24th May 201011:12 amRNSHolding(s) in Company
24th May 201011:11 amRNSHolding(s) in Company
10th May 20107:00 amRNSOperations Update, Ksar Hadada Licence
4th May 20108:31 amRNSHolding(s) in Company
16th Apr 201011:14 amRNSHolding(s) in Company
31st Mar 20107:00 amRNSUpdate on Fiume Bruna
4th Mar 20107:00 amRNSUpdate re Ksar Hadada
8th Feb 20107:00 amRNSUpdate on Fiume Bruna
22nd Dec 20091:07 pmRNSResult of AGM
25th Nov 200910:32 amRNSFinal Results
1st Oct 20097:00 amRNSChange of Nominated Adviser
28th Aug 20097:00 amRNSUpdate on Fiume Bruna
3rd Aug 20099:51 amRNSBoard change and change of registered address
23rd Jun 20097:00 amRNSHalf Yearly Report
9th Jun 20097:00 amRNSUpdate re Ksar Hadada
28th May 20099:28 amRNSHolding(s) in Company
27th May 200911:16 amRNSNotification of Substantial Shareholding
14th Apr 20095:23 pmRNSDirector/PDMR Shareholding
22nd Jan 200910:11 amRNSStatement re. Press Comment
11th Dec 20087:00 amRNSFiume Bruna Update
5th Nov 200811:22 amRNSHolding(s) in Company
1st Oct 20087:00 amRNSDirector/PDMR Shareholding
1st Oct 20087:00 amRNSHolding(s) in Company
9th Sep 20082:57 pmRNSHolding(s) in Company
9th Sep 20087:00 amRNSUpdate re Fiume Bruna
26th Aug 200811:14 amRNSResult of EGM and Total Votin
14th Aug 20088:45 amRNSHolding(s) in Company: Replac
12th Aug 20087:00 amRNSHolding(s) in Company
7th Aug 20087:00 amRNSNotice of EGM, Placing, Tradi
23rd Jul 20087:00 amRNSHolding(s) in Company
2nd Jul 20087:00 amRNSUpdate re Rivara
25th Apr 20087:01 amRNSItalian partner for Rivara
22nd Apr 200812:52 pmRNSResponse to press comment
21st Apr 20087:01 amRNSAdviser appointed
16th Apr 20083:09 pmRNSHolding(s) in Company
4th Apr 20083:37 pmRNSDirector/PDMR Shareholding
24th Dec 200710:42 amRNSResult of AGM
23rd Nov 20077:01 amRNSFinal Results
16th Aug 20078:30 amRNSAIM Rule 26
9th Aug 20077:30 amRNSRivara Update
23rd Jul 20077:01 amRNSUpdate on Fiume Bruna project
18th Jul 20077:01 amRNSFurther Rivara Update
25th Jun 20077:01 amRNSUpdate on Rivara
13th Jun 20077:00 amRNSChange of Adviser
30th May 20077:00 amRNSInterim Results
10th Apr 200710:23 amRNSAnnual Report and Accounts
12th Mar 20077:02 amRNSDrilling Report
21st Dec 20069:37 amRNSDirector/PDMR Shareholding

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.