RE: Above expectations28 Apr 2026 09:49
So on the drilling J75-P. I thought it had ove run as (i) rig didn't move and (ii) no material production up lift from cargo timings.
Don't get me wrong production is doing ok - still sort of 70K, or just above. Top end of guidance.
So I think whats happened is they've drilled 2 wells from the same location as they mention logs on the next well looking favourable. Meaning drilling is not behind schedule. If anything it maybe ahead.