Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMI.L Regulatory News (AMI)

  • There is currently no data for AMI

Exploration Update

8 Mar 2007 07:01

Sierra Leone Diamond Company Ld08 March 2007 Immediate Release 8 March 2007 Sierra Leone Diamond Company Limited ("SLDC" or "the Company") Exploration and Diamond Sale Update Sierra Leone Diamond Company Limited (AIM:SLD), the diamond producer andexploration company wholly focused on the country of Sierra Leone is pleased toannounce the following update on its kimberlite and iron ore explorationprojects and its next diamond sale. Kimberlite Exploration As a result of the previous countrywide Reconnaissance Drainage Samplingprogramme undertaken, SLDC has a number of high priority kimberlite indicatormineral (KIM) anomaly prospects which are undergoing detailed follow upsampling. Of those, Lake Popei, (referred to in the Company release dated 17November 2006), has been the subject of further recent follow up work followingthe recovery of over 3,000 visually kimberlitic ilmenite grain samples from aninitial 20 litre stream drainage sample. A selection of these grains were sentfor micro-probing and confirmed as kimberlitic in origin. Infill grid soil sampling has yielded an ovoid target which the company believesto be in the region of 1,300m long and 400m wide, as defined by numbers ofkimberlitic ilmenites grain samples, within which is a central core measuringsome 700m by 150m from which highly positive results, in excess of 200 ilmenitegrains per sample, have been recovered. Grid soil sampling involves taking 10litre samples from the ground surface at 2 metre intervals and combining theseto 10 metre composites along 100 metre spaced grid lines. The Company is now suitably encouraged to commit to a drill programme on thistarget. It is expected that drilling will commence within the third week ofMarch following the delivery of two drill rigs. Initially this target will betested with inclined holes down to a planned depth of 150m. Preliminary resultsfrom this drilling programme are expected to be available by the end of April2007. Grid sampling continues on this project with the aim of defining further drilltargets. Iron Ore SLDC is pleased to announce that the government of Sierra Leone has granted tothe Company an exploration licence extension area immediately to the north ofthe existing Tonkolili project. The Tonkolili licence area, (EXPL05/06), wasincreased from 106 km2 to 209 km2 on 28 February 2007 at a cost of US$16,400.The geophysical magnetic signature of the ore body indicates that the geologicalstructure has a strike extent in the region of 24km. On the southern section of the deposit, SLDC has during the past six monthscarried out a surface and underground channel sampling programme which has beenmanaged by RSG Global Limited ("RSG"), the independent technical consultants.Information has been gathered from channel sampling collected continuously alongsurface grid lines varying in length between 500m and 2km. These grid lines werespaced at 600m intervals perpendicular to the strike of the deposit and 2.5km ofchannel samples collected from 27 underground adits accessing material to up to60m below present day land surface. In total 16.1km of sampling has beenundertaken from 18 surface trenches. With the planned completion of a furtherfour trenches by the end of April 2007 it is estimated that a further 3.12km oftrench sampling will have been generated to complete the 600m grid patternacross the 12km of strike of the original licence area. As a result SLDC willmobilize to site a diamond drill rig to test the vertical extent of the primarydeposit. Drilling is planned to start by the end of March 2007. Infill channel sampling to a 300m grid spacing to generate an estimated 17 km ofsampling is due to commence March 2007 on the southern known mineralised area. Achannel sampling program at 600m spacing is planned for the northern extensionto confirm further mineralisation. This program includes an estimated 28.8 km oftrenching. Channel sampling results are being compiled by RSG and these will beincorporated into a 3D conceptual geological model along with the drillingresults. A report on all assays is expected in April 2007. Additional oresamples have been collected for metallurgical testwork with results also due inApril 2007. Diamond Sale The Company is planning a diamond sale in excess of 10,000 carats to commence inAntwerp towards the end of March 2007. The Company adheres to the KimberleyProcess Certification procedures and as such the sale will be made in fullcompliance