Gordon Stein, CFO of CleanTech Lithium, explains why CTL acquired the 23 Laguna Verde licenses. Watch the video here.

Less Ads, More Data, More Tools Register for FREE

Pin to quick picksActive Energy Regulatory News (AEG)

Share Price Information for Active Energy (AEG)

London Stock Exchange
Share Price is delayed by 15 minutes
Get Live Data
Share Price: 0.40
Bid: 0.35
Ask: 0.45
Change: 0.00 (0.00%)
Spread: 0.10 (28.571%)
Open: 0.40
High: 0.40
Low: 0.40
Prev. Close: 0.40
AEG Live PriceLast checked at -

Watchlists are a member only feature

Login to your account

Alerts are a premium feature

Login to your account

Engineering progress at CoalSwitch plant Lumberton

3 Dec 2020 07:00

RNS Number : 3485H
Active Energy Group PLC
03 December 2020
 

Active Energy Group Plc / EPIC: AEG / Sector: Alternative Energy

3 December 2020

Active Energy Group Plc

("Active Energy", "AEG", or the "Company")

Engineering progress at CoalSwitch™ reference plant at Lumberton

 

Active Energy, the London quoted international biomass based renewable energy and forestry management business, is pleased to announce an operational update on the development of the Company's CoalSwitch™ reference plant (the "Plant") at its Lumberton site.

Highlights:

· Player Design Inc. ("Player Design") were appointed in September 2020 to complete the engineering and construction process for the Plant

· Additional equipment has been sourced and Active Energy has commenced the procurement process

· Construction crews will commence work in January 2021 with commissioning of the plant expected during Q2 2021

· AEG is in active discussions with prospective customers for the delivery of the next generation biomass fuels, including CoalSwitchin the USA

 

Following the award of the Air and Construction Permit (the "Permit") by the NC Division of Air Quality ("DAQ") in August 2020, AEG appointed Player Design to complete the engineering process for the Plant. Player Design is a market leading engineering service business focused as an EPC provider for the provision of drying and energy systems. Player Design has offices in the US and has completed major projects in North America, South East Asia and Australia. They have recently completed the construction of a series of EPC Pellet Plants worldwide, including a latest project in Canada producing up to 200,000 MT per annum of pellets.

Over the last 8 weeks, Player Design performed an independent analysis of the CoalSwitch™ process, and plant design, with particular reference to the emission control system in accordance with the requirements of the Permit. This analysis has resulted in some changes to the existing design and specification for the Plant to ensure that the new plant can be an operating platform to produce the first versions of biomass fuels with CoalSwitch™ specifications and operate with an initial capacity of up to 3 tonnes per hour.

The revised plant design has utilised much of the equipment used in the previous design developed in Utah. Nonetheless additional equipment resulting from the revised analysis will be required. This equipment has already been identified and has now been sourced directly from within the US. AEG is procuring this equipment immediately with deliveries to Lumberton scheduled to commence before year end and prior to the commencement of construction work in early January 2021. The layout of Lumberton's CoalSwitch™ plant will be made available on the Company's website as soon as possible.

Both AEG and Player Design anticipate commissioning of the Plant to commence in Q2 2021 to enable the first deliveries of CoalSwitch™ fuels before mid-year. AEG is also currently in active discussions with a number of prospective utility and power customers in the USA to test the CoalSwitch™ fuels as soon as practicable.

Tyler Player, CEO of Player Design, said:

"Working with Active Energy provides Player Design with a unique opportunity to better understand the capabilities of next generation biomass fuels, using waste resources and in particular the impact CoalSwitch™ will have. Our work to date has already validated Active Energy's initial analysis on CoalSwitch™ and we now look forward to working with the team to have the commercial scale Lumberton facility in production as soon as possible and then on further CoalSwitch™ projects with Active Energy."

 

Michael Rowan, CEO of Active Energy Group, said:

"We have been making rapid progress at Lumberton since the award of the Permit in August 2020 and we are continuing the pace as we seek to commission the Plant as soon as possible in Q2 2021. With the additional support from Player Design, we expect the pace of our activities to accelerate to reflect the market opportunities now presenting themselves both in the US and internationally. There is increasing customer interest for both the next generation biomass products, including CoalSwitch™ and the underlying Coalswitch™ production technologies. We look forward to providing the market with further updates as key milestones within the Plant's construction plans are achieved in the coming weeks and we approach our long term goal of commercialising AEG's next generation biomass product in 2021."

This announcement contains inside information for the purposes of Article 7 of Regulation (EU) 596/2014.

