Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAMER.L Regulatory News (AMER)

  • There is currently no data for AMER

Operations Update

12 Oct 2007 07:00

Amerisur Resources PLC12 October 2007 12th October 2007 Amerisur Resources PLC ("the Company") Operations Update Amerisur Resources Plc ('Amerisur'), the oil and gas explorer and developerfocused on South America, is pleased to give the following update on operationsin Colombia. Highlights • Re-entry to Alea 1 successful - production and Long Term Testing to commence during October • Platanillo 1 encounters transition zone and defines limits of field • Platanillo 2 to be drilled shortly to further evaluate structure The re-entry of the Alea-1 well has been completed without operational problemsusing the work over rig Pride 6. The well was flowed at a controlled rate ofapproximately 160 BOPD through a 1/4" choke to observe fluid properties (duringinitial testing of the well in 1988, flow rates in excess of 500 BOPD through a9/16" choke were recorded). The crude oil observed at surface has an API gravityof approximately 32 degrees and zero water. The well has now been closed inagain to conduct sampling and analysis for purposes of reservoir engineering andassessment of the reserves potential of the field. The well is expected to return to production and begin Long Term Testing (whenthe full production potential of the well will be examined) following themobilisation of the drilling rig Pride 17 to the Alea-1 location, as discussedbelow. For operational safety reasons recommencement of production will not takeplace until after the drilling rig Pride 17 has been installed on the location.This is expected to be complete within the next 15 days. Oil production will be delivered to the Santana terminal, operated by GranTierra Energy Colombia for subsequent export. Platanillo-1, the first new well in a 2 well programme, has been drilled to atotal depth of 8,390ft. The reservoir section was encountered 55ft deeper at thePlatanillo-1 location which is located approximately 2,200m from Alea-1, andanalysis of electric logs indicates that the well might be close to thetransition zone between the oil and water columns of the field. The well hastherefore been temporarily plugged to allow the rig to be released to drillPlatanillo-2. Platanillo-1 remains a potential candidate for a subsequentre-entry and sidetrack to evaluate reserves up-dip of the current reservoirentry point. The drilling rig Pride 17 is currently being moved to the Alea-1 location.Platanillo-2 will be drilled directionally from that location, towards aculmination which is expected to be higher on the structure than Alea-1. Theobjective of this exploration well is to examine the potential for additionalreserves in a separate reservoir, the upper "U" sand and confirm the continuityof the lower "U" reservoir. Platanillo-2 will be drilled to a depth ofapproximately 8,300ft over a period of around 30 days. Subsequent testing of thewell will be performed using the existing facilities installed for Alea-1. Amerisur Resources Plc holds a 25% working interest in this block under thePlatanillo E&P Contract with the Colombian National Hydrocarbons Agency (ANH).Repsol YPF holds 35% and Ecopetrol S.A.(40%) is the operator. Dr John Wardle, Amerisur's Chief Executive Officer commented: 'The initial data from Alea-1 are encouraging, and within the next few weeks wewill be able to test the well to its full capacity. The results fromPlatanillo-1 are also extremely important for the definition of the size of thefield at Platanillo, since this firm knowledge allows us to make the bestappraisal and development decisions in the future. With the addition of theinformation from Platanillo-2 we will have a very clear picture of the southernpart of the field, which we can then proceed to evaluate through a Long TermTesting programme. Giles Clarke, Amerisur's Chairman said: 'The re-entry of Alea 1 is a significant moment for Amerisur, marking the firstoil production in our blocks. We look forward to updating shareholders as wemake further progress in the region.' Ends Competent person: Technical information in this announcement has been reviewedby John Wardle Ph.D., the Company's Chief Executive. John Wardle has 23 yearsexperience in the industry, having worked for BP, Britoil, Emerald Energy andPebercan, and is a trained drilling engineer. ENQUIRIES: Billy Clegg/Caroline Stewart, Tel: +44 (0)207 831 3113Financial Dynamics Jerry Keen/Rhod Cruwys, Tel: +44 (0)20 7448 4400Blue Oar Securities Plc This information is provided by RNS The company news service from the London Stock Exchange
Date   Source Headline
30th Sep 20087:00 amRNSPlatanillo - Increase in Working Interest
8th Aug 20087:00 amRNSOperations Update re Platanil
29th Jul 20083:02 pmRNSResult of AGM
29th Jul 20087:00 amRNSAGM Trading Update
3rd Jul 20081:46 pmRNSRe: Share Options
3rd Jul 20087:00 amRNSGrant of Share Options
2nd Jul 20083:50 pmRNSAnnual Report Availability
24th Jun 20087:00 amRNSPreliminary Results
19th Jun 20087:00 amRNSRe: Platanillo Contract
6th Feb 20087:00 amRNSDirectorate Change
1st Feb 200812:05 pmRNSAdditional Listing
10th Jan 20087:00 amRNSUpdate re Platanillo 2
17th Dec 20073:34 pmRNSDirector/PDMR Shareholding
13th Dec 20077:01 amRNSRe: Petex Offshore Inc
13th Dec 20077:01 amRNSInterim Results
30th Nov 20077:01 amRNSOperations Update
20th Nov 20073:00 pmRNSAllotment of Shares
14th Nov 20075:29 pmRNSHolding(s) in Company
24th Oct 20077:00 amRNSOperations Update
23rd Oct 20074:52 pmRNSAdditional Listing
12th Oct 20077:00 amRNSOperations Update
26th Sep 20077:01 amRNSOperations Update
20th Sep 20073:49 pmRNSExercise of Options
6th Sep 20077:53 amRNSPlatanillo re well
22nd Aug 20077:01 amRNSTrading Statement
17th Aug 200711:47 amRNSWebsite Information
31st Jul 200711:35 amRNSTotal Voting Rights
28th Jun 200711:22 amRNSResult of AGM
28th Jun 20077:04 amRNSAGM Statement
11th Jun 20075:46 pmRNSExercise of options
7th Jun 20077:02 amRNSPosting of circular
1st Jun 20077:01 amRNSGrant of Share Options
24th May 20077:01 amRNSShare Placing
11th May 20079:03 amRNSExercise of Options
4th May 20077:00 amRNSDirectorate Change
3rd May 20077:01 amRNSPreliminary Results
27th Apr 20076:20 pmRNSDirector's Interests
25th Apr 20077:00 amRNSRe Agreement
23rd Apr 20077:02 amRNSDrilling Result
18th Apr 20073:56 pmRNSDirector's Interests
17th Apr 20077:01 amRNSBoard Changes
5th Apr 20072:45 pmRNSDrilling Report
4th Apr 20079:05 amRNSHolding(s) in Company
2nd Apr 20078:46 amRNSChange of Adviser and Broker
28th Mar 20073:14 pmRNSPrimavera Update
9th Mar 20077:00 amRNSTotal Voting Rights
8th Mar 20074:29 pmRNSHolding(s) in Company
5th Mar 200710:42 amRNSDirector/PDMR Shareholding
5th Mar 200710:35 amRNSTotal Voting Rights
27th Feb 20077:03 amRNSPlacing and Appointment

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.