with this process. The Sierra Leone Government Gold and Diamond Office has valued the planneddiamond sale at US$379.67 per carat and the Company has engaged the services ofOverseas Diamonds NV ("OD"), an industry regarded diamond marketing companybased in Antwerp, with a view to maximising the sale value. The Company will beannouncing the results of the sale as soon as they become available. Frank Timis, Executive Chairman of SLDC, comments, "The Company is very pleased to have been granted an exploration licenceextension area at the Tonkolili project and we have planned an intensive earlystage exploration program to gain a better understanding of the potential ofthis iron ore deposit. We are also delighted to have engaged the services of awell established diamond marketing Company with a view to maximise the value ofour next diamond sale".Enquiries: Sierra Leone Diamond Company Tel: +44 (0) 1442 257 246David Gadd-ClaxtonJamie Alpen Canaccord Adams Limited Tel: +44 (0) 20 7050 6500Mark AshurstMike Jones Buchanan Communications Tel: +44 (0) 20 7466 5000Bobby MorseBen WilleyNick Melson Notes: The information in this report that relates to Exploration Results, MineralResources and or Ore reserves is based on information compiled by P I Young, Pr.Sci Nat (reg. No 400270/05), who is a Member of the Geological Society of SouthAfrica. Paul Young is a full time employee of the Company and meets therequirements as a qualified person for the purposes of the AIM Guidance Note onMining, Oil and Gas dated March 2006 in terms of the diamond industry.It should be noted that potential quantities in this report are conceptual innature and insufficient exploration has been undertaken to define a MineralResource and it is uncertain if further exploration activities will result inthe determination of a Mineral Resource. Some statements in this news release are forward looking and therefore involveuncertainties or risks that could cause actual results to differ materially.Such forward looking statements include comments regarding exploration work.Actual results could differ materially from those anticipated. The Companydisclaims any obligation to update forward looking statements. This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
21st Nov 200812:57 pmRNSInjunction Claim Withdrawn
12th Nov 200810:13 amRNSAccess Rights- Marampa Infrastructuture Facilities
12th Nov 20087:05 amRNSInfrastructure Lease
12th Nov 20087:00 amRNSBoard Restructuring
31st Oct 20089:51 amRNSHolding(s) in Company
30th Oct 20087:00 amRNSHolding(s) in Company
23rd Oct 200810:45 amRNSStrategic Investment
20th Oct 200811:22 amRNSHolding(s) in Company
20th Oct 200810:23 amRNSHolding(s) in Company
17th Oct 200812:01 pmRNSShareholdings in Company
13th Oct 20084:28 pmRNSAdditional Listing on Issue of Shares
10th Oct 20087:00 amRNSCash Placing
1st Oct 200810:36 amRNSMarampa Completion
30th Sep 20087:00 amPRNInterim Results
25th Sep 20081:28 pmRNSCLIO Injunction Proceedings Resolved
25th Sep 200812:36 pmRNSProceedings Resolved
23rd Sep 20083:48 pmRNSUpdate re: CLIO Injunction
22nd Sep 20082:56 pmRNSCLIO Injunction
22nd Sep 20089:32 amRNSInterim Injunction Granted
17th Sep 200811:39 amRNSInterim Results
9th Sep 20087:00 amRNSRestoration - African Mineral
8th Sep 20084:45 pmRNSResponse to Press Article
8th Sep 200811:45 amRNSSuspension of Trading
8th Sep 200811:45 amRNSSuspension - African Minerals
1st Sep 200811:18 amRNSStrategic Agreement
25th Jul 20087:20 amRNSLicence and Marampa Update
25th Jul 20087:10 amRNSKey Project Update
25th Jul 20087:00 amRNSTonkolili Update
26th Jun 20082:54 pmRNSResult of AGM
16th Jun 20081:54 pmRNSAdditional Listing
9th Jun 200810:51 amRNSAnnual Report and Accounts
27th May 20085:11 pmRNSFourth Diamond Sale
23rd May 20081:17 pmRNSAdditional Listing
19th May 20082:09 pmRNSHolding(s) in Company
15th May 20083:18 pmRNSGrant of Options to Director
15th May 20083:11 pmRNSDirector's Share Dealings
14th May 20087:00 amRNS2007 Audited Results
13th May 20087:20 amRNSHoldings in Company
13th May 20086:00 amRNSStrategic Investment
9th May 200810:25 amRNSHolding(s) in Company
8th May 20084:33 pmRNSAdditional Listing
6th May 200812:02 pmRNSKey Infrastructure MoU
29th Apr 20084:01 pmRNSExercise of Warrants
14th Apr 20081:08 pmRNSCompletion of Acquisition
14th Apr 20087:00 amRNSCompany Presentation
11th Apr 20082:43 pmRNSAppointment of Joint Broker
11th Apr 20082:37 pmRNSAdditional Listing
9th Apr 20087:00 amRNSBoard Appointment
6th Mar 20087:01 amRNSProposed Acquisition
29th Jan 20082:45 pmRNSGrant of Options

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.