The latest Investing Matters Podcast episode featuring Jeremy Skillington, CEO of Poolbeg Pharma has just been released. Listen here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksAminex Regulatory News (AEX)

Share Price Information for Aminex (AEX)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 1.125
Bid: 0.00
Ask: 0.00
Change: 0.00 (0.00%)
Spread: 0.15 (14.286%)
Open: 0.00
High: 0.00
Low: 0.00
Prev. Close: 1.125
AEX Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Results of Competent Persons Report

5 Feb 2018 10:00

RNS Number : 8904D
Aminex PLC
05 February 2018
 

5th February 2018

 

 

Aminex plc

 ("Aminex" or "the Company")

 

Independent Report shows Significant Resource Upgrade

 

Aminex advises that RPS Energy Consultants Limited ("RPS") has now completed a Competent Person's Report ("CPR") over the Company's entire Tanzania asset base and that their findings have established a significant resource upgrade. This result, taken together with the results of the Ntorya Gas Commercialisation Study prepared by io oil & gas consulting last year, confirms the feasibility of developing the Ntorya gas field for commercial production. RPS, a subsidiary of RPS Group, is an internationally-reputed reporting firm and io oil & gas consulting ("io") is a joint venture between Baker Hughes, a GE company, and McDermott.

 

Principal Results

 

· Ntorya Pmean GIIP: increased to 1.87 TCF, 44% over previously reported management estimates of 1.3 TCF and a 12-fold increase over the 2015 CPR

· Ntorya 2C gross Contingent Resources: increased to 762.8 BCF after the results of the Ntorya-2 well (approximately 11 times increase from 2015 CPR). This comprises 80.6 BCF of Contingent Resources "Development Pending" from a three well development and 682.2 BCF of Contingent Resources "Development Unclarified" (see Appendix for full range of Contingent Resources)

· Ntorya Development: io's report indicates, based on reasonable assumptions, that a gas development project at Ntorya could be viable with three wells, two of which have already been drilled and a third (Ntorya-3) is scheduled for drilling this year, producing into a raw-gas pipeline to the Madimba gas plant, approximately 33 km away

· Kiliwani North-1: The Kiliwani North structure has Pmean GIIP of 30.8 BCF according to RPS. Approximately 6.4 BCF has been produced from the Kiliwani North-1 well. RPS estimates 2P Reserves ascribed to the well, after compression is installed, to be 1.94 BCF (see Appendix for full range of Reserves)

· Kiliwani South: new lead identified, ascribed 57 BCF Pmean GIIP (management estimate)

 

The Ntorya gas project is a component of the Ruvuma PSA in the extreme south-east of Tanzania where the Company has already successfully drilled Ntorya-1 and Ntorya-2. The RPS CPR significantly exceeds management estimates published following Ntorya-2 drilling and testing and also exceeds the Company's subsequent upgrade which was reported to shareholders following in-house technical work.

 

In addition, the Company is very encouraged by io's study, which indicates, based on reasonable assumptions, that Ntorya could be developed with three wells, two of which have already been drilled and tested. The io study indicates that an early production system, which will limit upfront capital expenditure and enable cash-flow funded further development, is a realistic and achievable proposition. Further detail of the development plan will be made available in due course.

 

On the Kiliwani North Development Licence ("KNDL"), where approximately 6.4 BCF has been produced to date, a new prospect has been identified and defined as Kiliwani South, with 57 BCF Pmean GIIP. As the KNDL does not expire until 2036, the Company is conducting technical work to assess the feasibility of further drilling in this area. Successful wells could be brought onstream into the Songo Songo gas plant, providing enhanced revenues for the Company and its partners.

 

Finally, at the Company's Nyuni Area licence, the Pmean GIIP of 4.8 TCF (management estimate) remains as previously reported in the 2012 CPR and 2015 CPR (taking account of relinquishments since 2015), pending the acquisition of further data over the area.

 

An updated company presentation will be added to the website shortly at www.aminex-plc.com. Aminex is hosting a presentation to a group of sell-side analysts later today. Apart from what has been disclosed above, no new material information will be disclosed at this presentation.

 

Appendix

 

 

Gas Contingent Resources (Bscf)

Gross (100%) License Basis

Ndovu's Net 1 Working Interest Basis

Ndovu's Net Entitlement Basis

1C

2C

3C

1C

2C

3C

1C

2C

3C

Development Pending

25.5

80.6

212.9

19.1

60.4

159.7

16.3

51.6

123.3

Development Unclarified

342.3

682.2

949.5

256.7

511.6

712.1

194.9

353.6

465.5

1 Company Working Interest is 75%

RPS Estimates of Contingent Resources in Ntorya

 

Gas Reserves (Bscf)

Gross1 (100%) License Basis

Ndovu's Net 2 Working Interest Basis

Ndovu's Net Entitlement Basis

1P

2P

3P

1P

2P

3P

1P

2P

3P

Kiliwani North3

1.06

1.94

3.75

0.58

1.06

2.05

0.52

0.95

1.83

1 Gross Field Reserves after economic limit test (ELT)

2 Company Working Interest is 57.4474%

3 Reserves were estimated and reported on 15th December 2017 and have not been updated to reflect minor production achieved in the remainder of 2017

RPS Estimates of Reserves for Kiliwani North Development as at 31st December 2017

Glossary

 

