Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMER.L Regulatory News (AMER)

  • There is currently no data for AMER

Operations Update

9 May 2018 07:00

RNS Number : 4293N
Amerisur Resources PLC
09 May 2018
 

9 May 2018

 

Amerisur Resources Plc ("Amerisur" or the "Company")

 

 Operations Update

 

Amerisur Resources Plc, the oil and gas producer and explorer focused on South America, is pleased to provide an update on operations in Colombia.

 

Platanillo N Sand Drilling

 

The Company is pleased to report good progress on the civil works, a 3.8km new road and a location with three drilling cellars. This progress has been made in spite of adverse weather conditions and the discovery of unconsolidated zones on the route which required additional works to stabilise. The construction is expected to be completed in June, after which Rig D10 will be mobilised to drill Pintadillo-1, the first of up to three wells targeting the N Sand anomaly, which has been identified on 3D seismic. Pintadillo-1 will be a slightly deviated well, with a planned total measured depth of 8,448ft, and is expected to take less than a month to drill and log.

 

The N Sand anomaly at Pintadillo is one of four such anomalies identified by the Company in the central part of the Platanillo block. It is estimated to hold P50 resources of 11.44 mmbo.

 

Put-8 Drilling

 

Amerisur has been informed by the Operator of block Put-8, Vetra Exploration and Production (50%), that the drilling contractor has been slightly delayed in the completion of their previous contract and the spudding of Miraparriba-1 is now planned to begin in June 2018. Miraparriba-1 will be drilled as a directional well to the Miraparriba structure within the Put-8 block.

 

The Miraparriba structure is a low risk U and T sand light oil structural target covered by 3D seismic with gross P50 recoverable resources estimated at 4.4 mmbo by the Operator.

 

Put-8 is a 102,799 acre block which lies adjacent to the west of the Platanillo field.

 

CPO-5

 

The Operator (ONGC Videsh Ltd, 70%) has informed the Company that the preparations for the spudding of the well Indico-1 continue to advance despite adverse weather conditions in the area. The rig is now expected to mobilise in the latter part of June 2018. Mariposa-1 continues to produce in a stable manner and the operation to perforate additional zones in the well is expected to be performed within the next month.

 

Indico-1 is targeting the same play as the successful Mariposa-1 well, but is further up dip in a larger structure. The Operator estimates a gross P50 recoverable resource at Indico-1 of 10.3 mmbo.

 

CPO-5 is located to the south of the prolific Llanos 34 block and to the east of the Corcel fields. The block includes the producing Mariposa-1 well and the evaluation area related to the Loto-1 oil discovery.

 

John Wardle, CEO of Amerisur said:

 

"We are gearing up for a busy period of exploration drilling, targeting 26 mmbo of gross resource over the first three wells."

 

ENDS

Enquiries:

 

Nick Harrison, CFO

Amerisur Resources

 

Tel: +44 (0)330 333 8246

Billy Clegg/Georgia Edmonds

Tel: +44 (0)203 757 4980

Camarco

 

Callum Stewart/Nicholas Rhodes/Ashton Clanfield

Stifel Nicolaus Europe Limited

Tel: +44 (0)20 7710 7600

Chris Sim/George Price

Tel: +44 (0)207 597 4000

Investec

Darrell Uden/Marcus Jackson

RBC Capital Markets

 

Tel: +44 (0)207 653 4000

 

 

Notes to editors

Amerisur Resources is an independent full-cycle oil and gas company focused on South America, with assets in Colombia and Paraguay and production from two fields in Colombia. In 2016 Amerisur successfully built and is 100% owner of the strategic OBA oil transfer line into Ecuador.

 

In Colombia, the Company is operator and has a 100% working interest in the Platanillo block which includes the Platanillo producing field in the Putumayo basin, and holds a 30% non-operated working interest in the CPO-5 block containing the Mariposa-1 producing field in the Llanos basin. Amerisur is currently producing approximately 5,000 bopd while Platanillo production wells are undergoing maintenance.

 

Amerisur has a strong position in the Putumayo basin and has a cluster of near term activity assets around the OBA export line.

