Operational Update

24 Jul 2018 07:00

RNS Number : 5093V
Amerisur Resources PLC
24 July 2018
 

24 July 2018

 

Amerisur Resources Plc ("Amerisur" or the "Company")

 

Operational Update

Amerisur Resources Plc, the oil and gas producer and explorer focused on South America, is pleased to provide an update on operations in Colombia.

Following a technical review of well performance, a work over of the Platanillo-22 well has been initiated in order to recover production capacity in this important well. The Platanillo-22 well has been producing since April 2017, however following a pump change in the well in April 2018, fluid production declined. The Company conducted an organic treatment on the well in June 2018 which, while partially successful, did not fully resolve the fluid decline issues. The Company therefore took the decision to conduct a workover on the well in an effort to permanently resolve the production decline.

Given limited workover rig availability currently in the area, the Rig D-10 (the rig that has been used to drill the Company's exploration and development wells at Platanillo) was partially mobilised to the well in order to perform the workover. The well completion has now been removed from the well and electrical logs are being run to measure the integrity of cement, the condition of the perforated intervals and the reservoir oil saturation, amongst other parameters. The forward programme to return the well to production will be decided post analysis of these logs. Should the forward programme involve an isolation and re-perforation of the reservoir interval as per management expectations, the operation is expected to take approximately ten days.

Civil works for the Pintadillo-1 location in the Platanillo block are almost complete following heavy rains and the conductor casings will be installed in the next few days. Following the Platanillo-22 work over, Rig D-10 will be mobilised to location to drill Pintadillo-1. The N Sand anomaly at Pintadillo is one of four such anomalies identified by the Company in the central part of the Platanillo block. It is estimated to hold P50 resources of 11.44 mmbo.

In the CPO-5 block in the Llanos basin, which is operated by ONGC, civil works have now been completed and the well Indico-1 is expected to spud in Q3 2018 as previously guided. Indico-1 is targeting the same play as the successful Mariposa-1 well but is further up dip in a larger structure. The Operator estimates a gross P50 recoverable resource at Indico-1 of 10.3 mmbo.

In the PUT-8 block, the operator Vetra has informed Amerisur that the well Miraparriba-1 is expected to spud in Q3 2018 as previously guided. The Miraparriba structure is a low risk U and T sand light oil structural target covered by 3D seismic with gross P50 recoverable resources estimated at 4.4 mmbo by the Operator.

The Chiritza re-pumping station project continues to advance well. The tie-in of the Chiritza manifold to the RODA line is expected to be performed shortly. Once commissioned and in operation, the Company will have an increased minimum transport capacity with Petroamazonas EP and RODA of 9,000 bopd.

ENDS

 

Enquiries:

 

Nick Harrison, CFO

Amerisur Resources

 

Tel: +44 (0)330 333 8246

Billy Clegg / Georgia Edmonds

Camarco

 

Tel: +44 (0)203 757 4980

Callum Stewart / Nicholas Rhodes / Ashton Clanfield

Stifel Nicolaus Europe Limited

 

Tel: +44 (0)20 7710 7600

Chris Sim / Alexander Ruffman

Investec

 

Tel: +44 (0)207 597 4000

Paul Shackleton / Dan Gee-Summons

Arden Partners plc

Tel: +44 (0)20 7614 5900

 

 

Notes to editors

Amerisur Resources is an independent full-cycle oil and gas company focused on South America, with assets in Colombia and Paraguay and production from two fields in Colombia. In 2016 Amerisur successfully built and is 100% owner of the strategic OBA oil transfer line into Ecuador.

 

In Colombia, the Company is operator and has a 100% working interest in the Platanillo block which includes the Platanillo producing field in the Putumayo basin, and holds a 30% non-operated working interest in the CPO-5 block containing the Mariposa-1 producing field in the Llanos basin.

 

Amerisur has a strong position in the Putumayo basin and has a cluster of near term activity assets around the OBA export line.

 

Standard: These assessments are made in accordance with the standard defined in the SPE/WPC Petroleum Resources Management System (2007).

