Less Ads, More Data, More Tools Register for FREE

Pin to quick picksCeres Power Regulatory News (CWR)

Share Price Information for Ceres Power (CWR)

Share Price is delayed by 15 minutes
Get Live Data
635.00    -15.00 (-2.31%)
Bid:
634.00
Ask:
636.50
Spread: 2.50 (0.394%)
Market Cap: £1.24b
CWR Live PriceLast checked at - London Stock Exchange

Intraday Ceres Power Share Chart

Significant Technology Progress

23 May 2012 07:00

RNS Number : 8969D
Ceres Power Holdings plc
23 May 2012
 



 

23rd May 2012

 

Ceres Power Holdings plc

("Ceres", "Ceres Power", or "the Company")

Significant Technology Progress

Ceres Power is pleased to announce today that significant progress has been made in improving core technology power degradation performance and CHP product reliability. The recent results underpin our confidence in meeting the mass market product specification required for launch in 2016.

In our Interim Results in March 2012, we reported that degradation rates of around 3% per 1000hrs had been achieved on stacks running on a reformate mix. Contamination, arising from the Company's test infrastructure, has now been identified as the significant cause of the power degradation. The sources of this contamination have been identified and addressed, and degradation of around 1% per 1000 hours has now been achieved.

Previously, we also reported that the higher power degradation rate in a CHP product was probably due to control and contamination of the fuel processing unit. We can now confirm that we have tested the fuel processing unit for over 1500hrs and that methane conversion efficiency is within the required performance levels, meaning that the compact fuel processor design is capable of meeting stack fuel requirements in a CHP product. We are currently in the process of implementing and testing the engineering modifications to the CHP product, and are confident that we will demonstrate a significant reduction in the CHP degradation rate from that previously measured, and compatible with the degradation rates achieved at stack level.

Substantial improvements have also been made in CHP product reliability, through hardware and software enhancements that allow unimpeded running and increased uptime. As an example, the power electronics has been upgraded to support continued operation of the CHP product by seamlessly handling temporary and intermittent failures in the mains electricity grid. As a result, we have been running CHP products at improved levels of availability of greater than 97%, demonstrating consistent and dependable product-level operation.

Going forward, the Company will continue to build and test CHPs incorporating further improvements to reduce power degradation and increase reliability performance. We remain confident that we will deliver and produce a cost effective CHP product for the mass market for launch in 2016.

 

For Further Information Contact:

 

 

Ceres Power Holdings plc

Tel. +44 (0)1403 273 463

 

David Pummell, Chief Executive Officer

 

Rex Vevers, Finance Director

 

 

Investec Securities Limited

Tel. +44 (0)20 7071 4304

 

Chris Sim/James Ireland

 

 

Kreab Gavin Anderson & Company

Tel. +44 (0)20 7074 1800

 

Ken Cronin/Deborah Walter

 

 

Notes to Editors:

Ceres Power is a leading developer of clean, efficient, cost‐effective decentralised energy products that reduce operating costs, lower CO2 emissions and improve energy security. These products use the Company's mass manufacturable technology platform, the Fuel Cell Module, based on the Company's unique patented solid oxide fuel cell ('SOFC') technology and operating on mains natural gas or packaged fuels, such as LPG. The Company is listed on the AiM section of the London Stock Exchange, and has facilities in Horsham and Crawley, West Sussex.

The Ceres Power fuel cell Combined Heat and Power ('CHP') product operates on mains natural gas and generates all of the heating and hot water and the majority of the electricity needs of a typical UK home. The wall‐mounted unit is designed to replace a conventional central heating boiler and uses the same gas, water and electricity connections. With its low heat‐to‐power ratio and unique load‐following ability, a Ceres Power CHP product can operate all year round thereby maximizing the energy savings for the household and cutting carbon emissions.

Significant market opportunities exist for the Company's residential CHP products globally including in Europe, Asia and North America. New products and market opportunities also exist in the longer term including remote industrial power and auxiliary power for transport applications.

www.cerespower.com

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUUUARUUAVUUR
Date   Source Headline
14th Jul 20207:00 amRNSResult of secondary placing in Ceres Power
13th Jul 20205:11 pmRNSProposed secondary placing in Ceres Power Holdings
9th Jul 20207:00 amRNSTrading Update
30th Jun 20207:00 amRNSTotal Voting Rights
18th Jun 20207:00 amRNSAppointment of Non-Executive Directors
11th Jun 20207:00 amRNSAppointment of Chairman and Board changes
29th May 20207:00 amRNSTotal Voting Rights
21st May 20207:00 amRNSResult of secondary placing in Ceres Power
20th May 20204:48 pmRNSProposed secondary placing in Ceres Power Holdings
14th May 20207:00 amRNSAppointment of Mark Garrett as COO
15th Apr 20207:00 amRNSWeichai Power Equity Investment
9th Apr 202010:39 amRNSDirectors' Dealings
2nd Apr 20207:00 amRNSChange of Financial Year End
31st Mar 20208:09 amRNSTotal Voting Rights
23rd Mar 20206:07 pmRNSStandard form for notification of major holdings
16th Mar 20207:00 amRNSHalf-year Report
12th Mar 20207:00 amRNSBosch Completes Equity Investment
7th Feb 20203:20 pmRNSExercise of Share Options, PDMR Dealing
6th Feb 20207:00 amRNSAppointment of a Non-executive Director
3rd Feb 20202:42 pmRNSStandard form for notification of major holdings
31st Jan 20205:27 pmRNSTotal Voting Rights
28th Jan 20207:00 amRNSNotice of Results
27th Jan 20207:00 amRNSStandard form for notification of major holdings
27th Jan 20207:00 amRNSBlock Admission Application
24th Jan 20204:08 pmRNSStandard form for notification of major holdings
23rd Jan 202012:20 pmRNSStandard form for notification of major holdings
23rd Jan 20207:00 amRNSGrant of Share Options under the Sharesave Scheme
22nd Jan 202011:00 amRNSStatement re: Bosch holding increase
22nd Jan 202010:17 amRNSResult of Reverse Accelerated Bookbuild
22nd Jan 20207:05 amRNSStatement re Reverse Accelerated Bookbuild
22nd Jan 20207:00 amRNSBosch to increase holding in Ceres Power to c.18%
3rd Jan 20207:00 amRNSBlock Listing Return
19th Dec 201910:06 amRNSTotal Voting Rights
4th Dec 20194:15 pmRNSResult of AGM
4th Dec 20194:10 pmRNSHolding(s) in Company
25th Nov 20191:14 pmRNSTotal Voting Rights
12th Nov 20195:04 pmRNSNotice of Annual General Meeting
12th Nov 20197:00 amRNSCapital Markets Day
8th Nov 20198:25 amRNSHolding(s) in Company
6th Nov 20197:00 amRNSNew hydrogen-ready system
4th Nov 20193:35 pmRNSChange of Auditor
30th Oct 20194:15 pmRNSExcercise of Share Options, PDMR Dealing
3rd Oct 20192:38 pmRNSGrant of LTIP Awards and Total Voting Rights
2nd Oct 20197:00 amRNSFinal Results
19th Sep 201912:01 pmRNSHolding(s) in Company
5th Sep 20197:00 amRNSFirst Range Extender Bus Prototype
3rd Sep 20197:00 amRNSNotice of Results
30th Jul 20193:00 pmRNSHolding(s) in Company
15th Jul 20197:00 amRNSAgreement with Doosan
9th Jul 20197:00 amRNSTrading Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.