Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMER.L Regulatory News (AMER)

  • There is currently no data for AMER

Platanillo-7 Update

30 Dec 2013 07:00

RNS Number : 5070W
Amerisur Resources PLC
30 December 2013
 



 

30 December 2013

 

Amerisur Resources Plc ("Amerisur" or the "Company")

 

Platanillo-7 Update

 

Highlights

· 10th successful new well in the current campaign

· Demonstrates field potential further north

· Strong test flow rates - 3,052 BPD of 30.2 API oil under natural flow (on 34/64" choke)

· Placed on commercial production at approximately 1,300 BOPD (on reduced choke)

· Rig moving to drill Platanillo-16 on platform 3N

 

Amerisur Resources Plc, the oil and gas producer and explorer focused on South America, is pleased to announce an update on the well Platanillo-7 in the Platanillo Field, Colombia, the 10th new well of the current drilling campaign, in addition to three successful sidetracks.

The well has been successfully drilled, on time and under budget, to a total depth of 8,533ft MD, achieving an offset of 1,181ft to the east of Platform 3N.

John Wardle, Chief Executive Officer of Amerisur, commented:

"This is another tremendous result for Amerisur. The geological risk at Platform 3N was always higher than at previous wells simply because we were stepping out beyond the area where wells had been drilled previously. The fact that the structure at 3N and the flow rates surpassed our expectations bodes well for future development wells in the area, underlining the field potential going north. We continue to work with all parties to resolve the constraints on our export processes, and I hope to be able to give an update on the Ecuador export option early in the New Year."

The reservoir section was logged and initial log analysis indicates the presence of 78ft gross, 46ft net oil column in the U sand formation, and 36ft gross, 24ft net oil column in the T sand formation, using Logging While Drilling (LWD) tools, for a total of 114ft gross, 70ft net, slightly greater than the pre-drill prognosis. LWD systems, while offering significant operational advantages, are prone to underestimating oil pay, due to a lower penetration of the signal into the reservoir compared with wire line conveyed tools. The Company therefore considers this analysis to be conservative. As predicted by Amerisur's seismic attributes model, the N sand was not well developed at this location.

The Company has completed the well for commercial production from the U sand. A total of 23ft of the 46ft net oil pay was perforated and flowed 3,052 BPD of 30.2 API oil on test under natural flow over a 34/64" choke with 180 psig at the wellhead and trace water. The well has now been choked back and placed on commercial production at approximately 1,300 BOPD.

The Serinco Rig D-10 is currently being skidded within Platform 3N in order to drill the next well on that pad, Platanillo-16. That well will be drilled to a location 2,428ft to the north east of Platform 3N. The objective of Platanillo-16 is to further develop the strong culmination of the Platanillo field seen on the 3D/3C seismic data and proven by the results of Platanillo-7. Based on the results of Platanillo-7 the Company is currently reviewing the development plan for the central zone.

ENDS

Competent person: Technical information in this announcement has been reviewed by John Wardle Ph.D., the Company's Chief Executive. John Wardle has 28 years' experience in the industry, having worked for BP, Britoil, Emerald Energy and Pebercan, and is a trained drilling engineer.

 

 

ENQUIRIES:

 

Ben Brewerton/Natalia Erikssen,

Tel: +44 (0)207 831 3113

FTI Consulting

 

Stephen Foss/Daniel Conti

Tel: +44 (0)207 653 4000

RBC Capital Markets

 

Chris Sim / Ben Colegrave

Tel: +44 (0)207 597 4000

Investec

 

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLZMMZZFRNGFZM
Date   Source Headline
27th Jan 20167:00 amRNSIssue of Equity
26th Jan 20167:00 amRNSAcquisition of Platino Energy Ltd
19th Jan 20164:35 pmRNSPrice Monitoring Extension
23rd Dec 20153:24 pmRNSReplacement - Adoption of Financial Reporting Std
23rd Dec 20157:00 amRNSAdoption of Financial Reporting Standard
16th Dec 20157:00 amRNSDirector's Interests
1st Dec 20152:10 pmRNSBLOCK LISTING SIX MONTHLY RETURN
1st Dec 20157:00 amRNSEcuador-Colombia Interconnector Update
6th Nov 20157:01 amRNSLoto-2 Update
13th Oct 20157:00 amRNSLoto-2 Update
6th Oct 201512:09 pmRNSIssue of Equity
28th Sep 20157:00 amRNSInterim Results
22nd Sep 20157:00 amRNSLoto-2 Update
15th Sep 20153:25 pmRNSHolding(s) in Company
7th Sep 20157:00 amRNSOperations Update
1st Jul 20153:05 pmRNSIssue of Equity
29th Jun 201511:30 amRNSAcquisition of Petrodorado South America SA
12th Jun 20157:00 amRNSEcuador-Colombia Interconnector Update
1st Jun 20151:50 pmRNSBLOCK LISTING SIX MONTHLY RETURN
22nd May 20152:44 pmRNSHolding(s) in Company
8th May 20157:00 amRNSPipeline Update
6th May 20151:12 pmRNSResult of AGM
29th Apr 20157:00 amRNSOperations Update
22nd Apr 20154:15 pmRNSDirector Dealings
22nd Apr 20157:00 amRNSDirector Dealings
21st Apr 20155:24 pmRNSBoard Change
21st Apr 20157:00 amRNSDirector Dealings
13th Apr 201510:29 amRNSNotice of AGM
13th Apr 20157:00 amRNSDirector Dealings
13th Apr 20157:00 amRNSDirector Dealings
9th Apr 20157:00 amRNSDirector Dealings
8th Apr 20157:05 amRNSLTIP Awards Update
8th Apr 20157:00 amRNSFinal Results
2nd Apr 20155:12 pmRNSLTIP Awards Update
1st Apr 20157:00 amRNSReserves and Resources Update
11th Mar 20157:00 amRNSNotice of Results
13th Feb 20151:30 pmRNSDirector purchase of shares
9th Feb 20157:01 amRNSGrant of Share Options
9th Feb 20157:00 amRNSPipeline Update
2nd Feb 20157:00 amRNSRevised 2015 Plan, Outlook and Guidance Statement
19th Jan 20156:20 pmRNSHolding(s) in Company
5th Jan 20157:00 amRNSDirector Appointment
3rd Dec 201411:13 amRNSNotification of Major Interest in Shares
1st Dec 201410:32 amRNSBlock Listing Six Monthly Return
27th Nov 20149:11 amRNSNotification of Major Interest in Shares
22nd Oct 20147:00 amRNSNew Exploration License in Colombia
7th Oct 20147:00 amRNSPlatanillo-20 Update
30th Sep 20147:00 amRNSHalf Yearly Report
26th Aug 20147:00 amRNSPlatanillo-18 Update
19th Jun 20147:00 amRNSOperations Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.