ENDS

Enquiries

Active Energy Group Plc

Michael Rowan

Chief Executive Officer

Antonio Esposito

Chief Commercial Officer

 

 www.aegplc.com

SP Angel Corporate Finance LLP

Nominated Adviser and Broker

 

David Hignell / Caroline Rowe

Office: +44 (0)20 3470 0470

Allenby Capital Limited

Joint Broker

Amrit Nahal / Nick Naylor

Office: +44 (0)20 3328 5656

Camarco

Financial PR Adviser

Gordon Poole / Tom Huddart / Emily Hall

aeg@camarco.co.uk

Office: +44 (0) 20 3757 4980

 

About Active Energy Group:

Active Energy Group plc is a London listed (AIM: AEG) renewable energy company that has developed a proprietary technology which transforms low-cost biomass material into high-value green fuels. Its patented product CoalSwitch™ is the world's only drop-in biomass fuel that can be mixed at any ratio with coal or completely replace coal in existing coal-fired power stations without requiring plant modification. Active Energy Group's immediate strategic focus is the production and commercialisation of CoalSwitch™ and a low emission CoalSwitch™ blend that utilises other waste materials.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
MSCEAPAAEFXEFFA
Date   Source Headline
2nd Feb 20217:00 amRNSConfirmation of successful Fundraising of £7m
1st Feb 20214:35 pmRNSPrimaryBid.com Offer
1st Feb 20214:30 pmRNSProposed Fundraising, CLN Restructuring
14th Jan 20214:21 pmRNSStandard form for notification of major holdings
13th Jan 20217:00 amRNSConversion of Convertible Loan Notes
11th Jan 20217:00 amRNSLayout images of CoalSwitch™ reference plant
6th Jan 202111:05 amRNSSecond Price Monitoring Extn
6th Jan 202111:00 amRNSPrice Monitoring Extension
4th Jan 20219:05 amRNSSecond Price Monitoring Extn
4th Jan 20219:00 amRNSPrice Monitoring Extension
31st Dec 202011:06 amRNSSecond Price Monitoring Extn
31st Dec 202011:00 amRNSPrice Monitoring Extension
29th Dec 202011:05 amRNSSecond Price Monitoring Extn
29th Dec 202011:00 amRNSPrice Monitoring Extension
23rd Dec 20209:05 amRNSSecond Price Monitoring Extn
23rd Dec 20209:00 amRNSPrice Monitoring Extension
22nd Dec 20202:06 pmRNSSecond Price Monitoring Extn
22nd Dec 20202:01 pmRNSPrice Monitoring Extension
22nd Dec 202011:06 amRNSSecond Price Monitoring Extn
22nd Dec 202011:00 amRNSPrice Monitoring Extension
22nd Dec 20209:05 amRNSSecond Price Monitoring Extn
22nd Dec 20209:00 amRNSPrice Monitoring Extension
22nd Dec 20207:00 amRNSFirst order for CoalSwitch™ received
10th Dec 20207:00 amRNSPatent Awarded for CoalSwitch™
3rd Dec 20207:00 amRNSEngineering progress at CoalSwitch plant Lumberton
23rd Nov 20207:00 amRNSAppointment of Finance Director
30th Oct 20207:00 amRNSTotal Voting Rights
5th Oct 20202:31 pmRNSConversion of existing Convertible Loan Notes
30th Sep 20202:46 pmRNSResult of AGM
30th Sep 20202:32 pmRNSTotal Voting Rights
29th Sep 20209:45 amRNSHolding(s) in Company
29th Sep 20207:00 amRNSInterim Results for Six Months Ended 30 June 2020
9th Sep 20207:00 amRNSStandard form for notification of major holdings
7th Sep 20204:30 pmRNSNotice of Annual General Meeting
7th Sep 202012:28 pmRNSPlacing Completion & Share Capital Reorganisation
4th Sep 20207:00 amRNSAwarded London Stock Exchange's Green Economy Mark
25th Aug 20207:00 amRNSConversion of existing Convertible Loan Notes
20th Aug 20207:00 amRNSConditional Placing to raise £1.510 million
4th Aug 20207:00 amRNSConstruction and Air Permit Granted
31st Jul 20207:00 amRNSTotal Voting Rights
23rd Jul 202011:05 amRNSSecond Price Monitoring Extn
23rd Jul 202011:00 amRNSPrice Monitoring Extension
1st Jul 20204:40 pmRNSSecond Price Monitoring Extn
1st Jul 20204:35 pmRNSPrice Monitoring Extension
30th Jun 20207:00 amRNSPosting of 2019 Annual Report
26th Jun 20207:00 amRNSConversion of Convertible Loan Notes
23rd Jun 20207:00 amRNSConstruction and Air Permit Meeting Complete
22nd Jun 20207:00 amRNSOperational Update & £800,000 Fundraising
4th Jun 20204:41 pmRNSSecond Price Monitoring Extn
4th Jun 20204:36 pmRNSPrice Monitoring Extension

Due to London Stock Exchange licensing terms, we stipulate that you must be a private investor. We apologise for the inconvenience.

To access our Live RNS you must confirm you are a private investor by using the button below.

Login to your account

Don't have an account? Click here to register.

Quickpicks are a member only feature

Login to your account

Don't have an account? Click here to register.