 

Competent person: Technical information in this announcement has been reviewed by John Wardle Ph.D., the Company's Chief Executive. John Wardle has 32 years' experience in the industry, having worked for BP, Britoil, Emerald Energy and Pebercan, and is a trained drilling engineer.

 

This announcement contains inside information as defined in EU Regulation No. 596/2014 and is in accordance with the Company's obligations under Article 17 of that Regulation.

 

www.amerisurresources.com 

 

 

Glossary

 

"bopd"

 

barrels of oil

"mmbo"

 

million barrels of oil

"P50 resources"

the best estimate of the quantity of resources that will actually be recovered. It is equally likely that the actual remaining quantities recovered will be greater or less than the best estimate

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDPGUPUMUPRGBW
Date   Source Headline
22nd Mar 201711:03 amRNSHolding(s) in Company
20th Mar 20172:28 pmRNSNotification of Major Interest in Shares
16th Mar 20177:44 amRNSCaguan-Putumayo Basin Acquisitions
10th Mar 20174:35 pmRNSPrice Monitoring Extension
9th Mar 201712:47 pmRNSPlatanillo Operations Update
9th Mar 20177:00 amRNSMonthly Production and OBA Throughput Update
31st Jan 201711:34 amRNSTotal Voting Rights
27th Jan 20177:00 amRNSHolding(s) in Company
24th Jan 20177:00 amRNSPlatanillo 24 Update
19th Jan 20175:05 pmRNSHolding(s) in Company
9th Jan 20177:24 amRNSPlatanillo-24 Update
3rd Jan 20177:00 amRNSBoard Changes and Remuneration Update
23rd Dec 20167:00 amRNSSpudding of Platanillo 24
22nd Dec 201610:51 amRNSDirector/PDMR Shareholding
20th Dec 20167:00 amRNSColombia Asset Acquisition
16th Dec 20167:00 amRNSColombia Business Update
2nd Dec 20169:51 amRNSBlock listing six monthly return
1st Nov 20167:00 amRNSHolding(s) in Company
27th Oct 20161:12 pmRNSOBA Pipeline Operational
27th Oct 201612:45 pmRNSOBA Pipeline Operational
3rd Oct 20162:55 pmRNSHolding(s) in Company
3rd Oct 20167:00 amRNSOBA Pipeline Update
21st Sep 20167:00 amRNSAnalyst site visit and 2017 guidance
15th Sep 20167:00 amRNSInterim Results
12th Jul 20167:00 amRNSOperations Update
4th Jul 201612:21 pmRNSHolding(s) in Company
27th Jun 20163:59 pmRNSHolding(s) in Company
23rd Jun 20162:35 pmRNSCommencement of Drilling on Platanillo Field
17th Jun 20167:05 amRNSCoati Update
17th Jun 20167:05 amRNSOperations Update
3rd Jun 20167:00 amRNSOperations Update
1st Jun 20169:02 amRNSBLOCK LISTING SIX MONTHLY RETURN
31st May 20167:00 amRNSIndependent Non-executive Director Appointment
23rd May 20163:31 pmRNSLong Term Incentive Plan ("LTIP") Awards
4th May 20163:20 pmRNSResult of AGM
4th May 20169:30 amRNSAGM Statement
22nd Apr 20167:00 amRNSSpudding of Jaguareté-1, Paraguay
8th Apr 20167:00 amRNSNotice of AGM
7th Apr 20167:00 amRNSFinal Results for the year ended 31 December 2015
5th Apr 20169:17 amRNSHolding(s) in Company
29th Mar 20167:00 amRNSReserves Update
16th Mar 20167:00 amRNSIssue of Equity
14th Mar 20164:47 pmRNSHolding(s) in Company
14th Mar 20164:46 pmRNSHolding(s) in Company
14th Mar 20167:00 amRNSHolding(s) in Company
9th Mar 201610:24 amRNSResults of placing
9th Mar 20167:00 amRNSProposed Placing
4th Mar 20161:40 pmRNSHolding(s) in Company
29th Feb 20167:00 amRNSChange of Adviser
18th Feb 20167:00 amRNSEcuador-Colombia Interconnector Update

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.