 

Standard: These assessments are made in accordance with the standard defined in the SPE/WPC Petroleum Resources Management System (2007).

 

Competent person: Technical information in this announcement has been reviewed by John Wardle Ph.D., the Company's Chief Executive. John Wardle has 32 years' experience in the industry, having worked for BP, Britoil, Emerald Energy and Pebercan, and is a trained drilling engineer.

 

This announcement contains inside information as defined in EU Regulation No. 596/2014 and is in accordance with the Company's obligations under Article 17 of that Regulation.

 

www.amerisurresources.com 

 

Glossary

 

"mmbo"

million barrels of oil

"bo"

barrels of oil

"P50 resources"

the best estimate of the quantity of resources that will actually be recovered. It is equally likely that the actual remaining quantities recovered will be greater or less than the best estimate

 

 

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLGMGGKGRVGRZZ
Date   Source Headline
2nd Jun 20147:00 amRNSBlocklisting Interim Review
7th May 20142:25 pmRNSResult of AGM
7th May 20149:45 amRNSContract Update
25th Apr 20147:00 amRNSPlatanillo-15 Update
22nd Apr 20147:01 amRNSFull Year Results
2nd Apr 20148:17 amRNSReserves and Resources Update - Correction
31st Mar 20147:00 amRNSReserves and Resources Update
24th Mar 20147:00 amRNSPlatanillo-17 Update
18th Feb 20141:55 pmRNSStatement re Directors' Dealings
18th Feb 20141:55 pmRNSGrant of Share Options
13th Feb 20147:00 amRNSOperations Update
3rd Feb 20147:00 amRNSAve-1 Update
30th Jan 20142:30 pmRNSParaguay Update
24th Jan 20147:00 amRNSHolding(s) in Company
31st Dec 20137:00 amRNSAve-1 Update
30th Dec 20137:00 amRNSPlatanillo-7 Update
3rd Dec 20137:00 amRNSDirector Dealings
29th Oct 20137:00 amRNSColombia Update
29th Oct 20137:00 amRNSPlatanillo-14 Update
22nd Oct 201312:50 pmRNSInterim Accounts - Correction
26th Sep 20137:00 amRNSPlatanillo Update
26th Sep 20137:00 amRNSInterim Results
23rd Sep 20138:27 amRNSPlatanillo Update
30th Aug 20137:00 amRNSOperations Update
16th Jul 20137:00 amRNSPlatanillo Update
7th Jun 20139:27 amRNSDirectors' Dealings
6th Jun 20137:00 amRNSOperational Update
3rd Jun 201312:36 pmRNSBlock Listing Six Monthly Return
14th May 20131:04 pmRNSResult of AGM
14th May 20137:00 amRNSAppointment of Non-Executive Director
14th May 20137:00 amRNSOperational Update
18th Apr 20137:00 amRNSPlatanillo Update
17th Apr 20137:00 amRNSPreliminary Results
10th Apr 201310:02 amRNSHolding(s) in Company
8th Apr 20139:00 amRNSNotice of Results
18th Mar 20137:00 amRNSReserves update
18th Mar 20137:00 amRNSPlatanillo Update
7th Feb 20137:00 amRNSGrant of Share Options
6th Feb 20137:00 amRNSPresentation at RBC International E&P Conference
24th Jan 20137:47 amRNSColombia Update
14th Dec 20127:00 amRNSAppointment of Investec as Joint Broker
11th Dec 20127:00 amRNSColombia Update
5th Dec 20127:00 amRNSHolding(s) in Company
3rd Dec 20127:00 amRNSBlock admission and Block Listing 6 Monthly Return
30th Nov 20127:00 amRNSFenix Block Update
28th Nov 20127:00 amRNSPlatanillo-9 Update
31st Oct 20124:18 pmRNSPlatanillo-9 Update - Replacement
31st Oct 20127:00 amRNSPlatanillo-9 Update
25th Oct 20125:28 pmRNSExercise of Options and Directors' Dealings
22nd Oct 201210:55 amRNSCapital Group Companies - Holding(s) in Company

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.