2012 CPR The competent person's report prepared by RISC Consultants in June 2012

2015 CPR The competent person's report prepared by LR Senergy in May 2015

Contingent Resources Those quantities of petroleum estimated, as of a given date, to be potentially recoverable from known accumulations by application of development projects but which are not currently considered to be commercially recoverable due to one or more contingencies. Contingent Resources are a class of discovered recoverable resources. 1C, 2C and 3C are confidence levels equivalent to the P90, P50 and P10 confidence, respectively

Reserves Those quantities of petroleum anticipated to be commercially recoverable by application of development projects to known accumulations from a given date forward under defined conditions. Reserves must further satisfy four criteria: They must be discovered, recoverable, commercial, and remaining (as of a given date) based on the development project(s) applied. 1P, 2P and 3P are confidence levels equivalent to the P90, P50 and P10 confidence, respectively

BCF or Bscf Billions of standard cubic feet of natural gas

GIIP Gas initially in place

km Kilometres

Ndovu Ndovu Resources Limited, a wholly owned subsidiary of Aminex

Pmean The probability of encountering the mean volume

TCF Trillions of cubic feet of natural gas

 

This announcement contains inside information.

 

 

Ends

 

Aminex PLC

Jay Bhattacherjee, Chief Executive Officer +44 (0) 20 3198 8415

Max Williams, Chief Financial Officer

 

Investec Bank plc

Chris Sim +44 (0) 207 597 4000

 

Shore Capital 

Jerry Keen +44 (0) 20 7408 4090

 

Davy 

Brian Garrahy +353 (0) 1 679 6363

 

Camarco 

Billy Clegg / Gordon Poole / James Crothers +44 (0) 20 3757 4980

 

 

About RPS Group

http://www.rpsgroup.com/Energy.aspx 

 

About io oil & gas consulting

http://iooilandgas.com/about-io/

This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
UPDVELBBVLFLBBV
Date   Source Headline
29th Feb 20247:00 amRNSRuvuma Seismic Update
10th Jan 20242:49 pmRNSRuvuma Gas Sales Agreement signed
31st Oct 20235:00 pmRNSKiliwani Operations Update
29th Sep 20237:00 amRNS2023 Half-Yearly Financial Report
1st Sep 20237:00 amRNSDirectorate Change
13th Jul 20234:26 pmRNSResult of AGM
12th Jul 20237:00 amRNSRuvuma Operations Update
20th Jun 20237:00 amRNSNotice of AGM
2nd Jun 20233:13 pmRNSDirector/PDMR Shareholding
26th May 20237:00 amRNSPublication of New Research
28th Apr 20236:13 pmRNSFinal Results and Annual Report 2022
2nd Mar 20237:00 amRNSStrategy/Company/Ops Update
6th Feb 202311:05 amRNSSecond Price Monitoring Extn
6th Feb 202311:00 amRNSPrice Monitoring Extension
6th Feb 20239:05 amRNSSecond Price Monitoring Extn
6th Feb 20239:00 amRNSPrice Monitoring Extension
28th Nov 202211:05 amRNSSecond Price Monitoring Extn
28th Nov 202211:00 amRNSPrice Monitoring Extension
28th Nov 20227:00 amRNSRuvuma Commercial Update
1st Nov 202211:05 amRNSSecond Price Monitoring Extn
1st Nov 202211:00 amRNSPrice Monitoring Extension
1st Nov 20229:05 amRNSSecond Price Monitoring Extn
1st Nov 20229:00 amRNSPrice Monitoring Extension
1st Nov 20227:23 amRNSRuvuma Operations Update
6th Oct 20224:41 pmRNSSecond Price Monitoring Extn
6th Oct 20224:35 pmRNSPrice Monitoring Extension
30th Sep 20227:00 amRNS2022 Half-Yearly Financial Report
1st Sep 202210:59 amRNSRuvuma PSA
1st Sep 20227:00 amRNSRuvuma Seismic and Commercial Update
18th Aug 20222:05 pmRNSSecond Price Monitoring Extn
18th Aug 20222:00 pmRNSPrice Monitoring Extension
18th Aug 202211:05 amRNSSecond Price Monitoring Extn
18th Aug 202211:00 amRNSPrice Monitoring Extension
8th Aug 20227:00 amRNSKiliwani Operations Update
1st Aug 20227:00 amRNSStrategy/Company/Ops Update
13th Jul 20224:23 pmRNSRuvuma PSA
6th Jun 20222:06 pmRNSSecond Price Monitoring Extn
6th Jun 20222:00 pmRNSPrice Monitoring Extension
1st Jun 20223:41 pmRNSTotal Voting Rights
26th May 20224:04 pmRNSResult of AGM
4th May 20227:00 amRNSNotice of AGM
11th Apr 20227:00 amRNSFinal Results and Annual Report 2021
8th Apr 20227:00 amRNSTanzania Operations Update
1st Apr 20224:41 pmRNSSecond Price Monitoring Extn
1st Apr 20224:36 pmRNSPrice Monitoring Extension
1st Apr 20222:05 pmRNSSecond Price Monitoring Extn
1st Apr 20222:00 pmRNSPrice Monitoring Extension
1st Apr 202211:09 amRNSSuccessful Placing to Fund Aminex to First Gas
28th Mar 20222:05 pmRNSSecond Price Monitoring Extn
28th Mar 20222:00 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.